Loading…
A practical heuristic for the group technology economic lot scheduling problem
In some flexible manufacturing systems, group technology principles divide parts naturally into groups so that substantial set-ups occur only when switching production between groups. We discuss the scheduling of one such real-life manufacturing process. We develop a practical heuristic for the econ...
Saved in:
Published in: | International journal of production research 1990-04, Vol.28 (4), p.709-722 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In some flexible manufacturing systems, group technology principles divide parts naturally into groups so that substantial set-ups occur only when switching production between groups. We discuss the scheduling of one such real-life manufacturing process. We develop a practical heuristic for the economic lot scheduling problem in this group technology environment. The heuristic is relatively simple, yet performs well. An example is solved in detail. A computational study verifies the heuristic's capabilities and suggests extensions for improvement. |
---|---|
ISSN: | 0020-7543 1366-588X |
DOI: | 10.1080/00207549008942750 |