Loading…

A practical heuristic for the group technology economic lot scheduling problem

In some flexible manufacturing systems, group technology principles divide parts naturally into groups so that substantial set-ups occur only when switching production between groups. We discuss the scheduling of one such real-life manufacturing process. We develop a practical heuristic for the econ...

Full description

Saved in:
Bibliographic Details
Published in:International journal of production research 1990-04, Vol.28 (4), p.709-722
Main Authors: KUO, HSIU-WEI, INMAN, ROBERT R.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:In some flexible manufacturing systems, group technology principles divide parts naturally into groups so that substantial set-ups occur only when switching production between groups. We discuss the scheduling of one such real-life manufacturing process. We develop a practical heuristic for the economic lot scheduling problem in this group technology environment. The heuristic is relatively simple, yet performs well. An example is solved in detail. A computational study verifies the heuristic's capabilities and suggests extensions for improvement.
ISSN:0020-7543
1366-588X
DOI:10.1080/00207549008942750