Loading…
Real experience in the connection of wind power production in distribution network
For the implantation of the wind farm at the El Perdon site, numerous measurements were made of wind direction and speed. These measurements made it possible to predict a high number of hours of operation annually and an important energy production. Moreover, it was necessary to determine the ideal...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | For the implantation of the wind farm at the El Perdon site, numerous measurements were made of wind direction and speed. These measurements made it possible to predict a high number of hours of operation annually and an important energy production. Moreover, it was necessary to determine the ideal connection point to the network that would guarantee the removal (evacuation) of the energy produced and to study the impact of the wind farm in order to preserve the supply quality parameters already set by IBERDROLA. Finally, the results of real operation and the measurements carried out are shown, to prove that the voltage and frequency quality are as forecast. (5 pages) |
---|---|
ISSN: | 0537-9989 |
DOI: | 10.1049/cp:19970607 |