Minimizing Single-Machine Completion Time Variance
In this article the problem of minimizing the completion time variance in n -job, single-machine scheduling is considered. The release times for all jobs are assumed to be zero. A new quadratic integer programming formulation is introduced. A Lagrangian relaxation (LR) procedure is developed to find...
Saved in:
Published in: | Management science 1995-09, Vol.41 (9), p.1448-1455 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In this article the problem of minimizing the completion time variance in n -job, single-machine scheduling is considered. The release times for all jobs are assumed to be zero. A new quadratic integer programming formulation is introduced. A Lagrangian relaxation (LR) procedure is developed to find a lower bound (LB) to the optimal objective value. When the number of jobs is between 100 and 500, our computational study shows that the lower bounds obtained by the LR procedure are very close to the best known objective values. A new heuristic algorithm is also described. The first phase of the heuristic algorithm is a construction procedure whose purpose is to identify a good initial sequence. The second phase is an improvement procedure based on pairwise interchanges. The new heuristic algorithm provides improved solutions compared to the best known heuristic. |
---|---|
ISSN: | 0025-1909 1526-5501 |
DOI: | 10.1287/mnsc.41.9.1448 |