Loading…

138-KV Six-Phase Uprating of a 138-KV Double-Circuit Line

Results of a study of the terminal equipment design and costs for uprating the Allegheny Power Service Corporation 138-kV double-circuit Charleroi-Yukon 1ine to 138-kV six-phase or 230-kV double-circuit operation are presented.

Saved in:
Bibliographic Details
Published in:IEEE transactions on power apparatus and systems 1985-09, Vol.PAS-104 (9), p.2547-2554
Main Authors: Guyker, W. C., Shankle, D. F.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Results of a study of the terminal equipment design and costs for uprating the Allegheny Power Service Corporation 138-kV double-circuit Charleroi-Yukon 1ine to 138-kV six-phase or 230-kV double-circuit operation are presented.
ISSN:0018-9510
2995-6323
DOI:10.1109/TPAS.1985.319018