Loading…

Two issues in the evaluation of job-shop schedules

Two issues are examined concerning the evaluation of job-shop schedules. First, machine and labor cost/utilization are suggested as alternatives to physical utilization criteria. Secondly, an exploration is made of the use of Kiviat Charts as a means of integrating multidimensional criteria for the...

Full description

Saved in:
Bibliographic Details
Published in:Omega (Oxford) 1976, Vol.4 (3), p.313-320
Main Authors: Borovits, Israel, Ein-Dor, Phillip
Format: Article
Language:English
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Two issues are examined concerning the evaluation of job-shop schedules. First, machine and labor cost/utilization are suggested as alternatives to physical utilization criteria. Secondly, an exploration is made of the use of Kiviat Charts as a means of integrating multidimensional criteria for the overall evaluation of the quality of job shop schedules.
ISSN:0305-0483
1873-5274
DOI:10.1016/0305-0483(76)90020-7