An empirically verified project risk maturity model: Evidence from Indonesian construction industry
Purpose - The purpose of this paper is to develop and to empirically verify a model of project risk management maturity (PRMM). Design/methodology/approach - Theoretical work to develop the initial model of risk maturity. Empirical study by a cross-sectional survey to the Indonesian construction ind...
Saved in:
Published in: | International journal of managing projects in business 2014-04, Vol.7 (2), p.263-284 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Purpose - The purpose of this paper is to develop and to empirically verify a model of project risk management maturity (PRMM). Design/methodology/approach - Theoretical work to develop the initial model of risk maturity. Empirical study by a cross-sectional survey to the Indonesian construction industry. Findings - A new model of PRMM is developed and empirically tested. The model is valid (face validity, content validity, discriminant validity, convergent validity, and criterion validity) and reliable. Research limitations/implications - A more comprehensive, follow-up study is required to gain more insights on the actual maturity level of Indonesian construction industry. Practical implications - The model is applicable to assess the organizational maturity level which in turn could be used for improving organization performance. Originality/value - The work demonstrates a novel approach in developing models by emphasizing on the empirical verification. |
---|---|
ISSN: | 1753-8378 1753-8386 |
DOI: | 10.1108/IJMPB-03-2013-0015 |