Loading…

A seismically triggered landslide dam in Honshiyan, Yunnan, China: from emergency management to hydropower potential

At 16:30 (Beijing time) on August 3rd, 2014, an Ms 6.5 earthquake occurred in Ludian County in Yunnan Province, China. The Ludian earthquake triggered a collapse in Chapingzi, right bank of the Niulanjiang River, and a landslide in Hongshiyan at the left bank on the same location. These events occur...

Full description

Saved in:
Bibliographic Details
Published in:Landslides 2015-12, Vol.12 (6), p.1147-1157
Main Authors: Zhang, Shaojie, Xie, Xiangping, Wei, Fangqiang, Chernomorets, Sergey, Petrakov, Dmitry, Pavlova, Irina, Tellez, Ricardo Delgado
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by cdi_FETCH-LOGICAL-a409t-79ad5de2a5272177a59933932d7770602b23c3513922eba4f93d1fc177977b243
cites cdi_FETCH-LOGICAL-a409t-79ad5de2a5272177a59933932d7770602b23c3513922eba4f93d1fc177977b243
container_end_page 1157
container_issue 6
container_start_page 1147
container_title Landslides
container_volume 12
creator Zhang, Shaojie
Xie, Xiangping
Wei, Fangqiang
Chernomorets, Sergey
Petrakov, Dmitry
Pavlova, Irina
Tellez, Ricardo Delgado
description At 16:30 (Beijing time) on August 3rd, 2014, an Ms 6.5 earthquake occurred in Ludian County in Yunnan Province, China. The Ludian earthquake triggered a collapse in Chapingzi, right bank of the Niulanjiang River, and a landslide in Hongshiyan at the left bank on the same location. These events occurred 1.5 km downstream of the Hongshiyan hydropower station. Debris deposits from the collapse and the landslide blocked the river channel and formed a landslide dam. In this study, the Hongshiyan landslide dam induced by the Ludian earthquake was chosen as the study case to discuss integrated landslide dam management and its potential hydropower uses. After emergency management measures are carried out, further analysis shows the outflow through the Hongshiyan landslide dam is manageable, which indicate safety issues are controllable. Two management schemes are discussed in this paper: one that uses the Hongshiyan landslide dam for power generation and one that removes the debris deposit. The result shows that using the strengthened landslide dam for power generation is feasible and economically sound. This research estimate a capital recovery period of approximately 3 to 4 years with an investment-return ration of 1:40, which is considered a significant economic benefit.
doi_str_mv 10.1007/s10346-015-0639-5
format article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_1749605958</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>3897223651</sourcerecordid><originalsourceid>FETCH-LOGICAL-a409t-79ad5de2a5272177a59933932d7770602b23c3513922eba4f93d1fc177977b243</originalsourceid><addsrcrecordid>eNp1kM1KxDAUhYMoOI4-gLuAW6v5aZqJu2FQRxDcKOgqZJq0k6FNapJB-vZmqIgbV-feyznnwgfAJUY3GCF-GzGiZVUgzApUUVGwIzDDFSYFw3hx_Duj91NwFuMOISIQFTOQljAaG3tbq64bYQq2bU0wGnbK6dhZbaBWPbQOrr2LWzsqdw0_9s4ddLW1Tt3BJvgemt6E1rh6hL1yqs2rSzB5uB118IP_MgEOPuWjVd05OGlUF83Fj87B28P962pdPL88Pq2Wz4UqkUgFF0ozbYhihBPMuWJCUCoo0ZxzVCGyIbSmDFNBiNmoshFU46bOTsH5hpR0Dq6m3iH4z72JSe78Prj8UmJeigoxwRbZhSdXHXyMwTRyCLZXYZQYyQNcOcGVGa48wJUsZ8iUidnrMrE_zf-GvgHoq3yf</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1749605958</pqid></control><display><type>article</type><title>A seismically triggered landslide dam in Honshiyan, Yunnan, China: from emergency management to hydropower potential</title><source>Springer Link</source><creator>Zhang, Shaojie ; Xie, Xiangping ; Wei, Fangqiang ; Chernomorets, Sergey ; Petrakov, Dmitry ; Pavlova, Irina ; Tellez, Ricardo Delgado</creator><creatorcontrib>Zhang, Shaojie ; Xie, Xiangping ; Wei, Fangqiang ; Chernomorets, Sergey ; Petrakov, Dmitry ; Pavlova, Irina ; Tellez, Ricardo Delgado</creatorcontrib><description>At 16:30 (Beijing time) on August 3rd, 2014, an Ms 6.5 earthquake occurred in Ludian County in Yunnan Province, China. The Ludian earthquake triggered a collapse in Chapingzi, right bank of the Niulanjiang River, and a landslide in Hongshiyan at the left bank on the same location. These events occurred 1.5 km downstream of the Hongshiyan hydropower station. Debris deposits from the collapse and the landslide blocked the river channel and formed a landslide dam. In this study, the Hongshiyan landslide dam induced by the Ludian earthquake was chosen as the study case to discuss integrated landslide dam management and its potential hydropower uses. After emergency management measures are carried out, further analysis shows the outflow through the Hongshiyan landslide dam is manageable, which indicate safety issues are controllable. Two management schemes are discussed in this paper: one that uses the Hongshiyan landslide dam for power generation and one that removes the debris deposit. The result shows that using the strengthened landslide dam for power generation is feasible and economically sound. This research estimate a capital recovery period of approximately 3 to 4 years with an investment-return ration of 1:40, which is considered a significant economic benefit.</description><identifier>ISSN: 1612-510X</identifier><identifier>EISSN: 1612-5118</identifier><identifier>DOI: 10.1007/s10346-015-0639-5</identifier><language>eng</language><publisher>Berlin/Heidelberg: Springer Berlin Heidelberg</publisher><subject>Agriculture ; Civil Engineering ; Dams ; Earth and Environmental Science ; Earth Sciences ; Earthquakes ; Emergency preparedness ; Geography ; Hydroelectric plants ; Hydroelectric power ; Landslides ; Landslides &amp; mudslides ; Natural Hazards ; Recent Landslides ; Rivers ; Seismic activity ; Seismology</subject><ispartof>Landslides, 2015-12, Vol.12 (6), p.1147-1157</ispartof><rights>Springer-Verlag Berlin Heidelberg 2015</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-a409t-79ad5de2a5272177a59933932d7770602b23c3513922eba4f93d1fc177977b243</citedby><cites>FETCH-LOGICAL-a409t-79ad5de2a5272177a59933932d7770602b23c3513922eba4f93d1fc177977b243</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>Zhang, Shaojie</creatorcontrib><creatorcontrib>Xie, Xiangping</creatorcontrib><creatorcontrib>Wei, Fangqiang</creatorcontrib><creatorcontrib>Chernomorets, Sergey</creatorcontrib><creatorcontrib>Petrakov, Dmitry</creatorcontrib><creatorcontrib>Pavlova, Irina</creatorcontrib><creatorcontrib>Tellez, Ricardo Delgado</creatorcontrib><title>A seismically triggered landslide dam in Honshiyan, Yunnan, China: from emergency management to hydropower potential</title><title>Landslides</title><addtitle>Landslides</addtitle><description>At 16:30 (Beijing time) on August 3rd, 2014, an Ms 6.5 earthquake occurred in Ludian County in Yunnan Province, China. The Ludian earthquake triggered a collapse in Chapingzi, right bank of the Niulanjiang River, and a landslide in Hongshiyan at the left bank on the same location. These events occurred 1.5 km downstream of the Hongshiyan hydropower station. Debris deposits from the collapse and the landslide blocked the river channel and formed a landslide dam. In this study, the Hongshiyan landslide dam induced by the Ludian earthquake was chosen as the study case to discuss integrated landslide dam management and its potential hydropower uses. After emergency management measures are carried out, further analysis shows the outflow through the Hongshiyan landslide dam is manageable, which indicate safety issues are controllable. Two management schemes are discussed in this paper: one that uses the Hongshiyan landslide dam for power generation and one that removes the debris deposit. The result shows that using the strengthened landslide dam for power generation is feasible and economically sound. This research estimate a capital recovery period of approximately 3 to 4 years with an investment-return ration of 1:40, which is considered a significant economic benefit.</description><subject>Agriculture</subject><subject>Civil Engineering</subject><subject>Dams</subject><subject>Earth and Environmental Science</subject><subject>Earth Sciences</subject><subject>Earthquakes</subject><subject>Emergency preparedness</subject><subject>Geography</subject><subject>Hydroelectric plants</subject><subject>Hydroelectric power</subject><subject>Landslides</subject><subject>Landslides &amp; mudslides</subject><subject>Natural Hazards</subject><subject>Recent Landslides</subject><subject>Rivers</subject><subject>Seismic activity</subject><subject>Seismology</subject><issn>1612-510X</issn><issn>1612-5118</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2015</creationdate><recordtype>article</recordtype><recordid>eNp1kM1KxDAUhYMoOI4-gLuAW6v5aZqJu2FQRxDcKOgqZJq0k6FNapJB-vZmqIgbV-feyznnwgfAJUY3GCF-GzGiZVUgzApUUVGwIzDDFSYFw3hx_Duj91NwFuMOISIQFTOQljAaG3tbq64bYQq2bU0wGnbK6dhZbaBWPbQOrr2LWzsqdw0_9s4ddLW1Tt3BJvgemt6E1rh6hL1yqs2rSzB5uB118IP_MgEOPuWjVd05OGlUF83Fj87B28P962pdPL88Pq2Wz4UqkUgFF0ozbYhihBPMuWJCUCoo0ZxzVCGyIbSmDFNBiNmoshFU46bOTsH5hpR0Dq6m3iH4z72JSe78Prj8UmJeigoxwRbZhSdXHXyMwTRyCLZXYZQYyQNcOcGVGa48wJUsZ8iUidnrMrE_zf-GvgHoq3yf</recordid><startdate>20151201</startdate><enddate>20151201</enddate><creator>Zhang, Shaojie</creator><creator>Xie, Xiangping</creator><creator>Wei, Fangqiang</creator><creator>Chernomorets, Sergey</creator><creator>Petrakov, Dmitry</creator><creator>Pavlova, Irina</creator><creator>Tellez, Ricardo Delgado</creator><general>Springer Berlin Heidelberg</general><general>Springer Nature B.V</general><scope>AAYXX</scope><scope>CITATION</scope><scope>3V.</scope><scope>7TG</scope><scope>7UA</scope><scope>7XB</scope><scope>88I</scope><scope>8FD</scope><scope>8FE</scope><scope>8FG</scope><scope>8FK</scope><scope>ABJCF</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>ATCPS</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BGLVJ</scope><scope>BHPHI</scope><scope>BKSAR</scope><scope>C1K</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>F1W</scope><scope>FR3</scope><scope>GNUQQ</scope><scope>H96</scope><scope>HCIFZ</scope><scope>KL.</scope><scope>KR7</scope><scope>L.G</scope><scope>L6V</scope><scope>M2P</scope><scope>M7S</scope><scope>PATMY</scope><scope>PCBAR</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PTHSS</scope><scope>PYCSY</scope><scope>Q9U</scope></search><sort><creationdate>20151201</creationdate><title>A seismically triggered landslide dam in Honshiyan, Yunnan, China: from emergency management to hydropower potential</title><author>Zhang, Shaojie ; Xie, Xiangping ; Wei, Fangqiang ; Chernomorets, Sergey ; Petrakov, Dmitry ; Pavlova, Irina ; Tellez, Ricardo Delgado</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-a409t-79ad5de2a5272177a59933932d7770602b23c3513922eba4f93d1fc177977b243</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2015</creationdate><topic>Agriculture</topic><topic>Civil Engineering</topic><topic>Dams</topic><topic>Earth and Environmental Science</topic><topic>Earth Sciences</topic><topic>Earthquakes</topic><topic>Emergency preparedness</topic><topic>Geography</topic><topic>Hydroelectric plants</topic><topic>Hydroelectric power</topic><topic>Landslides</topic><topic>Landslides &amp; mudslides</topic><topic>Natural Hazards</topic><topic>Recent Landslides</topic><topic>Rivers</topic><topic>Seismic activity</topic><topic>Seismology</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Zhang, Shaojie</creatorcontrib><creatorcontrib>Xie, Xiangping</creatorcontrib><creatorcontrib>Wei, Fangqiang</creatorcontrib><creatorcontrib>Chernomorets, Sergey</creatorcontrib><creatorcontrib>Petrakov, Dmitry</creatorcontrib><creatorcontrib>Pavlova, Irina</creatorcontrib><creatorcontrib>Tellez, Ricardo Delgado</creatorcontrib><collection>CrossRef</collection><collection>ProQuest Central (Corporate)</collection><collection>Meteorological &amp; Geoastrophysical Abstracts</collection><collection>Water Resources Abstracts</collection><collection>ProQuest Central (purchase pre-March 2016)</collection><collection>Science Database (Alumni Edition)</collection><collection>Technology Research Database</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>ProQuest Central (Alumni) (purchase pre-March 2016)</collection><collection>Materials Science &amp; Engineering Collection</collection><collection>ProQuest Central (Alumni)</collection><collection>ProQuest Central</collection><collection>Agricultural &amp; Environmental Science Collection</collection><collection>ProQuest Central Essentials</collection><collection>AUTh Library subscriptions: ProQuest Central</collection><collection>Technology Collection</collection><collection>ProQuest Natural Science Collection</collection><collection>Earth, Atmospheric &amp; Aquatic Science Collection</collection><collection>Environmental Sciences and Pollution Management</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central</collection><collection>ASFA: Aquatic Sciences and Fisheries Abstracts</collection><collection>Engineering Research Database</collection><collection>ProQuest Central Student</collection><collection>Aquatic Science &amp; Fisheries Abstracts (ASFA) 2: Ocean Technology, Policy &amp; Non-Living Resources</collection><collection>SciTech Premium Collection (Proquest) (PQ_SDU_P3)</collection><collection>Meteorological &amp; Geoastrophysical Abstracts - Academic</collection><collection>Civil Engineering Abstracts</collection><collection>Aquatic Science &amp; Fisheries Abstracts (ASFA) Professional</collection><collection>ProQuest Engineering Collection</collection><collection>ProQuest Science Journals</collection><collection>Engineering Database</collection><collection>Environmental Science Database</collection><collection>Earth, Atmospheric &amp; Aquatic Science Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>Engineering Collection</collection><collection>Environmental Science Collection</collection><collection>ProQuest Central Basic</collection><jtitle>Landslides</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Zhang, Shaojie</au><au>Xie, Xiangping</au><au>Wei, Fangqiang</au><au>Chernomorets, Sergey</au><au>Petrakov, Dmitry</au><au>Pavlova, Irina</au><au>Tellez, Ricardo Delgado</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A seismically triggered landslide dam in Honshiyan, Yunnan, China: from emergency management to hydropower potential</atitle><jtitle>Landslides</jtitle><stitle>Landslides</stitle><date>2015-12-01</date><risdate>2015</risdate><volume>12</volume><issue>6</issue><spage>1147</spage><epage>1157</epage><pages>1147-1157</pages><issn>1612-510X</issn><eissn>1612-5118</eissn><abstract>At 16:30 (Beijing time) on August 3rd, 2014, an Ms 6.5 earthquake occurred in Ludian County in Yunnan Province, China. The Ludian earthquake triggered a collapse in Chapingzi, right bank of the Niulanjiang River, and a landslide in Hongshiyan at the left bank on the same location. These events occurred 1.5 km downstream of the Hongshiyan hydropower station. Debris deposits from the collapse and the landslide blocked the river channel and formed a landslide dam. In this study, the Hongshiyan landslide dam induced by the Ludian earthquake was chosen as the study case to discuss integrated landslide dam management and its potential hydropower uses. After emergency management measures are carried out, further analysis shows the outflow through the Hongshiyan landslide dam is manageable, which indicate safety issues are controllable. Two management schemes are discussed in this paper: one that uses the Hongshiyan landslide dam for power generation and one that removes the debris deposit. The result shows that using the strengthened landslide dam for power generation is feasible and economically sound. This research estimate a capital recovery period of approximately 3 to 4 years with an investment-return ration of 1:40, which is considered a significant economic benefit.</abstract><cop>Berlin/Heidelberg</cop><pub>Springer Berlin Heidelberg</pub><doi>10.1007/s10346-015-0639-5</doi><tpages>11</tpages></addata></record>
fulltext fulltext
identifier ISSN: 1612-510X
ispartof Landslides, 2015-12, Vol.12 (6), p.1147-1157
issn 1612-510X
1612-5118
language eng
recordid cdi_proquest_journals_1749605958
source Springer Link
subjects Agriculture
Civil Engineering
Dams
Earth and Environmental Science
Earth Sciences
Earthquakes
Emergency preparedness
Geography
Hydroelectric plants
Hydroelectric power
Landslides
Landslides & mudslides
Natural Hazards
Recent Landslides
Rivers
Seismic activity
Seismology
title A seismically triggered landslide dam in Honshiyan, Yunnan, China: from emergency management to hydropower potential
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-05T09%3A54%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20seismically%20triggered%20landslide%20dam%20in%20Honshiyan,%20Yunnan,%20China:%20from%20emergency%20management%20to%20hydropower%20potential&rft.jtitle=Landslides&rft.au=Zhang,%20Shaojie&rft.date=2015-12-01&rft.volume=12&rft.issue=6&rft.spage=1147&rft.epage=1157&rft.pages=1147-1157&rft.issn=1612-510X&rft.eissn=1612-5118&rft_id=info:doi/10.1007/s10346-015-0639-5&rft_dat=%3Cproquest_cross%3E3897223651%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-a409t-79ad5de2a5272177a59933932d7770602b23c3513922eba4f93d1fc177977b243%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=1749605958&rft_id=info:pmid/&rfr_iscdi=true