Inter-phase feedbacks in construction projects

Understanding diverse performance trajectories of projects is of interest to operations researchers and practitioners. Interactions between multiple phases of a project are commonly assumed to be important in project dynamics, yet the strength of these feedback mechanisms has not been rigorously eva...

Full description

Saved in:
Bibliographic Details
Published in:Journal of operations management 2015-11, Vol.39-40 (1), p.48-62
Main Authors: Parvan, Kiavash, Rahmandad, Hazhir, Haghani, Ali
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Understanding diverse performance trajectories of projects is of interest to operations researchers and practitioners. Interactions between multiple phases of a project are commonly assumed to be important in project dynamics, yet the strength of these feedback mechanisms has not been rigorously evaluated. In this study we use data from 15 construction projects to estimate the feedbacks between design and construction phases. The estimated factors reveal that undiscovered design rework diminishes construction quality and production rate significantly and construction completion speeds up the detection of undiscovered design rework. Together, these feedbacks can explain as much as 20% of variability in overall project costs. Comparison of model predictions with a separate set of 15 projects shows good predictive power for cost and schedule outcomes and their uncertainty. The estimation and prediction framework offers a template for using data from multiple cases to estimate both case-specific and industry-wide parameters of project models, and for leveraging those estimates for project planning.
ISSN:0272-6963
1873-1317
DOI:10.1016/j.jom.2015.07.005