Loading…
Modeling of the Initial Parameters in the Adjustment of an Oil Recovery Process Control System. Part 2. Determination of Limits on the Vectors of the State Variables and Disturbances
Constraints on the degree of specification and the statement of models of limits on the vectors of state variables of an oil recovery and intrastratal disturbance process control system are given. The structures of the models are found through a solution of the dual problems of the classical theorie...
Saved in:
Published in: | Chemical and petroleum engineering 2016-11, Vol.52 (7-8), p.452-459 |
---|---|
Main Author: | |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Constraints on the degree of specification and the statement of models of limits on the vectors of state variables of an oil recovery and intrastratal disturbance process control system are given. The structures of the models are found through a solution of the dual problems of the classical theories of filtration and underground hydrodynamics. The limits on the constraints placed on the vectors of the input and output variables of the control systems are the result of an improvement in the dynamic models of the determination of drill hole dip and direction of existing wells. |
---|---|
ISSN: | 0009-2355 1573-8329 |
DOI: | 10.1007/s10556-016-0213-6 |