Loading…
Crane scheduling in railway yards: an analysis of computational complexity
An efficient container transfer in railway yards is an important matter to increase the attraction of rail-bound freight transport. Therefore, the scheduling of gantry cranes transferring containers between freight trains and trucks or among trains received a lot of attention in the recent years. Th...
Saved in:
Published in: | Journal of scheduling 2017-10, Vol.20 (5), p.507-526 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | An efficient container transfer in railway yards is an important matter to increase the attraction of rail-bound freight transport. Therefore, the scheduling of gantry cranes transferring containers between freight trains and trucks or among trains received a lot of attention in the recent years. This paper contributes to this stream of research by investigating the computational complexity of crane scheduling in these yards. Scheduling the transfer of a given set of containers by a single crane equals the (asymmetric) traveling salesman problem in its path-version. In railway yards, however, all container positions are located along parallel lines, i.e., tracks, and we face special distance metrics, so that only specially structured problem instances arise. We classify important problem settings by differentiating the transshipment direction, parking policy, and distance metric. This way, we derive problem variants being solvable to optimality in polynomial time, whereas other cases are shown to be NP-hard. |
---|---|
ISSN: | 1094-6136 1099-1425 |
DOI: | 10.1007/s10951-017-0520-6 |