Loading…
Effect of block length and yard crane deployment systems on overall performance at a seaport container transshipment terminal
As more and more container terminals open up all over the world, terminal operators are discovering that they must increase quay crane work rates in order to remain competitive. In this paper we present a simulation study that shows how a terminal's long-run average quay crane rate depends on (...
Saved in:
Published in: | Computers & operations research 2009-05, Vol.36 (5), p.1711-1725 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c428t-35a85cb78e1afade6e1146701aa4f74fb8926f7f315092f8880ec49085966913 |
---|---|
cites | cdi_FETCH-LOGICAL-c428t-35a85cb78e1afade6e1146701aa4f74fb8926f7f315092f8880ec49085966913 |
container_end_page | 1725 |
container_issue | 5 |
container_start_page | 1711 |
container_title | Computers & operations research |
container_volume | 36 |
creator | Petering, Matthew E.H. Murty, Katta G. |
description | As more and more container terminals open up all over the world, terminal operators are discovering that they must increase quay crane work rates in order to remain competitive. In this paper we present a simulation study that shows how a terminal's long-run average quay crane rate depends on (1) the length of the storage blocks in the terminal's container yard and (2) the system that deploys yard cranes among blocks in the same zone. Several different block lengths and yard crane deployment systems are evaluated by a fully dynamic, discrete event simulation model that considers the detailed movement of individual containers passing through a vessel-to-vessel transshipment terminal over a several week period. Experiments consider four container terminal scenarios that are designed to reproduce the multi-objective, stochastic, real-time environment at a multiple-berth facility. Results indicate that a block length between 56 and 72 (20-ft) slots yields the highest quay crane work rate, and that a yard crane deployment system that restricts crane movement yields a higher quay crane work rate than a system that allows greater yard crane mobility. Interestingly, a block length of 56–72 slots is somewhat longer than the average block in use today. The experiments provide the first direct connection in the literature between block length and long-run performance at a seaport container terminal. The simulator can be suitably customized to real, pure-transshipment ports and adequately tuned to get an appreciable prescriptive power. |
doi_str_mv | 10.1016/j.cor.2008.04.007 |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_195836135</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0305054808000798</els_id><sourcerecordid>1602777911</sourcerecordid><originalsourceid>FETCH-LOGICAL-c428t-35a85cb78e1afade6e1146701aa4f74fb8926f7f315092f8880ec49085966913</originalsourceid><addsrcrecordid>eNp9kE1v1DAQhi1EJZbSH8DNQuKYME7sxBEnVLWAVIlLD9ysWWfceknsYLuV9sB_r8tWHJnLXN4PvQ9j7wW0AsTw6dDamNoOQLcgW4DxFdsJPfbNOKifr9kOelANKKnfsLc5H6De2Ikd-3PlHNnCo-P7JdpffKFwV-45hpkfMc3cJgzEZ9qWeFwpFJ6PudCaeQw8PlLCZeEbJRfTisESx8KRZ8ItpsJtDAV9oMRLjcn53m9_Mwql1Qdc3rEzh0umi5d_zm6vr24vvzU3P75-v_xy01jZ6dL0CrWy-1GTQIczDSSEHEYQiNKN0u311A1udL1QMHVOaw1k5QRaTcMwif6cfTjFbin-fqBczCE-pNqfjZiU7gfRqyoSJ5FNMedEzmzJr5iORoB5ZmwOpjI2z4wNSFMBVs_Hl2DMFhdXR1qf_xk70fVCwlR1n086qiMfPSWTraeKa_ap0jdz9P9peQKmCZM9</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>195836135</pqid></control><display><type>article</type><title>Effect of block length and yard crane deployment systems on overall performance at a seaport container transshipment terminal</title><source>ScienceDirect Journals</source><creator>Petering, Matthew E.H. ; Murty, Katta G.</creator><creatorcontrib>Petering, Matthew E.H. ; Murty, Katta G.</creatorcontrib><description>As more and more container terminals open up all over the world, terminal operators are discovering that they must increase quay crane work rates in order to remain competitive. In this paper we present a simulation study that shows how a terminal's long-run average quay crane rate depends on (1) the length of the storage blocks in the terminal's container yard and (2) the system that deploys yard cranes among blocks in the same zone. Several different block lengths and yard crane deployment systems are evaluated by a fully dynamic, discrete event simulation model that considers the detailed movement of individual containers passing through a vessel-to-vessel transshipment terminal over a several week period. Experiments consider four container terminal scenarios that are designed to reproduce the multi-objective, stochastic, real-time environment at a multiple-berth facility. Results indicate that a block length between 56 and 72 (20-ft) slots yields the highest quay crane work rate, and that a yard crane deployment system that restricts crane movement yields a higher quay crane work rate than a system that allows greater yard crane mobility. Interestingly, a block length of 56–72 slots is somewhat longer than the average block in use today. The experiments provide the first direct connection in the literature between block length and long-run performance at a seaport container terminal. The simulator can be suitably customized to real, pure-transshipment ports and adequately tuned to get an appreciable prescriptive power.</description><identifier>ISSN: 0305-0548</identifier><identifier>EISSN: 1873-765X</identifier><identifier>EISSN: 0305-0548</identifier><identifier>DOI: 10.1016/j.cor.2008.04.007</identifier><identifier>CODEN: CMORAP</identifier><language>eng</language><publisher>Kidlington: Elsevier Ltd</publisher><subject>Applied sciences ; Block length ; Container ships ; Container terminal ; Cranes & hoists ; Exact sciences and technology ; Gross crane rate ; Ground, air and sea transportation, marine construction ; Maritime shipping ; Operational research. Management science ; Simulation ; Studies ; Terminal design ; Transportation planning, management and economics ; Transportation terminals ; Yard crane deployment</subject><ispartof>Computers & operations research, 2009-05, Vol.36 (5), p.1711-1725</ispartof><rights>2008 Elsevier Ltd</rights><rights>2009 INIST-CNRS</rights><rights>Copyright Pergamon Press Inc. May 2009</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c428t-35a85cb78e1afade6e1146701aa4f74fb8926f7f315092f8880ec49085966913</citedby><cites>FETCH-LOGICAL-c428t-35a85cb78e1afade6e1146701aa4f74fb8926f7f315092f8880ec49085966913</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27923,27924</link.rule.ids><backlink>$$Uhttp://pascal-francis.inist.fr/vibad/index.php?action=getRecordDetail&idt=21231409$$DView record in Pascal Francis$$Hfree_for_read</backlink></links><search><creatorcontrib>Petering, Matthew E.H.</creatorcontrib><creatorcontrib>Murty, Katta G.</creatorcontrib><title>Effect of block length and yard crane deployment systems on overall performance at a seaport container transshipment terminal</title><title>Computers & operations research</title><description>As more and more container terminals open up all over the world, terminal operators are discovering that they must increase quay crane work rates in order to remain competitive. In this paper we present a simulation study that shows how a terminal's long-run average quay crane rate depends on (1) the length of the storage blocks in the terminal's container yard and (2) the system that deploys yard cranes among blocks in the same zone. Several different block lengths and yard crane deployment systems are evaluated by a fully dynamic, discrete event simulation model that considers the detailed movement of individual containers passing through a vessel-to-vessel transshipment terminal over a several week period. Experiments consider four container terminal scenarios that are designed to reproduce the multi-objective, stochastic, real-time environment at a multiple-berth facility. Results indicate that a block length between 56 and 72 (20-ft) slots yields the highest quay crane work rate, and that a yard crane deployment system that restricts crane movement yields a higher quay crane work rate than a system that allows greater yard crane mobility. Interestingly, a block length of 56–72 slots is somewhat longer than the average block in use today. The experiments provide the first direct connection in the literature between block length and long-run performance at a seaport container terminal. The simulator can be suitably customized to real, pure-transshipment ports and adequately tuned to get an appreciable prescriptive power.</description><subject>Applied sciences</subject><subject>Block length</subject><subject>Container ships</subject><subject>Container terminal</subject><subject>Cranes & hoists</subject><subject>Exact sciences and technology</subject><subject>Gross crane rate</subject><subject>Ground, air and sea transportation, marine construction</subject><subject>Maritime shipping</subject><subject>Operational research. Management science</subject><subject>Simulation</subject><subject>Studies</subject><subject>Terminal design</subject><subject>Transportation planning, management and economics</subject><subject>Transportation terminals</subject><subject>Yard crane deployment</subject><issn>0305-0548</issn><issn>1873-765X</issn><issn>0305-0548</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2009</creationdate><recordtype>article</recordtype><recordid>eNp9kE1v1DAQhi1EJZbSH8DNQuKYME7sxBEnVLWAVIlLD9ysWWfceknsYLuV9sB_r8tWHJnLXN4PvQ9j7wW0AsTw6dDamNoOQLcgW4DxFdsJPfbNOKifr9kOelANKKnfsLc5H6De2Ikd-3PlHNnCo-P7JdpffKFwV-45hpkfMc3cJgzEZ9qWeFwpFJ6PudCaeQw8PlLCZeEbJRfTisESx8KRZ8ItpsJtDAV9oMRLjcn53m9_Mwql1Qdc3rEzh0umi5d_zm6vr24vvzU3P75-v_xy01jZ6dL0CrWy-1GTQIczDSSEHEYQiNKN0u311A1udL1QMHVOaw1k5QRaTcMwif6cfTjFbin-fqBczCE-pNqfjZiU7gfRqyoSJ5FNMedEzmzJr5iORoB5ZmwOpjI2z4wNSFMBVs_Hl2DMFhdXR1qf_xk70fVCwlR1n086qiMfPSWTraeKa_ap0jdz9P9peQKmCZM9</recordid><startdate>20090501</startdate><enddate>20090501</enddate><creator>Petering, Matthew E.H.</creator><creator>Murty, Katta G.</creator><general>Elsevier Ltd</general><general>Elsevier</general><general>Pergamon Press Inc</general><scope>IQODW</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7SC</scope><scope>8FD</scope><scope>JQ2</scope><scope>L7M</scope><scope>L~C</scope><scope>L~D</scope></search><sort><creationdate>20090501</creationdate><title>Effect of block length and yard crane deployment systems on overall performance at a seaport container transshipment terminal</title><author>Petering, Matthew E.H. ; Murty, Katta G.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c428t-35a85cb78e1afade6e1146701aa4f74fb8926f7f315092f8880ec49085966913</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2009</creationdate><topic>Applied sciences</topic><topic>Block length</topic><topic>Container ships</topic><topic>Container terminal</topic><topic>Cranes & hoists</topic><topic>Exact sciences and technology</topic><topic>Gross crane rate</topic><topic>Ground, air and sea transportation, marine construction</topic><topic>Maritime shipping</topic><topic>Operational research. Management science</topic><topic>Simulation</topic><topic>Studies</topic><topic>Terminal design</topic><topic>Transportation planning, management and economics</topic><topic>Transportation terminals</topic><topic>Yard crane deployment</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Petering, Matthew E.H.</creatorcontrib><creatorcontrib>Murty, Katta G.</creatorcontrib><collection>Pascal-Francis</collection><collection>CrossRef</collection><collection>Computer and Information Systems Abstracts</collection><collection>Technology Research Database</collection><collection>ProQuest Computer Science Collection</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Computer and Information Systems Abstracts Academic</collection><collection>Computer and Information Systems Abstracts Professional</collection><jtitle>Computers & operations research</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Petering, Matthew E.H.</au><au>Murty, Katta G.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Effect of block length and yard crane deployment systems on overall performance at a seaport container transshipment terminal</atitle><jtitle>Computers & operations research</jtitle><date>2009-05-01</date><risdate>2009</risdate><volume>36</volume><issue>5</issue><spage>1711</spage><epage>1725</epage><pages>1711-1725</pages><issn>0305-0548</issn><eissn>1873-765X</eissn><eissn>0305-0548</eissn><coden>CMORAP</coden><abstract>As more and more container terminals open up all over the world, terminal operators are discovering that they must increase quay crane work rates in order to remain competitive. In this paper we present a simulation study that shows how a terminal's long-run average quay crane rate depends on (1) the length of the storage blocks in the terminal's container yard and (2) the system that deploys yard cranes among blocks in the same zone. Several different block lengths and yard crane deployment systems are evaluated by a fully dynamic, discrete event simulation model that considers the detailed movement of individual containers passing through a vessel-to-vessel transshipment terminal over a several week period. Experiments consider four container terminal scenarios that are designed to reproduce the multi-objective, stochastic, real-time environment at a multiple-berth facility. Results indicate that a block length between 56 and 72 (20-ft) slots yields the highest quay crane work rate, and that a yard crane deployment system that restricts crane movement yields a higher quay crane work rate than a system that allows greater yard crane mobility. Interestingly, a block length of 56–72 slots is somewhat longer than the average block in use today. The experiments provide the first direct connection in the literature between block length and long-run performance at a seaport container terminal. The simulator can be suitably customized to real, pure-transshipment ports and adequately tuned to get an appreciable prescriptive power.</abstract><cop>Kidlington</cop><pub>Elsevier Ltd</pub><doi>10.1016/j.cor.2008.04.007</doi><tpages>15</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0305-0548 |
ispartof | Computers & operations research, 2009-05, Vol.36 (5), p.1711-1725 |
issn | 0305-0548 1873-765X 0305-0548 |
language | eng |
recordid | cdi_proquest_journals_195836135 |
source | ScienceDirect Journals |
subjects | Applied sciences Block length Container ships Container terminal Cranes & hoists Exact sciences and technology Gross crane rate Ground, air and sea transportation, marine construction Maritime shipping Operational research. Management science Simulation Studies Terminal design Transportation planning, management and economics Transportation terminals Yard crane deployment |
title | Effect of block length and yard crane deployment systems on overall performance at a seaport container transshipment terminal |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-12T23%3A30%3A09IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Effect%20of%20block%20length%20and%20yard%20crane%20deployment%20systems%20on%20overall%20performance%20at%20a%20seaport%20container%20transshipment%20terminal&rft.jtitle=Computers%20&%20operations%20research&rft.au=Petering,%20Matthew%20E.H.&rft.date=2009-05-01&rft.volume=36&rft.issue=5&rft.spage=1711&rft.epage=1725&rft.pages=1711-1725&rft.issn=0305-0548&rft.eissn=1873-765X&rft.coden=CMORAP&rft_id=info:doi/10.1016/j.cor.2008.04.007&rft_dat=%3Cproquest_cross%3E1602777911%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c428t-35a85cb78e1afade6e1146701aa4f74fb8926f7f315092f8880ec49085966913%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=195836135&rft_id=info:pmid/&rfr_iscdi=true |