Loading…
Application of the high-resolution EM method in the investigation of B Tunnel
A successful case history of exploring for concealed structure using the high-resolution EM method in the investigation of the West-East Gas Pipeline Project's B Tunnel is presented in this paper. The high frequency electromagnetic image system named STRATAGEM EH4, operating at frequencies rang...
Saved in:
Published in: | Applied geophysics 2005-09, Vol.2 (3), p.140-144 |
---|---|
Main Authors: | , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | A successful case history of exploring for concealed structure using the high-resolution EM method in the investigation of the West-East Gas Pipeline Project's B Tunnel is presented in this paper. The high frequency electromagnetic image system named STRATAGEM EH4, operating at frequencies ranging from 90 KHz to lHz, was used for data acquisition. The orthogonal components of the electromagnetic field were measured during the field acquisition and the relevant electromagnetic attributes of the object body were extracted from the electromagnetic data. Hybrid sources, consisting of natural and full tensor-controlled sources, were utilized to produce high-quality electromagnetic field data. B Tunnel lies in the western part of Hubei province, at depths of less than 200 m. The geologic setting of B tunnel is very complex. Following an initial geologic investigation, an outcrop considered to be a bedrock interface by investigators, collapsed during tunneling operations. A second investigation applied high-resolution EM and seismic refraction methods to reveal a more complex geologic structure along the tunnel route. The predicted rock classes and fault were encountered during the subsequent tunneling operations.[PUBLICATION ABSTRACT] |
---|---|
ISSN: | 1672-7975 1993-0658 |
DOI: | 10.1007/s11770-005-0016-6 |