Loading…

Product due date assignment for complex assemblies

A method is described to assign product due dates for multistage assemblies with uncertain manufacturing and assembly process times. Earliest start times of operations are specified by a predetermined production plan and processing time distributions for operations are truncated at minimum processin...

Full description

Saved in:
Bibliographic Details
Published in:International journal of production economics 2002-04, Vol.76 (3), p.243-256
Main Authors: Song, D.P., Hicks, C., Earl, C.F.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:A method is described to assign product due dates for multistage assemblies with uncertain manufacturing and assembly process times. Earliest start times of operations are specified by a predetermined production plan and processing time distributions for operations are truncated at minimum processing times. The method systematically decomposes the complex product structures of multistage assemblies into two-stage subsystems. Both exact and approximate distributions of completion time for two-stage assemblies are developed. The latter is applied recursively to multistage assemblies to yield an approximate distribution of product completion time. Product due dates are assigned to either minimise earliness and tardiness costs or to meet a service target. This method is applied to examples which use manufacturing and assembly data from a capital goods company. The results are verified by simulation.
ISSN:0925-5273
1873-7579
DOI:10.1016/S0925-5273(01)00170-0