Loading…
Pulverized-coal injection in a 5000-m3 blast furnace
Numerous problems are encountered in the introduction of pulverized-coal injection at a 5000-m 3 blast furnace. To resolve those problems, changes are proposed in the furnace profile, the number and diameter of the air tuyeres, the batch distribution in the mouth, and the gas flux in the hearth.
Saved in:
Published in: | Steel in translation 2017-10, Vol.47 (10), p.675-681 |
---|---|
Main Authors: | , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Numerous problems are encountered in the introduction of pulverized-coal injection at a 5000-m
3
blast furnace. To resolve those problems, changes are proposed in the furnace profile, the number and diameter of the air tuyeres, the batch distribution in the mouth, and the gas flux in the hearth. |
---|---|
ISSN: | 0967-0912 1935-0988 |
DOI: | 10.3103/S0967091217100060 |