Loading…
Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project
AbstractDesign errors are one of the major risk factors causing rework and delay. Therefore, accurate cost analysis of potential economic losses attributable to design errors is crucial from a practical point of view. This paper proposes a basis for establishing building information modeling (BIM) i...
Saved in:
Published in: | Journal of construction engineering and management 2018-06, Vol.144 (6) |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | AbstractDesign errors are one of the major risk factors causing rework and delay. Therefore, accurate cost analysis of potential economic losses attributable to design errors is crucial from a practical point of view. This paper proposes a basis for establishing building information modeling (BIM) investment strategies by quantifying the various costs associated with design errors for error prevention. The design errors were classified into three basic types: simple design (Type 1); rework-related (Type 2) that may lead to demolition and rework; and delay-related (Type 3) likely to prolong the construction period. To evaluate the effects of BIM application quantitatively, the performance potential of BIM-assisted identification of individual design errors was examined. A comparison of the influences of classified design errors on the project revealed that the total cost of the design errors leading to schedule delay was 194.69% higher than that of the simple design errors and the direct design error costs due to errors leading to demolition and rework. |
---|---|
ISSN: | 0733-9364 1943-7862 |
DOI: | 10.1061/(ASCE)CO.1943-7862.0001498 |