Loading…

Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project

AbstractDesign errors are one of the major risk factors causing rework and delay. Therefore, accurate cost analysis of potential economic losses attributable to design errors is crucial from a practical point of view. This paper proposes a basis for establishing building information modeling (BIM) i...

Full description

Saved in:
Bibliographic Details
Published in:Journal of construction engineering and management 2018-06, Vol.144 (6)
Main Authors: Ham, Namhyuk, Moon, Sungkon, Kim, Ju-Hyung, Kim, Jae-Jun
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:AbstractDesign errors are one of the major risk factors causing rework and delay. Therefore, accurate cost analysis of potential economic losses attributable to design errors is crucial from a practical point of view. This paper proposes a basis for establishing building information modeling (BIM) investment strategies by quantifying the various costs associated with design errors for error prevention. The design errors were classified into three basic types: simple design (Type 1); rework-related (Type 2) that may lead to demolition and rework; and delay-related (Type 3) likely to prolong the construction period. To evaluate the effects of BIM application quantitatively, the performance potential of BIM-assisted identification of individual design errors was examined. A comparison of the influences of classified design errors on the project revealed that the total cost of the design errors leading to schedule delay was 194.69% higher than that of the simple design errors and the direct design error costs due to errors leading to demolition and rework.
ISSN:0733-9364
1943-7862
DOI:10.1061/(ASCE)CO.1943-7862.0001498