Optimization analysis for design and planning of multi-project programs
Program management concerns the long term planning, coordination, and control of major technological, engineering, scientific, and/or developmental activities. In general, programs tend to be exceptionally large, consisting of several parallel or sequential projects or groups of projects. While a la...
Saved in:
Published in: | European journal of operational research 1998-06, Vol.107 (2), p.492-506 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Program management concerns the long term planning, coordination, and control of major technological, engineering, scientific, and/or developmental activities. In general, programs tend to be exceptionally large, consisting of several parallel or sequential projects or groups of projects. While a large number of modeling efforts have focused at the project level, this paper looks at the application of optimization techniques to the initial design and development of multi-project programs. The classic work breakdown structure (WBS) is used as a framework to provide an aggregate model to investigate the effects of funding levels, resource allocation, and program, project, and component durations. Decomposition, sensitivity analysis, and parametric programming are utilized to provide the decision maker detailed information for establishing program parameters, conditions, and bounds. |
---|---|
ISSN: | 0377-2217 1872-6860 |
DOI: | 10.1016/S0377-2217(97)00334-2 |