Loading…

Preassembly of the tokamak T-15MD magnet system

[Display omitted] •T-15MD project is the initial technical base for creating fusion neutron sources.•Magnet system of T-15MD will confine the hot plasma in the divertor configuration.•Toroidal magnetic field at the plasma axis is 2T.•Preassembly of magnet system was completed.•T-15MD should begin op...

Full description

Saved in:
Bibliographic Details
Published in:Fusion engineering and design 2017-11, Vol.124, p.114-118
Main Authors: Khvostenko, P.P., Anashkin, I.O., Belyakov, V.A., Bondarchuk, E.N., Injutin, N.V., Romannikov, A.N., Solopeko, A.V.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:[Display omitted] •T-15MD project is the initial technical base for creating fusion neutron sources.•Magnet system of T-15MD will confine the hot plasma in the divertor configuration.•Toroidal magnetic field at the plasma axis is 2T.•Preassembly of magnet system was completed.•T-15MD should begin operations in 2018. Presently, the Tokamak T-15MD is being built in NRC “Kurchatov Institute”, Russia. All elements of the magnet system have been manufactured by the end of 2015. The preassembly of the tokamak T-15MD magnet system is carried out at plant in Bryansk. The purpose of the preassembly of the magnet system is to bring together all of the elements, which will provide the necessary experience for the later assembly of the tokamak at the NRC “Kurchatov Institute” in Moscow. The results of the preassembly of the tokamak T-15MD magnet system are presented.
ISSN:0920-3796
1873-7196
DOI:10.1016/j.fusengdes.2017.03.064