Status of the warm front end of PIP-II injector test
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2I...
Saved in:
Published in: | arXiv.org 2018-03 |
---|---|
Main Authors: | , , , , , , , , , , , , , , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2IT) is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CWRFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed, and commissioned. This report presents the overall status of the warm front end. |
---|---|
ISSN: | 2331-8422 |