Loading…

PIP-II Injector Test Warm Front End: Commissioning Update

The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam T...

Full description

Saved in:
Bibliographic Details
Published in:arXiv.org 2018-06
Main Authors: Prost, L, Andrews, R, Baffes, C, J -P Carneiro, Chase, B, Chen, A, Cullerton, E, Derwent, P F, Edelen, J P, Einstein-Curtis, J, Frolov, D, Hanna, B, Peterson, D, Saewert, G, Saini, A, Scarpine, V, Shemyakin, A, Steimel, J, Sun, D, Warner, A, Richard, C, Sista, V L S
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.
ISSN:2331-8422