The prototyping/early construction phase of the BAIKAL-GVD project
The Prototyping phase of the BAIKAL-GVD project has been started in April 2011 with the deployment of a three string engineering array which comprises all basic elements and systems of the Gigaton Volume Detector (GVD) in Lake Baikal. In April 2012 the version of engineering array which comprises th...
Saved in:
Published in: | arXiv.org 2013-08 |
---|---|
Main Authors: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The Prototyping phase of the BAIKAL-GVD project has been started in April 2011 with the deployment of a three string engineering array which comprises all basic elements and systems of the Gigaton Volume Detector (GVD) in Lake Baikal. In April 2012 the version of engineering array which comprises the first full-scale string of the GVD demonstration cluster has been deployed and operated during 2012. The first stage of the GVD demonstration cluster which consists of three strings is deployed in April 2013. We review the Prototyping phase of the BAIKAL-GVD project and describe the configuration and design of the 2013 engineering array. |
---|---|