Loading…

Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints

Quality control lead times are one of most significant causes of loss of time in the pharmaceutical and cosmetics industries. This is partly due to the organization of laboratories that feature parallel multipurpose machines for chromatographic analyses. The testing process requires long setup times...

Full description

Saved in:
Bibliographic Details
Published in:arXiv.org 2015-09
Main Authors: Lamothe, Jacques, Marmier, François, Dupuy, Matthieu, Gaborit, Paul, Dupont, Lionel
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Quality control lead times are one of most significant causes of loss of time in the pharmaceutical and cosmetics industries. This is partly due to the organization of laboratories that feature parallel multipurpose machines for chromatographic analyses. The testing process requires long setup times and operators are needed to launch the process. The various controls are non-preemptive and are characterized by a release date, a due date and available routings. These quality processes lead to significant delays, and we therefore evaluate the total tardiness criterion. Previous heuristics were defined for the total tardiness criterion, parallel machines, and setup such as ATC (Apparent Tardiness Cost) and ATCS (ATC with setups). We propose new rules and a simulated annealing procedure in order to minimize total tardiness.
ISSN:2331-8422
DOI:10.48550/arxiv.1509.02099