Loading…

Techno-economic analysis of receiver replacement scenarios in a parabolic trough field

The heat loss of an evacuated parabolic trough receiver of solar thermal power plants ranges typically between values below 150 and 200 W/m at 350°C. Defects, such as glass breakage by wind events and coating degradation, anti-reflection coating degradation or hydrogen accumulation in the annulus, d...

Full description

Saved in:
Bibliographic Details
Main Authors: Röger, Marc, Lüpfert, Eckhard, Caron, Simon, Dieckmann, Simon
Format: Conference Proceeding
Language:English
Subjects:
Citations: Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The heat loss of an evacuated parabolic trough receiver of solar thermal power plants ranges typically between values below 150 and 200 W/m at 350°C. Defects, such as glass breakage by wind events and coating degradation, anti-reflection coating degradation or hydrogen accumulation in the annulus, decrease the annual electricity production. This study examines the effect of different receiver performance loss scenarios on the energetic and economic output of a modern 150-MWel–parabolic trough plant with 7.5-hours molten-salt storage, located in Ma’an, Jordan over the whole lifetime by modeling it in an extended version of the software greenius. Compared to the reference scenario, a wind event in year 5 (10, 15) causing glass envelope breakage and consequential degradation of the selective coating of 5.6% of the receivers reduces the electricity output by 5.1% (3.8%, 2.5%), the net present value is reduced by 36.5% (23.1%, 13.1%). The payback time of receiver replacement is only 0.7 years and hence this measure is recommended. The highest negative impact on performance and net present value of a project has the hydrogen accumulation scenario (50% of field affected) in event year 5 (10,15) reducing net electric output by 10.7% (8.1%, 5.4%) and the net present value by 77.0% (48.7%, 27.6%). Replacement of the receivers or even better an inexpensive repair solution is an energetically and economically sensible solution. The option of investing in premium receivers with Xe-capsule during the construction phase is a viable option if the surplus cost for premium receivers is lower than 10 to 20 percent.
ISSN:0094-243X
1551-7616
DOI:10.1063/1.4949082