Loading…
Simulation for measuring the effect of flight retiming to the robustness of flight schedule
In day-to-day operations, flight delays might happen due to some reason such as bad weather conditions, equipment failure, and limited runway capacity. Flight delays do not only increase crew operating cost, they can cause delay propagation on subsequent flights. Since the crew cost is the second la...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | |
container_end_page | 451 |
container_issue | 1 |
container_start_page | |
container_title | |
container_volume | 1589 |
creator | Novianingsih, K Hadianti, R Uttunggadewa, S Soewono, E |
description | In day-to-day operations, flight delays might happen due to some reason such as bad weather conditions, equipment failure, and limited runway capacity. Flight delays do not only increase crew operating cost, they can cause delay propagation on subsequent flights. Since the crew cost is the second largest cost, it is important to construct a robust flight schedule where any flight delay will not lead to a massive disruption to the subsequent downstream flights. In this paper, we analyze the effect of flight retiming to the robustness of flight schedule. We construct a simulation for measuring the robustness of the flight schedule, where the probability of crew pairing found after a number of flight delays happen is used as the measure of robustness. It is shown that the retiming will increase the robustness of the schedule if we only retime the flights which appear in the first cycle of the set of selected pairings. |
doi_str_mv | 10.1063/1.4868840 |
format | conference_proceeding |
fullrecord | <record><control><sourceid>proquest</sourceid><recordid>TN_cdi_proquest_journals_2127689621</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2127689621</sourcerecordid><originalsourceid>FETCH-LOGICAL-p183t-a9642b1aef78d059f8ea12621bf10575516b4566b3be73f3a84598f9b2c97133</originalsourceid><addsrcrecordid>eNpNjz1PwzAURS0EEqEw8A8sMaf42Y4_RlQBRarEQAckhspOn5tUSVxi5_8TFQamO9yjc3UJuQe2BKbEIyylUcZIdkEKqCootQJ1SQrGrCy5FJ_X5CalI2Pcam0K8vXR9lPnchsHGuJIe3RpGtvhQHODFEPAOtMYaOjaQ5PpiLntz208A2P0U8oDpvQPSnWD-6nDW3IVXJfw7i8XZPvyvF2ty83769vqaVOewIhcOqsk9-AwaLNnlQ0GHXDFwQdglZ5PKC8rpbzwqEUQzsjKmmA9r60GIRbk4Vd7GuP3hCnvjnEah3lxx4FrZezsEj8KClNS</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype><pqid>2127689621</pqid></control><display><type>conference_proceeding</type><title>Simulation for measuring the effect of flight retiming to the robustness of flight schedule</title><source>American Institute of Physics:Jisc Collections:Transitional Journals Agreement 2021-23 (Reading list)</source><creator>Novianingsih, K ; Hadianti, R ; Uttunggadewa, S ; Soewono, E</creator><creatorcontrib>Novianingsih, K ; Hadianti, R ; Uttunggadewa, S ; Soewono, E</creatorcontrib><description>In day-to-day operations, flight delays might happen due to some reason such as bad weather conditions, equipment failure, and limited runway capacity. Flight delays do not only increase crew operating cost, they can cause delay propagation on subsequent flights. Since the crew cost is the second largest cost, it is important to construct a robust flight schedule where any flight delay will not lead to a massive disruption to the subsequent downstream flights. In this paper, we analyze the effect of flight retiming to the robustness of flight schedule. We construct a simulation for measuring the robustness of the flight schedule, where the probability of crew pairing found after a number of flight delays happen is used as the measure of robustness. It is shown that the retiming will increase the robustness of the schedule if we only retime the flights which appear in the first cycle of the set of selected pairings.</description><identifier>ISSN: 0094-243X</identifier><identifier>EISSN: 1551-7616</identifier><identifier>DOI: 10.1063/1.4868840</identifier><language>eng</language><publisher>Melville: American Institute of Physics</publisher><subject>Airline industry ; Airline scheduling ; Construction costs ; Delay ; Disruption ; Downstream effects ; Robustness ; Weather</subject><ispartof>AIP Conference Proceedings, 2014, Vol.1589 (1), p.451</ispartof><rights>2014 AIP Publishing LLC.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>309,310,780,784,789,790,23930,23931,25140,27925</link.rule.ids></links><search><creatorcontrib>Novianingsih, K</creatorcontrib><creatorcontrib>Hadianti, R</creatorcontrib><creatorcontrib>Uttunggadewa, S</creatorcontrib><creatorcontrib>Soewono, E</creatorcontrib><title>Simulation for measuring the effect of flight retiming to the robustness of flight schedule</title><title>AIP Conference Proceedings</title><description>In day-to-day operations, flight delays might happen due to some reason such as bad weather conditions, equipment failure, and limited runway capacity. Flight delays do not only increase crew operating cost, they can cause delay propagation on subsequent flights. Since the crew cost is the second largest cost, it is important to construct a robust flight schedule where any flight delay will not lead to a massive disruption to the subsequent downstream flights. In this paper, we analyze the effect of flight retiming to the robustness of flight schedule. We construct a simulation for measuring the robustness of the flight schedule, where the probability of crew pairing found after a number of flight delays happen is used as the measure of robustness. It is shown that the retiming will increase the robustness of the schedule if we only retime the flights which appear in the first cycle of the set of selected pairings.</description><subject>Airline industry</subject><subject>Airline scheduling</subject><subject>Construction costs</subject><subject>Delay</subject><subject>Disruption</subject><subject>Downstream effects</subject><subject>Robustness</subject><subject>Weather</subject><issn>0094-243X</issn><issn>1551-7616</issn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2014</creationdate><recordtype>conference_proceeding</recordtype><recordid>eNpNjz1PwzAURS0EEqEw8A8sMaf42Y4_RlQBRarEQAckhspOn5tUSVxi5_8TFQamO9yjc3UJuQe2BKbEIyylUcZIdkEKqCootQJ1SQrGrCy5FJ_X5CalI2Pcam0K8vXR9lPnchsHGuJIe3RpGtvhQHODFEPAOtMYaOjaQ5PpiLntz208A2P0U8oDpvQPSnWD-6nDW3IVXJfw7i8XZPvyvF2ty83769vqaVOewIhcOqsk9-AwaLNnlQ0GHXDFwQdglZ5PKC8rpbzwqEUQzsjKmmA9r60GIRbk4Vd7GuP3hCnvjnEah3lxx4FrZezsEj8KClNS</recordid><startdate>20140324</startdate><enddate>20140324</enddate><creator>Novianingsih, K</creator><creator>Hadianti, R</creator><creator>Uttunggadewa, S</creator><creator>Soewono, E</creator><general>American Institute of Physics</general><scope>8FD</scope><scope>H8D</scope><scope>L7M</scope></search><sort><creationdate>20140324</creationdate><title>Simulation for measuring the effect of flight retiming to the robustness of flight schedule</title><author>Novianingsih, K ; Hadianti, R ; Uttunggadewa, S ; Soewono, E</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-p183t-a9642b1aef78d059f8ea12621bf10575516b4566b3be73f3a84598f9b2c97133</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2014</creationdate><topic>Airline industry</topic><topic>Airline scheduling</topic><topic>Construction costs</topic><topic>Delay</topic><topic>Disruption</topic><topic>Downstream effects</topic><topic>Robustness</topic><topic>Weather</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Novianingsih, K</creatorcontrib><creatorcontrib>Hadianti, R</creatorcontrib><creatorcontrib>Uttunggadewa, S</creatorcontrib><creatorcontrib>Soewono, E</creatorcontrib><collection>Technology Research Database</collection><collection>Aerospace Database</collection><collection>Advanced Technologies Database with Aerospace</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Novianingsih, K</au><au>Hadianti, R</au><au>Uttunggadewa, S</au><au>Soewono, E</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Simulation for measuring the effect of flight retiming to the robustness of flight schedule</atitle><btitle>AIP Conference Proceedings</btitle><date>2014-03-24</date><risdate>2014</risdate><volume>1589</volume><issue>1</issue><epage>451</epage><issn>0094-243X</issn><eissn>1551-7616</eissn><abstract>In day-to-day operations, flight delays might happen due to some reason such as bad weather conditions, equipment failure, and limited runway capacity. Flight delays do not only increase crew operating cost, they can cause delay propagation on subsequent flights. Since the crew cost is the second largest cost, it is important to construct a robust flight schedule where any flight delay will not lead to a massive disruption to the subsequent downstream flights. In this paper, we analyze the effect of flight retiming to the robustness of flight schedule. We construct a simulation for measuring the robustness of the flight schedule, where the probability of crew pairing found after a number of flight delays happen is used as the measure of robustness. It is shown that the retiming will increase the robustness of the schedule if we only retime the flights which appear in the first cycle of the set of selected pairings.</abstract><cop>Melville</cop><pub>American Institute of Physics</pub><doi>10.1063/1.4868840</doi></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0094-243X |
ispartof | AIP Conference Proceedings, 2014, Vol.1589 (1), p.451 |
issn | 0094-243X 1551-7616 |
language | eng |
recordid | cdi_proquest_journals_2127689621 |
source | American Institute of Physics:Jisc Collections:Transitional Journals Agreement 2021-23 (Reading list) |
subjects | Airline industry Airline scheduling Construction costs Delay Disruption Downstream effects Robustness Weather |
title | Simulation for measuring the effect of flight retiming to the robustness of flight schedule |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-26T16%3A18%3A09IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Simulation%20for%20measuring%20the%20effect%20of%20flight%20retiming%20to%20the%20robustness%20of%20flight%20schedule&rft.btitle=AIP%20Conference%20Proceedings&rft.au=Novianingsih,%20K&rft.date=2014-03-24&rft.volume=1589&rft.issue=1&rft.epage=451&rft.issn=0094-243X&rft.eissn=1551-7616&rft_id=info:doi/10.1063/1.4868840&rft_dat=%3Cproquest%3E2127689621%3C/proquest%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-p183t-a9642b1aef78d059f8ea12621bf10575516b4566b3be73f3a84598f9b2c97133%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2127689621&rft_id=info:pmid/&rfr_iscdi=true |