A new earthworks estimating methodology

Earthworks and earthmoving operations are a major part of many civil engineering construction projects. Because of their labour and plant intensity, the planning and estimating of such operations is crucial to both the cost and duration of the project; earthworks are considered by many practitioners...

Full description

Saved in:
Bibliographic Details
Published in:Construction management and economics 2000-03, Vol.18 (2), p.219-228
Main Authors: Smith, Simon D., Wood, Graeme S., Gould, Martin
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by cdi_FETCH-LOGICAL-c345t-fad9a4c39de5d6c7633ea2237c6416081c3d5d8b1a82e2299ee4a89f38bd324d3
cites cdi_FETCH-LOGICAL-c345t-fad9a4c39de5d6c7633ea2237c6416081c3d5d8b1a82e2299ee4a89f38bd324d3
container_end_page 228
container_issue 2
container_start_page 219
container_title Construction management and economics
container_volume 18
creator Smith, Simon D.
Wood, Graeme S.
Gould, Martin
description Earthworks and earthmoving operations are a major part of many civil engineering construction projects. Because of their labour and plant intensity, the planning and estimating of such operations is crucial to both the cost and duration of the project; earthworks are considered by many practitioners to be indicators to the success or failure of the project as a whole. Traditionally, a mixture of manufacturers' data (through published charts or computer databases) and historical company data are used in the estimating of earthworks. This process has two main drawbacks. First, plant haul velocity is dependent on the rolling resistance at the soil-wheel interface, which is notoriously difficult to determine; second, the stochastic interface between types of plant provides a non-deterministic system, resulting in estimates of output which may be unrealistically high. An alternative system of earthworks estimating is presented based on a combination of work undertaken in both the soil/vehicle and stochastic estimating fields. This system is demonstrated via a case study based on an actual highway project. The main conclusion to be drawn is that the traditional estimating approach results in a scheme costed well below realistic values.
doi_str_mv 10.1080/014461900370843
format article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_213192156</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>48291285</sourcerecordid><originalsourceid>FETCH-LOGICAL-c345t-fad9a4c39de5d6c7633ea2237c6416081c3d5d8b1a82e2299ee4a89f38bd324d3</originalsourceid><addsrcrecordid>eNqFUD1PwzAUtBBIlMLMGrEwhdp-TmqzVRWfqsQCEpvl2k6b0sTBcSn59zgKYkBCDM9n6d2dz4fQOcFXBHM8wYSxnAiMYYo5gwM0IizPUwbweohG_TaNazhGJ227wRgzisUIXc6S2u4Tq3xY751_axPbhrJSoaxXSWXD2hm3davuFB0Vatvas28co5fbm-f5fbp4unuYzxapBpaFtFBGKKZBGJuZXE9zAKsohanOGckxJxpMZviSKE4tpUJYyxQXBfClAcoMjNHF4Nt4976LWeTG7Xwdn5SUABGUZHkkTQaS9q5tvS1k42Nm30mCZV-G_FVGVDwOCm8bq3_oQRXa1dUqyA8JivB4dHForCdC2V_jND0SISnlch2qaJYNZmVdOF-p2NvWRK9u63zhVa3L9ncAGT5D1F3_q4O_fvAFvfCNxQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>213192156</pqid></control><display><type>article</type><title>A new earthworks estimating methodology</title><source>Business Source Ultimate</source><source>Taylor &amp; Francis</source><creator>Smith, Simon D. ; Wood, Graeme S. ; Gould, Martin</creator><creatorcontrib>Smith, Simon D. ; Wood, Graeme S. ; Gould, Martin</creatorcontrib><description>Earthworks and earthmoving operations are a major part of many civil engineering construction projects. Because of their labour and plant intensity, the planning and estimating of such operations is crucial to both the cost and duration of the project; earthworks are considered by many practitioners to be indicators to the success or failure of the project as a whole. Traditionally, a mixture of manufacturers' data (through published charts or computer databases) and historical company data are used in the estimating of earthworks. This process has two main drawbacks. First, plant haul velocity is dependent on the rolling resistance at the soil-wheel interface, which is notoriously difficult to determine; second, the stochastic interface between types of plant provides a non-deterministic system, resulting in estimates of output which may be unrealistically high. An alternative system of earthworks estimating is presented based on a combination of work undertaken in both the soil/vehicle and stochastic estimating fields. This system is demonstrated via a case study based on an actual highway project. The main conclusion to be drawn is that the traditional estimating approach results in a scheme costed well below realistic values.</description><identifier>ISSN: 0144-6193</identifier><identifier>EISSN: 1466-433X</identifier><identifier>DOI: 10.1080/014461900370843</identifier><language>eng</language><publisher>London: Taylor &amp; Francis Group</publisher><subject>Civil engineering ; Earthmoving equipment ; Earthmoving Plant ; Earthworks ; Estimating techniques ; Hauling ; Plant Cycle Times ; Project management ; Rolling Resistance ; Soils ; Studies</subject><ispartof>Construction management and economics, 2000-03, Vol.18 (2), p.219-228</ispartof><rights>Copyright Taylor &amp; Francis Group, LLC 2000</rights><rights>Copyright E. &amp; F.N. Spon Mar 2000</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c345t-fad9a4c39de5d6c7633ea2237c6416081c3d5d8b1a82e2299ee4a89f38bd324d3</citedby><cites>FETCH-LOGICAL-c345t-fad9a4c39de5d6c7633ea2237c6416081c3d5d8b1a82e2299ee4a89f38bd324d3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27923,27924</link.rule.ids><backlink>$$Uhttp://econpapers.repec.org/article/tafconmgt/v_3a18_3ay_3a2000_3ai_3a2_3ap_3a219-228.htm$$DView record in RePEc$$Hfree_for_read</backlink></links><search><creatorcontrib>Smith, Simon D.</creatorcontrib><creatorcontrib>Wood, Graeme S.</creatorcontrib><creatorcontrib>Gould, Martin</creatorcontrib><title>A new earthworks estimating methodology</title><title>Construction management and economics</title><description>Earthworks and earthmoving operations are a major part of many civil engineering construction projects. Because of their labour and plant intensity, the planning and estimating of such operations is crucial to both the cost and duration of the project; earthworks are considered by many practitioners to be indicators to the success or failure of the project as a whole. Traditionally, a mixture of manufacturers' data (through published charts or computer databases) and historical company data are used in the estimating of earthworks. This process has two main drawbacks. First, plant haul velocity is dependent on the rolling resistance at the soil-wheel interface, which is notoriously difficult to determine; second, the stochastic interface between types of plant provides a non-deterministic system, resulting in estimates of output which may be unrealistically high. An alternative system of earthworks estimating is presented based on a combination of work undertaken in both the soil/vehicle and stochastic estimating fields. This system is demonstrated via a case study based on an actual highway project. The main conclusion to be drawn is that the traditional estimating approach results in a scheme costed well below realistic values.</description><subject>Civil engineering</subject><subject>Earthmoving equipment</subject><subject>Earthmoving Plant</subject><subject>Earthworks</subject><subject>Estimating techniques</subject><subject>Hauling</subject><subject>Plant Cycle Times</subject><subject>Project management</subject><subject>Rolling Resistance</subject><subject>Soils</subject><subject>Studies</subject><issn>0144-6193</issn><issn>1466-433X</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2000</creationdate><recordtype>article</recordtype><recordid>eNqFUD1PwzAUtBBIlMLMGrEwhdp-TmqzVRWfqsQCEpvl2k6b0sTBcSn59zgKYkBCDM9n6d2dz4fQOcFXBHM8wYSxnAiMYYo5gwM0IizPUwbweohG_TaNazhGJ227wRgzisUIXc6S2u4Tq3xY751_axPbhrJSoaxXSWXD2hm3davuFB0Vatvas28co5fbm-f5fbp4unuYzxapBpaFtFBGKKZBGJuZXE9zAKsohanOGckxJxpMZviSKE4tpUJYyxQXBfClAcoMjNHF4Nt4976LWeTG7Xwdn5SUABGUZHkkTQaS9q5tvS1k42Nm30mCZV-G_FVGVDwOCm8bq3_oQRXa1dUqyA8JivB4dHForCdC2V_jND0SISnlch2qaJYNZmVdOF-p2NvWRK9u63zhVa3L9ncAGT5D1F3_q4O_fvAFvfCNxQ</recordid><startdate>20000301</startdate><enddate>20000301</enddate><creator>Smith, Simon D.</creator><creator>Wood, Graeme S.</creator><creator>Gould, Martin</creator><general>Taylor &amp; Francis Group</general><general>Taylor and Francis Journals</general><general>E. &amp; F.N. Spon</general><scope>DKI</scope><scope>X2L</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>20000301</creationdate><title>A new earthworks estimating methodology</title><author>Smith, Simon D. ; Wood, Graeme S. ; Gould, Martin</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c345t-fad9a4c39de5d6c7633ea2237c6416081c3d5d8b1a82e2299ee4a89f38bd324d3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2000</creationdate><topic>Civil engineering</topic><topic>Earthmoving equipment</topic><topic>Earthmoving Plant</topic><topic>Earthworks</topic><topic>Estimating techniques</topic><topic>Hauling</topic><topic>Plant Cycle Times</topic><topic>Project management</topic><topic>Rolling Resistance</topic><topic>Soils</topic><topic>Studies</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Smith, Simon D.</creatorcontrib><creatorcontrib>Wood, Graeme S.</creatorcontrib><creatorcontrib>Gould, Martin</creatorcontrib><collection>RePEc IDEAS</collection><collection>RePEc</collection><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Construction management and economics</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Smith, Simon D.</au><au>Wood, Graeme S.</au><au>Gould, Martin</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A new earthworks estimating methodology</atitle><jtitle>Construction management and economics</jtitle><date>2000-03-01</date><risdate>2000</risdate><volume>18</volume><issue>2</issue><spage>219</spage><epage>228</epage><pages>219-228</pages><issn>0144-6193</issn><eissn>1466-433X</eissn><abstract>Earthworks and earthmoving operations are a major part of many civil engineering construction projects. Because of their labour and plant intensity, the planning and estimating of such operations is crucial to both the cost and duration of the project; earthworks are considered by many practitioners to be indicators to the success or failure of the project as a whole. Traditionally, a mixture of manufacturers' data (through published charts or computer databases) and historical company data are used in the estimating of earthworks. This process has two main drawbacks. First, plant haul velocity is dependent on the rolling resistance at the soil-wheel interface, which is notoriously difficult to determine; second, the stochastic interface between types of plant provides a non-deterministic system, resulting in estimates of output which may be unrealistically high. An alternative system of earthworks estimating is presented based on a combination of work undertaken in both the soil/vehicle and stochastic estimating fields. This system is demonstrated via a case study based on an actual highway project. The main conclusion to be drawn is that the traditional estimating approach results in a scheme costed well below realistic values.</abstract><cop>London</cop><pub>Taylor &amp; Francis Group</pub><doi>10.1080/014461900370843</doi><tpages>10</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0144-6193
ispartof Construction management and economics, 2000-03, Vol.18 (2), p.219-228
issn 0144-6193
1466-433X
language eng
recordid cdi_proquest_journals_213192156
source Business Source Ultimate; Taylor & Francis
subjects Civil engineering
Earthmoving equipment
Earthmoving Plant
Earthworks
Estimating techniques
Hauling
Plant Cycle Times
Project management
Rolling Resistance
Soils
Studies
title A new earthworks estimating methodology
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-08T07%3A42%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20new%20earthworks%20estimating%20methodology&rft.jtitle=Construction%20management%20and%20economics&rft.au=Smith,%20Simon%20D.&rft.date=2000-03-01&rft.volume=18&rft.issue=2&rft.spage=219&rft.epage=228&rft.pages=219-228&rft.issn=0144-6193&rft.eissn=1466-433X&rft_id=info:doi/10.1080/014461900370843&rft_dat=%3Cproquest_cross%3E48291285%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c345t-fad9a4c39de5d6c7633ea2237c6416081c3d5d8b1a82e2299ee4a89f38bd324d3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=213192156&rft_id=info:pmid/&rfr_iscdi=true