A new earthworks estimating methodology
Earthworks and earthmoving operations are a major part of many civil engineering construction projects. Because of their labour and plant intensity, the planning and estimating of such operations is crucial to both the cost and duration of the project; earthworks are considered by many practitioners...
Saved in:
Published in: | Construction management and economics 2000-03, Vol.18 (2), p.219-228 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c345t-fad9a4c39de5d6c7633ea2237c6416081c3d5d8b1a82e2299ee4a89f38bd324d3 |
---|---|
cites | cdi_FETCH-LOGICAL-c345t-fad9a4c39de5d6c7633ea2237c6416081c3d5d8b1a82e2299ee4a89f38bd324d3 |
container_end_page | 228 |
container_issue | 2 |
container_start_page | 219 |
container_title | Construction management and economics |
container_volume | 18 |
creator | Smith, Simon D. Wood, Graeme S. Gould, Martin |
description | Earthworks and earthmoving operations are a major part of many civil engineering construction projects. Because of their labour and plant intensity, the planning and estimating of such operations is crucial to both the cost and duration of the project; earthworks are considered by many practitioners to be indicators to the success or failure of the project as a whole. Traditionally, a mixture of manufacturers' data (through published charts or computer databases) and historical company data are used in the estimating of earthworks. This process has two main drawbacks. First, plant haul velocity is dependent on the rolling resistance at the soil-wheel interface, which is notoriously difficult to determine; second, the stochastic interface between types of plant provides a non-deterministic system, resulting in estimates of output which may be unrealistically high. An alternative system of earthworks estimating is presented based on a combination of work undertaken in both the soil/vehicle and stochastic estimating fields. This system is demonstrated via a case study based on an actual highway project. The main conclusion to be drawn is that the traditional estimating approach results in a scheme costed well below realistic values. |
doi_str_mv | 10.1080/014461900370843 |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_213192156</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>48291285</sourcerecordid><originalsourceid>FETCH-LOGICAL-c345t-fad9a4c39de5d6c7633ea2237c6416081c3d5d8b1a82e2299ee4a89f38bd324d3</originalsourceid><addsrcrecordid>eNqFUD1PwzAUtBBIlMLMGrEwhdp-TmqzVRWfqsQCEpvl2k6b0sTBcSn59zgKYkBCDM9n6d2dz4fQOcFXBHM8wYSxnAiMYYo5gwM0IizPUwbweohG_TaNazhGJ227wRgzisUIXc6S2u4Tq3xY751_axPbhrJSoaxXSWXD2hm3davuFB0Vatvas28co5fbm-f5fbp4unuYzxapBpaFtFBGKKZBGJuZXE9zAKsohanOGckxJxpMZviSKE4tpUJYyxQXBfClAcoMjNHF4Nt4976LWeTG7Xwdn5SUABGUZHkkTQaS9q5tvS1k42Nm30mCZV-G_FVGVDwOCm8bq3_oQRXa1dUqyA8JivB4dHForCdC2V_jND0SISnlch2qaJYNZmVdOF-p2NvWRK9u63zhVa3L9ncAGT5D1F3_q4O_fvAFvfCNxQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>213192156</pqid></control><display><type>article</type><title>A new earthworks estimating methodology</title><source>Business Source Ultimate</source><source>Taylor & Francis</source><creator>Smith, Simon D. ; Wood, Graeme S. ; Gould, Martin</creator><creatorcontrib>Smith, Simon D. ; Wood, Graeme S. ; Gould, Martin</creatorcontrib><description>Earthworks and earthmoving operations are a major part of many civil engineering construction projects. Because of their labour and plant intensity, the planning and estimating of such operations is crucial to both the cost and duration of the project; earthworks are considered by many practitioners to be indicators to the success or failure of the project as a whole. Traditionally, a mixture of manufacturers' data (through published charts or computer databases) and historical company data are used in the estimating of earthworks. This process has two main drawbacks. First, plant haul velocity is dependent on the rolling resistance at the soil-wheel interface, which is notoriously difficult to determine; second, the stochastic interface between types of plant provides a non-deterministic system, resulting in estimates of output which may be unrealistically high. An alternative system of earthworks estimating is presented based on a combination of work undertaken in both the soil/vehicle and stochastic estimating fields. This system is demonstrated via a case study based on an actual highway project. The main conclusion to be drawn is that the traditional estimating approach results in a scheme costed well below realistic values.</description><identifier>ISSN: 0144-6193</identifier><identifier>EISSN: 1466-433X</identifier><identifier>DOI: 10.1080/014461900370843</identifier><language>eng</language><publisher>London: Taylor & Francis Group</publisher><subject>Civil engineering ; Earthmoving equipment ; Earthmoving Plant ; Earthworks ; Estimating techniques ; Hauling ; Plant Cycle Times ; Project management ; Rolling Resistance ; Soils ; Studies</subject><ispartof>Construction management and economics, 2000-03, Vol.18 (2), p.219-228</ispartof><rights>Copyright Taylor & Francis Group, LLC 2000</rights><rights>Copyright E. & F.N. Spon Mar 2000</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c345t-fad9a4c39de5d6c7633ea2237c6416081c3d5d8b1a82e2299ee4a89f38bd324d3</citedby><cites>FETCH-LOGICAL-c345t-fad9a4c39de5d6c7633ea2237c6416081c3d5d8b1a82e2299ee4a89f38bd324d3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27923,27924</link.rule.ids><backlink>$$Uhttp://econpapers.repec.org/article/tafconmgt/v_3a18_3ay_3a2000_3ai_3a2_3ap_3a219-228.htm$$DView record in RePEc$$Hfree_for_read</backlink></links><search><creatorcontrib>Smith, Simon D.</creatorcontrib><creatorcontrib>Wood, Graeme S.</creatorcontrib><creatorcontrib>Gould, Martin</creatorcontrib><title>A new earthworks estimating methodology</title><title>Construction management and economics</title><description>Earthworks and earthmoving operations are a major part of many civil engineering construction projects. Because of their labour and plant intensity, the planning and estimating of such operations is crucial to both the cost and duration of the project; earthworks are considered by many practitioners to be indicators to the success or failure of the project as a whole. Traditionally, a mixture of manufacturers' data (through published charts or computer databases) and historical company data are used in the estimating of earthworks. This process has two main drawbacks. First, plant haul velocity is dependent on the rolling resistance at the soil-wheel interface, which is notoriously difficult to determine; second, the stochastic interface between types of plant provides a non-deterministic system, resulting in estimates of output which may be unrealistically high. An alternative system of earthworks estimating is presented based on a combination of work undertaken in both the soil/vehicle and stochastic estimating fields. This system is demonstrated via a case study based on an actual highway project. The main conclusion to be drawn is that the traditional estimating approach results in a scheme costed well below realistic values.</description><subject>Civil engineering</subject><subject>Earthmoving equipment</subject><subject>Earthmoving Plant</subject><subject>Earthworks</subject><subject>Estimating techniques</subject><subject>Hauling</subject><subject>Plant Cycle Times</subject><subject>Project management</subject><subject>Rolling Resistance</subject><subject>Soils</subject><subject>Studies</subject><issn>0144-6193</issn><issn>1466-433X</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2000</creationdate><recordtype>article</recordtype><recordid>eNqFUD1PwzAUtBBIlMLMGrEwhdp-TmqzVRWfqsQCEpvl2k6b0sTBcSn59zgKYkBCDM9n6d2dz4fQOcFXBHM8wYSxnAiMYYo5gwM0IizPUwbweohG_TaNazhGJ227wRgzisUIXc6S2u4Tq3xY751_axPbhrJSoaxXSWXD2hm3davuFB0Vatvas28co5fbm-f5fbp4unuYzxapBpaFtFBGKKZBGJuZXE9zAKsohanOGckxJxpMZviSKE4tpUJYyxQXBfClAcoMjNHF4Nt4976LWeTG7Xwdn5SUABGUZHkkTQaS9q5tvS1k42Nm30mCZV-G_FVGVDwOCm8bq3_oQRXa1dUqyA8JivB4dHForCdC2V_jND0SISnlch2qaJYNZmVdOF-p2NvWRK9u63zhVa3L9ncAGT5D1F3_q4O_fvAFvfCNxQ</recordid><startdate>20000301</startdate><enddate>20000301</enddate><creator>Smith, Simon D.</creator><creator>Wood, Graeme S.</creator><creator>Gould, Martin</creator><general>Taylor & Francis Group</general><general>Taylor and Francis Journals</general><general>E. & F.N. Spon</general><scope>DKI</scope><scope>X2L</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>20000301</creationdate><title>A new earthworks estimating methodology</title><author>Smith, Simon D. ; Wood, Graeme S. ; Gould, Martin</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c345t-fad9a4c39de5d6c7633ea2237c6416081c3d5d8b1a82e2299ee4a89f38bd324d3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2000</creationdate><topic>Civil engineering</topic><topic>Earthmoving equipment</topic><topic>Earthmoving Plant</topic><topic>Earthworks</topic><topic>Estimating techniques</topic><topic>Hauling</topic><topic>Plant Cycle Times</topic><topic>Project management</topic><topic>Rolling Resistance</topic><topic>Soils</topic><topic>Studies</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Smith, Simon D.</creatorcontrib><creatorcontrib>Wood, Graeme S.</creatorcontrib><creatorcontrib>Gould, Martin</creatorcontrib><collection>RePEc IDEAS</collection><collection>RePEc</collection><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Construction management and economics</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Smith, Simon D.</au><au>Wood, Graeme S.</au><au>Gould, Martin</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A new earthworks estimating methodology</atitle><jtitle>Construction management and economics</jtitle><date>2000-03-01</date><risdate>2000</risdate><volume>18</volume><issue>2</issue><spage>219</spage><epage>228</epage><pages>219-228</pages><issn>0144-6193</issn><eissn>1466-433X</eissn><abstract>Earthworks and earthmoving operations are a major part of many civil engineering construction projects. Because of their labour and plant intensity, the planning and estimating of such operations is crucial to both the cost and duration of the project; earthworks are considered by many practitioners to be indicators to the success or failure of the project as a whole. Traditionally, a mixture of manufacturers' data (through published charts or computer databases) and historical company data are used in the estimating of earthworks. This process has two main drawbacks. First, plant haul velocity is dependent on the rolling resistance at the soil-wheel interface, which is notoriously difficult to determine; second, the stochastic interface between types of plant provides a non-deterministic system, resulting in estimates of output which may be unrealistically high. An alternative system of earthworks estimating is presented based on a combination of work undertaken in both the soil/vehicle and stochastic estimating fields. This system is demonstrated via a case study based on an actual highway project. The main conclusion to be drawn is that the traditional estimating approach results in a scheme costed well below realistic values.</abstract><cop>London</cop><pub>Taylor & Francis Group</pub><doi>10.1080/014461900370843</doi><tpages>10</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0144-6193 |
ispartof | Construction management and economics, 2000-03, Vol.18 (2), p.219-228 |
issn | 0144-6193 1466-433X |
language | eng |
recordid | cdi_proquest_journals_213192156 |
source | Business Source Ultimate; Taylor & Francis |
subjects | Civil engineering Earthmoving equipment Earthmoving Plant Earthworks Estimating techniques Hauling Plant Cycle Times Project management Rolling Resistance Soils Studies |
title | A new earthworks estimating methodology |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-08T07%3A42%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20new%20earthworks%20estimating%20methodology&rft.jtitle=Construction%20management%20and%20economics&rft.au=Smith,%20Simon%20D.&rft.date=2000-03-01&rft.volume=18&rft.issue=2&rft.spage=219&rft.epage=228&rft.pages=219-228&rft.issn=0144-6193&rft.eissn=1466-433X&rft_id=info:doi/10.1080/014461900370843&rft_dat=%3Cproquest_cross%3E48291285%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c345t-fad9a4c39de5d6c7633ea2237c6416081c3d5d8b1a82e2299ee4a89f38bd324d3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=213192156&rft_id=info:pmid/&rfr_iscdi=true |