Loading…
Scheduling the flying squad nurses of a hospital using a multi-objective programming model
In this paper, we address the problem of scheduling nurses working on the flying squad of a hospital. Considering the large number of constraints, many of them being conflicting, the problem is formulated as a multi-objective programming problem with binary variables, where the objective function co...
Saved in:
Published in: | Annals of operations research 2000-01, Vol.96 (1), p.149 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In this paper, we address the problem of scheduling nurses working on the flying squad of a hospital. Considering the large number of constraints, many of them being conflicting, the problem is formulated as a multi-objective programming problem with binary variables, where the objective function consists of a vector of objectives and penalty variables (deviation measures) provided by the soft constraints. Two approaches are considered to solve the problem: the weighted method and the sequential method. The best results are obtained with a mix of the two solving methods. Numerical results are presented. [PUBLICATION ABSTRACT] |
---|---|
ISSN: | 0254-5330 1572-9338 |
DOI: | 10.1023/A:1018935031580 |