Loading…

Scheduling of open-pit phosphate mine extraction

Open-pit deposits are often characterised by a stack of layers of different geological nature. Some layers are worthless while the ore of the others is of a varying economic value depending on grade. To reach a layer, it is necessary to have first removed the upper layers above the extraction zone....

Full description

Saved in:
Bibliographic Details
Published in:International journal of production research 2018-12, Vol.56 (23), p.7122-7141
Main Authors: Azzamouri, Ahlam, Fénies, Pierre, Fontane, Frédéric, Giard, Vincent
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Open-pit deposits are often characterised by a stack of layers of different geological nature. Some layers are worthless while the ore of the others is of a varying economic value depending on grade. To reach a layer, it is necessary to have first removed the upper layers above the extraction zone. This action results in uncovering the layer in this particular place and in facilitating access to the layers below. This extraction process involves a series of 2-7 basic operations; each one is performed by a machine, some of which are able to perform up to three different operations. Ensuring the consistency of mining extraction scheduling over a few months, in order to meet known or forecast demand, is a challenging task. A mining extraction model based on mathematical programming is proposed but it is hardly usable, due to its size. Therefore, a model based on a Discrete Event Simulation, is created to test how ore supplies are affected by the tactical and operational decisions relating to the choice of parcels to be processed and to the allocation of machines to the different basic operations.
ISSN:0020-7543
1366-588X
DOI:10.1080/00207543.2018.1433341