Loading…
A numerical simulation technique to study fault activation characteristics during mining between fault bundles
Faults, especially fault bundles, elevate the difficulties of predicting, preventing and controlling water inrush during coal seam mining. This paper takes the no. 163 mining area at Jiangzhuang Coal Mine of Shandong Province, China, as a case study. A series of faults form structural patterns consi...
Saved in:
Published in: | Environmental earth sciences 2019-03, Vol.78 (5), p.1-11, Article 148 |
---|---|
Main Authors: | , , , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Faults, especially fault bundles, elevate the difficulties of predicting, preventing and controlling water inrush during coal seam mining. This paper takes the no. 163 mining area at Jiangzhuang Coal Mine of Shandong Province, China, as a case study. A series of faults form structural patterns consisting of the graben-horst and fault terrace in the study area. The key technical challenge lies in fault activation, which affects sizing of economic and safe coal-pillar around the fault bundles. An innovative numerical simulation technique was applied to understand the movement law of coal seam roof and floor and fault activation among the fault bundles under different mining plans. The results show that reasonable arrangement of mining sequence in the working faces is an effective method to reduce the influence from faults. In addition, coal seam roof and floor damage and faults activation are different during mining under the graben-horst and fault terrace settings. Moreover, the horizontal and vertical displacement values of each point on fault plane of hanging wall and footwall indicate that the maximum displacement is related to roof water-conducting fractured zone and floor damage zone, which increase the probability of fault activation. Based on the research results, a reasonable coal-pillar width was designed beside the fault bundle in the no. 16301 working face of the no. 163 mining area, and the mining was completed safely with significant economic benefits for Jiangzhuang Coal Mine. |
---|---|
ISSN: | 1866-6280 1866-6299 |
DOI: | 10.1007/s12665-019-8142-2 |