Loading…
Opposing Regulation of Performance Factors in an Alternating-Current Traction Power-Supply System
The provision of scheduled freight and passenger rail transportation is carried out according to the train schedule, for successful fulfillment of which it is necessary to maintain the desired voltage level at locomotive pantographs. The voltage depends on the position of switching devices of distri...
Saved in:
Published in: | Russian electrical engineering 2019-07, Vol.90 (7), p.522-525 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The provision of scheduled freight and passenger rail transportation is carried out according to the train schedule, for successful fulfillment of which it is necessary to maintain the desired voltage level at locomotive pantographs. The voltage depends on the position of switching devices of distributing equipment and voltage regulation facilities. To increase operating efficiency, it is proposed to carry out the opposing interval regulation of performance factors of the traction power-supply system. The predictive sequence of discrete values of performance factors is determined by fulfilled train schedules and consumer loads. The discrete values are the initial data to determining the time intervals. The number of time intervals for 24 h is chosen taking into account the switching service life of devices and equipment. The time intervals and the predictive average values in intervals are the main criteria to choosing the proper power-supply circuits of traction loads. |
---|---|
ISSN: | 1068-3712 1934-8010 |
DOI: | 10.3103/S1068371219070137 |