Loading…
TREAT Restart Project
The Resumption of Transient Testing Program was created to re-establish transient testing capability in the United States, specifically at the Transient Reactor Test (TREAT) Facility, located at the Idaho National Laboratory. The restart of TREAT began in early 2014 and concluded in August of 2017....
Saved in:
Published in: | Nuclear technology 2019-10, Vol.205 (10), p.1369-1377 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The Resumption of Transient Testing Program was created to re-establish transient testing capability in the United States, specifically at the Transient Reactor Test (TREAT) Facility, located at the Idaho National Laboratory. The restart of TREAT began in early 2014 and concluded in August of 2017. The restart of TREAT occurred 13Â months ahead of schedule and $20 million below the $75 million original budget. High-level detail of the restart effort along with several significant factors that contributed to successful restart of TREAT are discussed. |
---|---|
ISSN: | 0029-5450 1943-7471 |
DOI: | 10.1080/00295450.2019.1589853 |