Using 4D BIM to assess construction risks during the design phase
Purpose The prevention through design (PtD) concept has been widely recognized as one of the most effective approaches to eliminate or reduce construction site hazards. It encourages engineers and architects to consider occupational safety and health during the planning and design phases. Neverthele...
Saved in:
Published in: | Engineering, construction, and architectural management construction, and architectural management, 2019-11, Vol.26 (11), p.2637-2654 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Purpose
The prevention through design (PtD) concept has been widely recognized as one of the most effective approaches to eliminate or reduce construction site hazards. It encourages engineers and architects to consider occupational safety and health during the planning and design phases. Nevertheless, the implementation of PtD is often inhibited because designers lack adequate knowledge about construction safety and the construction process, and limited design-for-safety tools and procedures are available for designers to use. The purpose of this paper is to provide designers a tool for assessing construction risks during early phases of multistory building projects at an activity level and on a daily basis in a 4D environment. By using the tool, proactive measures could be taken in the design and planning phase to reduce site hazards.
Design/methodology/approach
The proposed method consists of four steps including risk quantification at a design element level, 4D model integration with risk values, risk assessment, and design alternative selection and model acceptance. A case study was carried out to test and verify the proposed method.
Findings
The proposed tool has the capability to assess the safety risk for an entire multistory project and visualize safety risk in a particular time period, work space and task prior to construction. It benefits designers in conducting risk assessments and selecting design alternatives concerning safety. Contractors could also utilize the visualization and simulation results of the 4D model for site safety planning so that a range of risk mitigation strategies could be implemented during construction.
Originality/value
The study provides an innovative PtD tool targeting designers as primary end-users. The proposed tool helps designers assess construction risks and has potential to incorporate the top levels of the hierarchy of risk controls. |
---|---|
ISSN: | 0969-9988 1365-232X |
DOI: | 10.1108/ECAM-09-2018-0379 |