Assessment of Photovoltaic Potential of Mining Sites in Uzbekistan

The present study analyzed the potential of eight operational mining sites in Uzbekistan for the installation of photovoltaic (PV) systems: Sarmich, Ingichka, Kuytosh, Yakhton, Chauli, Sherobod, Chorkesar, and Tebinbuloq. A PV system with 1 MW capacity, which required a total of 4926 m2 of project l...

Full description

Saved in:
Bibliographic Details
Published in:Sustainability 2019-05, Vol.11 (10), p.2988
Main Authors: Mardonova, Mokhinabonu, Choi, Yosoon
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The present study analyzed the potential of eight operational mining sites in Uzbekistan for the installation of photovoltaic (PV) systems: Sarmich, Ingichka, Kuytosh, Yakhton, Chauli, Sherobod, Chorkesar, and Tebinbuloq. A PV system with 1 MW capacity, which required a total of 4926 m2 of project land, was considered. The renewable energy analysis software RETScreen, developed by Natural Resources Canada (NRC), was used to calculate energy production, greenhouse gas reduction, and financial factors of the PV systems in the selected study areas. The iron mine Tebinbuloq in Karakalpak showed the highest potential, with annual electricity production of approximately 1685 MWh, equating to a potential reduction of approximately 930 tons of greenhouse gases. The economic benefit of the PV system in this mine was $2.217 million USD net present value with a project payback period of approximately 13 years. The results of precision checks of satellite- and ground-based solar measurements showed high correlations; hence, satellite-based data can be applied for solar project assessments where solar monitoring meteorological stations are not available.
ISSN:2071-1050
2071-1050
DOI:10.3390/su11102988