Loading…

A study on the application of the distributed optical fiber sensing monitoring technology in the process of dismantling temporary tunnel shoring

Temporary shorings are necessary for the stabilization of the tunnels with large cross-sections that are excavated using the New Austrian tunnelling method. The dismantling of the temporary shoring during the process of secondary lining construction would be a very serious threat to the safety of th...

Full description

Saved in:
Bibliographic Details
Published in:Arabian journal of geosciences 2020-10, Vol.13 (19), Article 1036
Main Authors: Li, Zi-Xiang, Hou, Gong-Yu, Hu, Tao, Zhou, Tian-Ci, Xiao, Hai-Lin
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by cdi_FETCH-LOGICAL-c319t-1d47a2e97557d759601ec1718b023750526529999a8b7050641990634dab1d6d3
cites cdi_FETCH-LOGICAL-c319t-1d47a2e97557d759601ec1718b023750526529999a8b7050641990634dab1d6d3
container_end_page
container_issue 19
container_start_page
container_title Arabian journal of geosciences
container_volume 13
creator Li, Zi-Xiang
Hou, Gong-Yu
Hu, Tao
Zhou, Tian-Ci
Xiao, Hai-Lin
description Temporary shorings are necessary for the stabilization of the tunnels with large cross-sections that are excavated using the New Austrian tunnelling method. The dismantling of the temporary shoring during the process of secondary lining construction would be a very serious threat to the safety of the tunnel. Therefore, in this work, a field observation was made based on distributed optical fiber sensing monitoring technology in order to determine the deformation behavior of the tunnel and to identify the most influential steps of dismantlement. The study is carried out during the tunnel’s temporary shoring dismantling stage. The performance of the tunnel during every dismantling stage was analyzed based on the monitoring results using the finite element numerical simulation method. Based on the analysis results, the settlement of the tunnel was estimated through the strain curve that was obtained by using optical fiber. Furthermore, the study results showed that the continuous removal at the bottom of the shoring of the tunnel weakens the vertical support force at the bottom of the tunnel and thereby resulting in large settlement variation in all the dismantling steps. The highest value of the settlement variation obtained during the analysis is 5.7 mm, and the corresponding tensile strain variation of the crown is 50 με. Furthermore, the results showed that it is feasible to use the optical fiber to estimate the settlement of the tunnel. The max deviation obtained was 0.9 mm and the results were compared with the results of a total station. The study results of this research are applicable to the tunnels that were excavated using the New Austrian tunnelling method and have temporary shorings.
doi_str_mv 10.1007/s12517-020-06069-0
format article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2450279097</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2450279097</sourcerecordid><originalsourceid>FETCH-LOGICAL-c319t-1d47a2e97557d759601ec1718b023750526529999a8b7050641990634dab1d6d3</originalsourceid><addsrcrecordid>eNp9kM1OxCAUhRujiePoC7gicV290AJlOZn4l0ziRtekLXSGSQsV6GLewkeWmRrdyYZ74ZyPy8myWwz3GIA_BEwo5jkQyIEBEzmcZQtcMZZzWlTnvzXGl9lVCHsAVgGvFtnXCoU4qQNyFsWdRvU49qato0m9605HyoToTTNFrZAbY7rtUWca7VHQNhi7RYOzJjp_LKNud9b1bntAZiaO3rU6hCMtkYbaxn4WDqPztT-gOFmrexR2J8J1dtHVfdA3P_sy-3h6fF-_5Ju359f1apO3BRYxx6rkNdGCU8oVp4IB1i3muGqAFJwCJYwSkVZdNRwosBILAawoVd1gxVSxzO5mbprvc9Ihyr2bvE1PSlJSIFyA4ElFZlXrXQhed3L0ZkhTSwzymLyck5cpeXlKXkIyFbMpjMcfaf-H_sf1DQaLiDQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2450279097</pqid></control><display><type>article</type><title>A study on the application of the distributed optical fiber sensing monitoring technology in the process of dismantling temporary tunnel shoring</title><source>Springer Nature</source><creator>Li, Zi-Xiang ; Hou, Gong-Yu ; Hu, Tao ; Zhou, Tian-Ci ; Xiao, Hai-Lin</creator><creatorcontrib>Li, Zi-Xiang ; Hou, Gong-Yu ; Hu, Tao ; Zhou, Tian-Ci ; Xiao, Hai-Lin</creatorcontrib><description>Temporary shorings are necessary for the stabilization of the tunnels with large cross-sections that are excavated using the New Austrian tunnelling method. The dismantling of the temporary shoring during the process of secondary lining construction would be a very serious threat to the safety of the tunnel. Therefore, in this work, a field observation was made based on distributed optical fiber sensing monitoring technology in order to determine the deformation behavior of the tunnel and to identify the most influential steps of dismantlement. The study is carried out during the tunnel’s temporary shoring dismantling stage. The performance of the tunnel during every dismantling stage was analyzed based on the monitoring results using the finite element numerical simulation method. Based on the analysis results, the settlement of the tunnel was estimated through the strain curve that was obtained by using optical fiber. Furthermore, the study results showed that the continuous removal at the bottom of the shoring of the tunnel weakens the vertical support force at the bottom of the tunnel and thereby resulting in large settlement variation in all the dismantling steps. The highest value of the settlement variation obtained during the analysis is 5.7 mm, and the corresponding tensile strain variation of the crown is 50 με. Furthermore, the results showed that it is feasible to use the optical fiber to estimate the settlement of the tunnel. The max deviation obtained was 0.9 mm and the results were compared with the results of a total station. The study results of this research are applicable to the tunnels that were excavated using the New Austrian tunnelling method and have temporary shorings.</description><identifier>ISSN: 1866-7511</identifier><identifier>EISSN: 1866-7538</identifier><identifier>DOI: 10.1007/s12517-020-06069-0</identifier><language>eng</language><publisher>Cham: Springer International Publishing</publisher><subject>Deformation ; Dismantling ; Earth and Environmental Science ; Earth science ; Earth Sciences ; Finite element method ; Mathematical analysis ; Mathematical models ; Monitoring ; New Austrian Tunnelling Method ; Optical fibers ; Original Paper ; Shoring ; Technology ; Tensile strain ; Tunneling ; Tunnels ; Variation ; Vertical forces</subject><ispartof>Arabian journal of geosciences, 2020-10, Vol.13 (19), Article 1036</ispartof><rights>Saudi Society for Geosciences 2020</rights><rights>Saudi Society for Geosciences 2020.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c319t-1d47a2e97557d759601ec1718b023750526529999a8b7050641990634dab1d6d3</citedby><cites>FETCH-LOGICAL-c319t-1d47a2e97557d759601ec1718b023750526529999a8b7050641990634dab1d6d3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27922,27923</link.rule.ids></links><search><creatorcontrib>Li, Zi-Xiang</creatorcontrib><creatorcontrib>Hou, Gong-Yu</creatorcontrib><creatorcontrib>Hu, Tao</creatorcontrib><creatorcontrib>Zhou, Tian-Ci</creatorcontrib><creatorcontrib>Xiao, Hai-Lin</creatorcontrib><title>A study on the application of the distributed optical fiber sensing monitoring technology in the process of dismantling temporary tunnel shoring</title><title>Arabian journal of geosciences</title><addtitle>Arab J Geosci</addtitle><description>Temporary shorings are necessary for the stabilization of the tunnels with large cross-sections that are excavated using the New Austrian tunnelling method. The dismantling of the temporary shoring during the process of secondary lining construction would be a very serious threat to the safety of the tunnel. Therefore, in this work, a field observation was made based on distributed optical fiber sensing monitoring technology in order to determine the deformation behavior of the tunnel and to identify the most influential steps of dismantlement. The study is carried out during the tunnel’s temporary shoring dismantling stage. The performance of the tunnel during every dismantling stage was analyzed based on the monitoring results using the finite element numerical simulation method. Based on the analysis results, the settlement of the tunnel was estimated through the strain curve that was obtained by using optical fiber. Furthermore, the study results showed that the continuous removal at the bottom of the shoring of the tunnel weakens the vertical support force at the bottom of the tunnel and thereby resulting in large settlement variation in all the dismantling steps. The highest value of the settlement variation obtained during the analysis is 5.7 mm, and the corresponding tensile strain variation of the crown is 50 με. Furthermore, the results showed that it is feasible to use the optical fiber to estimate the settlement of the tunnel. The max deviation obtained was 0.9 mm and the results were compared with the results of a total station. The study results of this research are applicable to the tunnels that were excavated using the New Austrian tunnelling method and have temporary shorings.</description><subject>Deformation</subject><subject>Dismantling</subject><subject>Earth and Environmental Science</subject><subject>Earth science</subject><subject>Earth Sciences</subject><subject>Finite element method</subject><subject>Mathematical analysis</subject><subject>Mathematical models</subject><subject>Monitoring</subject><subject>New Austrian Tunnelling Method</subject><subject>Optical fibers</subject><subject>Original Paper</subject><subject>Shoring</subject><subject>Technology</subject><subject>Tensile strain</subject><subject>Tunneling</subject><subject>Tunnels</subject><subject>Variation</subject><subject>Vertical forces</subject><issn>1866-7511</issn><issn>1866-7538</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2020</creationdate><recordtype>article</recordtype><recordid>eNp9kM1OxCAUhRujiePoC7gicV290AJlOZn4l0ziRtekLXSGSQsV6GLewkeWmRrdyYZ74ZyPy8myWwz3GIA_BEwo5jkQyIEBEzmcZQtcMZZzWlTnvzXGl9lVCHsAVgGvFtnXCoU4qQNyFsWdRvU49qato0m9605HyoToTTNFrZAbY7rtUWca7VHQNhi7RYOzJjp_LKNud9b1bntAZiaO3rU6hCMtkYbaxn4WDqPztT-gOFmrexR2J8J1dtHVfdA3P_sy-3h6fF-_5Ju359f1apO3BRYxx6rkNdGCU8oVp4IB1i3muGqAFJwCJYwSkVZdNRwosBILAawoVd1gxVSxzO5mbprvc9Ihyr2bvE1PSlJSIFyA4ElFZlXrXQhed3L0ZkhTSwzymLyck5cpeXlKXkIyFbMpjMcfaf-H_sf1DQaLiDQ</recordid><startdate>20201001</startdate><enddate>20201001</enddate><creator>Li, Zi-Xiang</creator><creator>Hou, Gong-Yu</creator><creator>Hu, Tao</creator><creator>Zhou, Tian-Ci</creator><creator>Xiao, Hai-Lin</creator><general>Springer International Publishing</general><general>Springer Nature B.V</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7UA</scope><scope>C1K</scope><scope>F1W</scope><scope>H96</scope><scope>L.G</scope></search><sort><creationdate>20201001</creationdate><title>A study on the application of the distributed optical fiber sensing monitoring technology in the process of dismantling temporary tunnel shoring</title><author>Li, Zi-Xiang ; Hou, Gong-Yu ; Hu, Tao ; Zhou, Tian-Ci ; Xiao, Hai-Lin</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c319t-1d47a2e97557d759601ec1718b023750526529999a8b7050641990634dab1d6d3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2020</creationdate><topic>Deformation</topic><topic>Dismantling</topic><topic>Earth and Environmental Science</topic><topic>Earth science</topic><topic>Earth Sciences</topic><topic>Finite element method</topic><topic>Mathematical analysis</topic><topic>Mathematical models</topic><topic>Monitoring</topic><topic>New Austrian Tunnelling Method</topic><topic>Optical fibers</topic><topic>Original Paper</topic><topic>Shoring</topic><topic>Technology</topic><topic>Tensile strain</topic><topic>Tunneling</topic><topic>Tunnels</topic><topic>Variation</topic><topic>Vertical forces</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Li, Zi-Xiang</creatorcontrib><creatorcontrib>Hou, Gong-Yu</creatorcontrib><creatorcontrib>Hu, Tao</creatorcontrib><creatorcontrib>Zhou, Tian-Ci</creatorcontrib><creatorcontrib>Xiao, Hai-Lin</creatorcontrib><collection>CrossRef</collection><collection>Water Resources Abstracts</collection><collection>Environmental Sciences and Pollution Management</collection><collection>ASFA: Aquatic Sciences and Fisheries Abstracts</collection><collection>Aquatic Science &amp; Fisheries Abstracts (ASFA) 2: Ocean Technology, Policy &amp; Non-Living Resources</collection><collection>Aquatic Science &amp; Fisheries Abstracts (ASFA) Professional</collection><jtitle>Arabian journal of geosciences</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Li, Zi-Xiang</au><au>Hou, Gong-Yu</au><au>Hu, Tao</au><au>Zhou, Tian-Ci</au><au>Xiao, Hai-Lin</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A study on the application of the distributed optical fiber sensing monitoring technology in the process of dismantling temporary tunnel shoring</atitle><jtitle>Arabian journal of geosciences</jtitle><stitle>Arab J Geosci</stitle><date>2020-10-01</date><risdate>2020</risdate><volume>13</volume><issue>19</issue><artnum>1036</artnum><issn>1866-7511</issn><eissn>1866-7538</eissn><abstract>Temporary shorings are necessary for the stabilization of the tunnels with large cross-sections that are excavated using the New Austrian tunnelling method. The dismantling of the temporary shoring during the process of secondary lining construction would be a very serious threat to the safety of the tunnel. Therefore, in this work, a field observation was made based on distributed optical fiber sensing monitoring technology in order to determine the deformation behavior of the tunnel and to identify the most influential steps of dismantlement. The study is carried out during the tunnel’s temporary shoring dismantling stage. The performance of the tunnel during every dismantling stage was analyzed based on the monitoring results using the finite element numerical simulation method. Based on the analysis results, the settlement of the tunnel was estimated through the strain curve that was obtained by using optical fiber. Furthermore, the study results showed that the continuous removal at the bottom of the shoring of the tunnel weakens the vertical support force at the bottom of the tunnel and thereby resulting in large settlement variation in all the dismantling steps. The highest value of the settlement variation obtained during the analysis is 5.7 mm, and the corresponding tensile strain variation of the crown is 50 με. Furthermore, the results showed that it is feasible to use the optical fiber to estimate the settlement of the tunnel. The max deviation obtained was 0.9 mm and the results were compared with the results of a total station. The study results of this research are applicable to the tunnels that were excavated using the New Austrian tunnelling method and have temporary shorings.</abstract><cop>Cham</cop><pub>Springer International Publishing</pub><doi>10.1007/s12517-020-06069-0</doi></addata></record>
fulltext fulltext
identifier ISSN: 1866-7511
ispartof Arabian journal of geosciences, 2020-10, Vol.13 (19), Article 1036
issn 1866-7511
1866-7538
language eng
recordid cdi_proquest_journals_2450279097
source Springer Nature
subjects Deformation
Dismantling
Earth and Environmental Science
Earth science
Earth Sciences
Finite element method
Mathematical analysis
Mathematical models
Monitoring
New Austrian Tunnelling Method
Optical fibers
Original Paper
Shoring
Technology
Tensile strain
Tunneling
Tunnels
Variation
Vertical forces
title A study on the application of the distributed optical fiber sensing monitoring technology in the process of dismantling temporary tunnel shoring
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T20%3A16%3A39IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20study%20on%20the%20application%20of%20the%20distributed%20optical%20fiber%20sensing%20monitoring%20technology%20in%20the%20process%20of%20dismantling%20temporary%20tunnel%20shoring&rft.jtitle=Arabian%20journal%20of%20geosciences&rft.au=Li,%20Zi-Xiang&rft.date=2020-10-01&rft.volume=13&rft.issue=19&rft.artnum=1036&rft.issn=1866-7511&rft.eissn=1866-7538&rft_id=info:doi/10.1007/s12517-020-06069-0&rft_dat=%3Cproquest_cross%3E2450279097%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c319t-1d47a2e97557d759601ec1718b023750526529999a8b7050641990634dab1d6d3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2450279097&rft_id=info:pmid/&rfr_iscdi=true