Loading…
A study on the application of the distributed optical fiber sensing monitoring technology in the process of dismantling temporary tunnel shoring
Temporary shorings are necessary for the stabilization of the tunnels with large cross-sections that are excavated using the New Austrian tunnelling method. The dismantling of the temporary shoring during the process of secondary lining construction would be a very serious threat to the safety of th...
Saved in:
Published in: | Arabian journal of geosciences 2020-10, Vol.13 (19), Article 1036 |
---|---|
Main Authors: | , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c319t-1d47a2e97557d759601ec1718b023750526529999a8b7050641990634dab1d6d3 |
---|---|
cites | cdi_FETCH-LOGICAL-c319t-1d47a2e97557d759601ec1718b023750526529999a8b7050641990634dab1d6d3 |
container_end_page | |
container_issue | 19 |
container_start_page | |
container_title | Arabian journal of geosciences |
container_volume | 13 |
creator | Li, Zi-Xiang Hou, Gong-Yu Hu, Tao Zhou, Tian-Ci Xiao, Hai-Lin |
description | Temporary shorings are necessary for the stabilization of the tunnels with large cross-sections that are excavated using the New Austrian tunnelling method. The dismantling of the temporary shoring during the process of secondary lining construction would be a very serious threat to the safety of the tunnel. Therefore, in this work, a field observation was made based on distributed optical fiber sensing monitoring technology in order to determine the deformation behavior of the tunnel and to identify the most influential steps of dismantlement. The study is carried out during the tunnel’s temporary shoring dismantling stage. The performance of the tunnel during every dismantling stage was analyzed based on the monitoring results using the finite element numerical simulation method. Based on the analysis results, the settlement of the tunnel was estimated through the strain curve that was obtained by using optical fiber. Furthermore, the study results showed that the continuous removal at the bottom of the shoring of the tunnel weakens the vertical support force at the bottom of the tunnel and thereby resulting in large settlement variation in all the dismantling steps. The highest value of the settlement variation obtained during the analysis is 5.7 mm, and the corresponding tensile strain variation of the crown is 50 με. Furthermore, the results showed that it is feasible to use the optical fiber to estimate the settlement of the tunnel. The max deviation obtained was 0.9 mm and the results were compared with the results of a total station. The study results of this research are applicable to the tunnels that were excavated using the New Austrian tunnelling method and have temporary shorings. |
doi_str_mv | 10.1007/s12517-020-06069-0 |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2450279097</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2450279097</sourcerecordid><originalsourceid>FETCH-LOGICAL-c319t-1d47a2e97557d759601ec1718b023750526529999a8b7050641990634dab1d6d3</originalsourceid><addsrcrecordid>eNp9kM1OxCAUhRujiePoC7gicV290AJlOZn4l0ziRtekLXSGSQsV6GLewkeWmRrdyYZ74ZyPy8myWwz3GIA_BEwo5jkQyIEBEzmcZQtcMZZzWlTnvzXGl9lVCHsAVgGvFtnXCoU4qQNyFsWdRvU49qato0m9605HyoToTTNFrZAbY7rtUWca7VHQNhi7RYOzJjp_LKNud9b1bntAZiaO3rU6hCMtkYbaxn4WDqPztT-gOFmrexR2J8J1dtHVfdA3P_sy-3h6fF-_5Ju359f1apO3BRYxx6rkNdGCU8oVp4IB1i3muGqAFJwCJYwSkVZdNRwosBILAawoVd1gxVSxzO5mbprvc9Ihyr2bvE1PSlJSIFyA4ElFZlXrXQhed3L0ZkhTSwzymLyck5cpeXlKXkIyFbMpjMcfaf-H_sf1DQaLiDQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2450279097</pqid></control><display><type>article</type><title>A study on the application of the distributed optical fiber sensing monitoring technology in the process of dismantling temporary tunnel shoring</title><source>Springer Nature</source><creator>Li, Zi-Xiang ; Hou, Gong-Yu ; Hu, Tao ; Zhou, Tian-Ci ; Xiao, Hai-Lin</creator><creatorcontrib>Li, Zi-Xiang ; Hou, Gong-Yu ; Hu, Tao ; Zhou, Tian-Ci ; Xiao, Hai-Lin</creatorcontrib><description>Temporary shorings are necessary for the stabilization of the tunnels with large cross-sections that are excavated using the New Austrian tunnelling method. The dismantling of the temporary shoring during the process of secondary lining construction would be a very serious threat to the safety of the tunnel. Therefore, in this work, a field observation was made based on distributed optical fiber sensing monitoring technology in order to determine the deformation behavior of the tunnel and to identify the most influential steps of dismantlement. The study is carried out during the tunnel’s temporary shoring dismantling stage. The performance of the tunnel during every dismantling stage was analyzed based on the monitoring results using the finite element numerical simulation method. Based on the analysis results, the settlement of the tunnel was estimated through the strain curve that was obtained by using optical fiber. Furthermore, the study results showed that the continuous removal at the bottom of the shoring of the tunnel weakens the vertical support force at the bottom of the tunnel and thereby resulting in large settlement variation in all the dismantling steps. The highest value of the settlement variation obtained during the analysis is 5.7 mm, and the corresponding tensile strain variation of the crown is 50 με. Furthermore, the results showed that it is feasible to use the optical fiber to estimate the settlement of the tunnel. The max deviation obtained was 0.9 mm and the results were compared with the results of a total station. The study results of this research are applicable to the tunnels that were excavated using the New Austrian tunnelling method and have temporary shorings.</description><identifier>ISSN: 1866-7511</identifier><identifier>EISSN: 1866-7538</identifier><identifier>DOI: 10.1007/s12517-020-06069-0</identifier><language>eng</language><publisher>Cham: Springer International Publishing</publisher><subject>Deformation ; Dismantling ; Earth and Environmental Science ; Earth science ; Earth Sciences ; Finite element method ; Mathematical analysis ; Mathematical models ; Monitoring ; New Austrian Tunnelling Method ; Optical fibers ; Original Paper ; Shoring ; Technology ; Tensile strain ; Tunneling ; Tunnels ; Variation ; Vertical forces</subject><ispartof>Arabian journal of geosciences, 2020-10, Vol.13 (19), Article 1036</ispartof><rights>Saudi Society for Geosciences 2020</rights><rights>Saudi Society for Geosciences 2020.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c319t-1d47a2e97557d759601ec1718b023750526529999a8b7050641990634dab1d6d3</citedby><cites>FETCH-LOGICAL-c319t-1d47a2e97557d759601ec1718b023750526529999a8b7050641990634dab1d6d3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27922,27923</link.rule.ids></links><search><creatorcontrib>Li, Zi-Xiang</creatorcontrib><creatorcontrib>Hou, Gong-Yu</creatorcontrib><creatorcontrib>Hu, Tao</creatorcontrib><creatorcontrib>Zhou, Tian-Ci</creatorcontrib><creatorcontrib>Xiao, Hai-Lin</creatorcontrib><title>A study on the application of the distributed optical fiber sensing monitoring technology in the process of dismantling temporary tunnel shoring</title><title>Arabian journal of geosciences</title><addtitle>Arab J Geosci</addtitle><description>Temporary shorings are necessary for the stabilization of the tunnels with large cross-sections that are excavated using the New Austrian tunnelling method. The dismantling of the temporary shoring during the process of secondary lining construction would be a very serious threat to the safety of the tunnel. Therefore, in this work, a field observation was made based on distributed optical fiber sensing monitoring technology in order to determine the deformation behavior of the tunnel and to identify the most influential steps of dismantlement. The study is carried out during the tunnel’s temporary shoring dismantling stage. The performance of the tunnel during every dismantling stage was analyzed based on the monitoring results using the finite element numerical simulation method. Based on the analysis results, the settlement of the tunnel was estimated through the strain curve that was obtained by using optical fiber. Furthermore, the study results showed that the continuous removal at the bottom of the shoring of the tunnel weakens the vertical support force at the bottom of the tunnel and thereby resulting in large settlement variation in all the dismantling steps. The highest value of the settlement variation obtained during the analysis is 5.7 mm, and the corresponding tensile strain variation of the crown is 50 με. Furthermore, the results showed that it is feasible to use the optical fiber to estimate the settlement of the tunnel. The max deviation obtained was 0.9 mm and the results were compared with the results of a total station. The study results of this research are applicable to the tunnels that were excavated using the New Austrian tunnelling method and have temporary shorings.</description><subject>Deformation</subject><subject>Dismantling</subject><subject>Earth and Environmental Science</subject><subject>Earth science</subject><subject>Earth Sciences</subject><subject>Finite element method</subject><subject>Mathematical analysis</subject><subject>Mathematical models</subject><subject>Monitoring</subject><subject>New Austrian Tunnelling Method</subject><subject>Optical fibers</subject><subject>Original Paper</subject><subject>Shoring</subject><subject>Technology</subject><subject>Tensile strain</subject><subject>Tunneling</subject><subject>Tunnels</subject><subject>Variation</subject><subject>Vertical forces</subject><issn>1866-7511</issn><issn>1866-7538</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2020</creationdate><recordtype>article</recordtype><recordid>eNp9kM1OxCAUhRujiePoC7gicV290AJlOZn4l0ziRtekLXSGSQsV6GLewkeWmRrdyYZ74ZyPy8myWwz3GIA_BEwo5jkQyIEBEzmcZQtcMZZzWlTnvzXGl9lVCHsAVgGvFtnXCoU4qQNyFsWdRvU49qato0m9605HyoToTTNFrZAbY7rtUWca7VHQNhi7RYOzJjp_LKNud9b1bntAZiaO3rU6hCMtkYbaxn4WDqPztT-gOFmrexR2J8J1dtHVfdA3P_sy-3h6fF-_5Ju359f1apO3BRYxx6rkNdGCU8oVp4IB1i3muGqAFJwCJYwSkVZdNRwosBILAawoVd1gxVSxzO5mbprvc9Ihyr2bvE1PSlJSIFyA4ElFZlXrXQhed3L0ZkhTSwzymLyck5cpeXlKXkIyFbMpjMcfaf-H_sf1DQaLiDQ</recordid><startdate>20201001</startdate><enddate>20201001</enddate><creator>Li, Zi-Xiang</creator><creator>Hou, Gong-Yu</creator><creator>Hu, Tao</creator><creator>Zhou, Tian-Ci</creator><creator>Xiao, Hai-Lin</creator><general>Springer International Publishing</general><general>Springer Nature B.V</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7UA</scope><scope>C1K</scope><scope>F1W</scope><scope>H96</scope><scope>L.G</scope></search><sort><creationdate>20201001</creationdate><title>A study on the application of the distributed optical fiber sensing monitoring technology in the process of dismantling temporary tunnel shoring</title><author>Li, Zi-Xiang ; Hou, Gong-Yu ; Hu, Tao ; Zhou, Tian-Ci ; Xiao, Hai-Lin</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c319t-1d47a2e97557d759601ec1718b023750526529999a8b7050641990634dab1d6d3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2020</creationdate><topic>Deformation</topic><topic>Dismantling</topic><topic>Earth and Environmental Science</topic><topic>Earth science</topic><topic>Earth Sciences</topic><topic>Finite element method</topic><topic>Mathematical analysis</topic><topic>Mathematical models</topic><topic>Monitoring</topic><topic>New Austrian Tunnelling Method</topic><topic>Optical fibers</topic><topic>Original Paper</topic><topic>Shoring</topic><topic>Technology</topic><topic>Tensile strain</topic><topic>Tunneling</topic><topic>Tunnels</topic><topic>Variation</topic><topic>Vertical forces</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Li, Zi-Xiang</creatorcontrib><creatorcontrib>Hou, Gong-Yu</creatorcontrib><creatorcontrib>Hu, Tao</creatorcontrib><creatorcontrib>Zhou, Tian-Ci</creatorcontrib><creatorcontrib>Xiao, Hai-Lin</creatorcontrib><collection>CrossRef</collection><collection>Water Resources Abstracts</collection><collection>Environmental Sciences and Pollution Management</collection><collection>ASFA: Aquatic Sciences and Fisheries Abstracts</collection><collection>Aquatic Science & Fisheries Abstracts (ASFA) 2: Ocean Technology, Policy & Non-Living Resources</collection><collection>Aquatic Science & Fisheries Abstracts (ASFA) Professional</collection><jtitle>Arabian journal of geosciences</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Li, Zi-Xiang</au><au>Hou, Gong-Yu</au><au>Hu, Tao</au><au>Zhou, Tian-Ci</au><au>Xiao, Hai-Lin</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A study on the application of the distributed optical fiber sensing monitoring technology in the process of dismantling temporary tunnel shoring</atitle><jtitle>Arabian journal of geosciences</jtitle><stitle>Arab J Geosci</stitle><date>2020-10-01</date><risdate>2020</risdate><volume>13</volume><issue>19</issue><artnum>1036</artnum><issn>1866-7511</issn><eissn>1866-7538</eissn><abstract>Temporary shorings are necessary for the stabilization of the tunnels with large cross-sections that are excavated using the New Austrian tunnelling method. The dismantling of the temporary shoring during the process of secondary lining construction would be a very serious threat to the safety of the tunnel. Therefore, in this work, a field observation was made based on distributed optical fiber sensing monitoring technology in order to determine the deformation behavior of the tunnel and to identify the most influential steps of dismantlement. The study is carried out during the tunnel’s temporary shoring dismantling stage. The performance of the tunnel during every dismantling stage was analyzed based on the monitoring results using the finite element numerical simulation method. Based on the analysis results, the settlement of the tunnel was estimated through the strain curve that was obtained by using optical fiber. Furthermore, the study results showed that the continuous removal at the bottom of the shoring of the tunnel weakens the vertical support force at the bottom of the tunnel and thereby resulting in large settlement variation in all the dismantling steps. The highest value of the settlement variation obtained during the analysis is 5.7 mm, and the corresponding tensile strain variation of the crown is 50 με. Furthermore, the results showed that it is feasible to use the optical fiber to estimate the settlement of the tunnel. The max deviation obtained was 0.9 mm and the results were compared with the results of a total station. The study results of this research are applicable to the tunnels that were excavated using the New Austrian tunnelling method and have temporary shorings.</abstract><cop>Cham</cop><pub>Springer International Publishing</pub><doi>10.1007/s12517-020-06069-0</doi></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1866-7511 |
ispartof | Arabian journal of geosciences, 2020-10, Vol.13 (19), Article 1036 |
issn | 1866-7511 1866-7538 |
language | eng |
recordid | cdi_proquest_journals_2450279097 |
source | Springer Nature |
subjects | Deformation Dismantling Earth and Environmental Science Earth science Earth Sciences Finite element method Mathematical analysis Mathematical models Monitoring New Austrian Tunnelling Method Optical fibers Original Paper Shoring Technology Tensile strain Tunneling Tunnels Variation Vertical forces |
title | A study on the application of the distributed optical fiber sensing monitoring technology in the process of dismantling temporary tunnel shoring |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T20%3A16%3A39IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20study%20on%20the%20application%20of%20the%20distributed%20optical%20fiber%20sensing%20monitoring%20technology%20in%20the%20process%20of%20dismantling%20temporary%20tunnel%20shoring&rft.jtitle=Arabian%20journal%20of%20geosciences&rft.au=Li,%20Zi-Xiang&rft.date=2020-10-01&rft.volume=13&rft.issue=19&rft.artnum=1036&rft.issn=1866-7511&rft.eissn=1866-7538&rft_id=info:doi/10.1007/s12517-020-06069-0&rft_dat=%3Cproquest_cross%3E2450279097%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c319t-1d47a2e97557d759601ec1718b023750526529999a8b7050641990634dab1d6d3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2450279097&rft_id=info:pmid/&rfr_iscdi=true |