Loading…

CMS RPC activities during LHC LS-2

The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. Al...

Full description

Saved in:
Bibliographic Details
Published in:Journal of instrumentation 2020-10, Vol.15 (10), p.C10025-C10025
Main Authors: Shah, M.A., Sawy, M. El, Samalan, A., Tytgat, M., Zaganidis, N., Alves, G.A., Marujo, F., Araujo, F. Torres Da Silva De, Costa, E.M. Da, Damiao, D. De Jesus, Nogima, H., Santoro, A., Souza, S. Fonseca De, Aleksandrov, A., Hadjiiska, R., Iaydjiev, P., Rodozov, M., Shopova, M., Soultanov, G., Bonchev, M., Dimitrov, A., Litov, L., Pavlov, B., Petkov, P., Petrov, A., Qian, S.J., Bernal, C., Cabrera, A., Fraga, J., Sarkar, A., Elsayed, S., Assran, Y., Mahmoud, M.A., Mohammed, Y., Combaret, C., Gouzevitch, M., Grenier, G., Laktineh, I., Mirabito, L., Shchablo, K., Bagaturia, I., Lomidze, D., Lomidze, I., Bhatnagar, V., Gupta, R., Kumari, P., Singh, J., Amoozegar, V., Boghrati, B., Ebraimi, M., Ghasemi, R., Najafabadi, M. Mohammadi, Zareian, E., Abbrescia, M., Aly, R., Elmetenawee, W., Filippis, N. De, Franco, M., Gelmi, A., Iaselli, G., Lacalamita, N., Leszki, S., Loddo, F., Margjeka, I., Pugliese, G., Ramos, D., Caponero, M., Benussi, L., Bianco, S., Colafranceschi, S., Russo, A., Passamonti, L., Piccolo, D., Pierluigi, D., Saviano, G., Buontempo, S., Crescenzo, A. Di, Fienga, F., Lellis, G. De, Lista, L., Meola, S., Paolucci, P., Braghieri, A., Salvini, P., Montagna, P., Riccardi, C., Vitulo, P., Francois, B., Kim, T.J., Park, J., Choi, S.Y., Hong, B., Lee, K.S., Goh, J., Lee, H., Eysermans, J., Estrada, C. Uribe, Pedraza, I., Castilla-Valdez, H., Sanchez-Hernandez, A.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade: improved RPC in stations RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.
ISSN:1748-0221
1748-0221
DOI:10.1088/1748-0221/15/10/C10025