Loading…
ARTIFICIAL NEURAL NETWORK BASE SHORT-TERM ELECTRICITY LOAD FORECASTING: A CASE STUDY OF A 132/33KV TRANSMISSION SUB-STATION
Forecasting of electrical load is extremely important for the effective and efficient operation of any power system. Good forecasts results help in minimizing the risk in decision making and reduces the costs of operating the power plant. This work focuses on the short-term load forecast of the 132/...
Saved in:
Published in: | International journal of energy economics and policy 2020-04, Vol.10 (2), p.200-205 |
---|---|
Main Authors: | , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Forecasting of electrical load is extremely important for the effective and efficient operation of any power system. Good forecasts results help in minimizing the risk in decision making and reduces the costs of operating the power plant. This work focuses on the short-term load forecast of the 132/33KV transmission sub-station at Port-Harcourt, Nigeria, using the Artificial Neural Network (ANN). It provides accurate week-ahead load forecast using hourly load data of previous weeks. ANN has three sections namely; input, processing and output sections. There are four input parameters for the input section which are historical hourly load data (in MW), time of the day (in hours), days of the week and weekend while the output parameter after the processing (i.e. training, validation and test) is the next week hourly load predicted for the entire system. The technique used is the artificial neural network with the aid of MATLAB software. It was proven to be a good forecast method as it resulted in R-value of 0.988 which gives a mean absolute deviation (MAD) of 0.104 and mean squared error (MSE) of 0.27. |
---|---|
ISSN: | 2146-4553 2146-4553 |
DOI: | 10.32479/ijeep.8629 |