Loading…
Annualization of Renewable Investment Costs for Finite Horizon Electricity Pricing and Cost Recovery
The increasing penetration of renewable electricity generation is complicating the bidding and estimating processes of electricity prices, partly due to the shift of the overall cost sensitivity from operation (fuel) costs to investment costs. However, cost minimization models for capacity expansion...
Saved in:
Published in: | Sustainability 2021-02, Vol.13 (4), p.1993 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | cdi_FETCH-LOGICAL-c254t-f694c7aabeb901260f5b29ee5fdcbf518cbadedc0f14424f183530fc12db1ac13 |
container_end_page | |
container_issue | 4 |
container_start_page | 1993 |
container_title | Sustainability |
container_volume | 13 |
creator | Campos, Fco. Alberto Villar, José Centeno, Efraim |
description | The increasing penetration of renewable electricity generation is complicating the bidding and estimating processes of electricity prices, partly due to the shift of the overall cost sensitivity from operation (fuel) costs to investment costs. However, cost minimization models for capacity expansion are frequently based on the principle that, for a perfectly adapted system allowing non-served energy, marginal remuneration allows overall operation and investments costs recovery. In addition, these models are usually formulated as finite-horizon problems when they should be theoretically solved for infinite horizons under the assumption of companies’ infinite lifespan, but infinite horizon cannot be dealt with mathematical programming since it requires finite sets. Previous approaches have tried to overcome this drawback with finite horizon models that tend asymptotically to the original infinite ones and, in many cases, the investment costs are annualized based on the plants’ lifespan, sometimes including a cost residual value. This paper proposes a novel approach with a finite horizon that guarantees the investment costs’ recovery. It is also able to obtain the marginal electricity costs of the original infinite horizon model, without the need for residual values or non-served energy. This new approach is especially suited for long-term electricity pricing with investments in renewable assets when non-served demand is banned or when no explicit capacity remuneration mechanisms are considered. |
doi_str_mv | 10.3390/su13041993 |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2489963425</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2489963425</sourcerecordid><originalsourceid>FETCH-LOGICAL-c254t-f694c7aabeb901260f5b29ee5fdcbf518cbadedc0f14424f183530fc12db1ac13</originalsourceid><addsrcrecordid>eNpNUMtKAzEUDaJgqd34BQF3wmhukpk2y1JaWygooushySSSMk1qkqm0X-_UCno35y7Oi4PQLZAHxgR5TB0wwkEIdoEGlIyhAFKSy3__NRqltCH9MQYCqgFqpt53snVHmV3wOFj8arz5kqo1eOX3JuWt8RnPQsoJ2xDxwnmXDV6G6I69YN4anaPTLh_wywn9B5a--RH0VjrsTTzcoCsr22RGvzhE74v522xZrJ-fVrPputC05LmwleB6LKUyShCgFbGlosKY0jZa2RImWsnGNJpY4JxyCxNWMmI10EaB1MCG6O7su4vhs-u715vQRd9H1pRPhKgYp2XPuj-zdAwpRWPrXXRbGQ81kPo0ZP03JPsGdxBnMA</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2489963425</pqid></control><display><type>article</type><title>Annualization of Renewable Investment Costs for Finite Horizon Electricity Pricing and Cost Recovery</title><source>Publicly Available Content Database</source><creator>Campos, Fco. Alberto ; Villar, José ; Centeno, Efraim</creator><creatorcontrib>Campos, Fco. Alberto ; Villar, José ; Centeno, Efraim</creatorcontrib><description>The increasing penetration of renewable electricity generation is complicating the bidding and estimating processes of electricity prices, partly due to the shift of the overall cost sensitivity from operation (fuel) costs to investment costs. However, cost minimization models for capacity expansion are frequently based on the principle that, for a perfectly adapted system allowing non-served energy, marginal remuneration allows overall operation and investments costs recovery. In addition, these models are usually formulated as finite-horizon problems when they should be theoretically solved for infinite horizons under the assumption of companies’ infinite lifespan, but infinite horizon cannot be dealt with mathematical programming since it requires finite sets. Previous approaches have tried to overcome this drawback with finite horizon models that tend asymptotically to the original infinite ones and, in many cases, the investment costs are annualized based on the plants’ lifespan, sometimes including a cost residual value. This paper proposes a novel approach with a finite horizon that guarantees the investment costs’ recovery. It is also able to obtain the marginal electricity costs of the original infinite horizon model, without the need for residual values or non-served energy. This new approach is especially suited for long-term electricity pricing with investments in renewable assets when non-served demand is banned or when no explicit capacity remuneration mechanisms are considered.</description><identifier>ISSN: 2071-1050</identifier><identifier>EISSN: 2071-1050</identifier><identifier>DOI: 10.3390/su13041993</identifier><language>eng</language><publisher>Basel: MDPI AG</publisher><subject>Alternative energy sources ; Cost recovery ; Costs ; Electricity ; Electricity consumption ; Electricity pricing ; Energy resources ; Guarantees ; Horizon ; Investments ; Life span ; Mathematical models ; Mathematical programming ; Prices ; Renewable resources ; Sustainability ; Variables</subject><ispartof>Sustainability, 2021-02, Vol.13 (4), p.1993</ispartof><rights>2021. This work is licensed under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c254t-f694c7aabeb901260f5b29ee5fdcbf518cbadedc0f14424f183530fc12db1ac13</cites><orcidid>0000-0001-6954-9833 ; 0000-0002-0578-1067 ; 0000-0003-0095-0543</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://www.proquest.com/docview/2489963425/fulltextPDF?pq-origsite=primo$$EPDF$$P50$$Gproquest$$Hfree_for_read</linktopdf><linktohtml>$$Uhttps://www.proquest.com/docview/2489963425?pq-origsite=primo$$EHTML$$P50$$Gproquest$$Hfree_for_read</linktohtml><link.rule.ids>314,780,784,25753,27924,27925,37012,44590,75126</link.rule.ids></links><search><creatorcontrib>Campos, Fco. Alberto</creatorcontrib><creatorcontrib>Villar, José</creatorcontrib><creatorcontrib>Centeno, Efraim</creatorcontrib><title>Annualization of Renewable Investment Costs for Finite Horizon Electricity Pricing and Cost Recovery</title><title>Sustainability</title><description>The increasing penetration of renewable electricity generation is complicating the bidding and estimating processes of electricity prices, partly due to the shift of the overall cost sensitivity from operation (fuel) costs to investment costs. However, cost minimization models for capacity expansion are frequently based on the principle that, for a perfectly adapted system allowing non-served energy, marginal remuneration allows overall operation and investments costs recovery. In addition, these models are usually formulated as finite-horizon problems when they should be theoretically solved for infinite horizons under the assumption of companies’ infinite lifespan, but infinite horizon cannot be dealt with mathematical programming since it requires finite sets. Previous approaches have tried to overcome this drawback with finite horizon models that tend asymptotically to the original infinite ones and, in many cases, the investment costs are annualized based on the plants’ lifespan, sometimes including a cost residual value. This paper proposes a novel approach with a finite horizon that guarantees the investment costs’ recovery. It is also able to obtain the marginal electricity costs of the original infinite horizon model, without the need for residual values or non-served energy. This new approach is especially suited for long-term electricity pricing with investments in renewable assets when non-served demand is banned or when no explicit capacity remuneration mechanisms are considered.</description><subject>Alternative energy sources</subject><subject>Cost recovery</subject><subject>Costs</subject><subject>Electricity</subject><subject>Electricity consumption</subject><subject>Electricity pricing</subject><subject>Energy resources</subject><subject>Guarantees</subject><subject>Horizon</subject><subject>Investments</subject><subject>Life span</subject><subject>Mathematical models</subject><subject>Mathematical programming</subject><subject>Prices</subject><subject>Renewable resources</subject><subject>Sustainability</subject><subject>Variables</subject><issn>2071-1050</issn><issn>2071-1050</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><sourceid>PIMPY</sourceid><recordid>eNpNUMtKAzEUDaJgqd34BQF3wmhukpk2y1JaWygooushySSSMk1qkqm0X-_UCno35y7Oi4PQLZAHxgR5TB0wwkEIdoEGlIyhAFKSy3__NRqltCH9MQYCqgFqpt53snVHmV3wOFj8arz5kqo1eOX3JuWt8RnPQsoJ2xDxwnmXDV6G6I69YN4anaPTLh_wywn9B5a--RH0VjrsTTzcoCsr22RGvzhE74v522xZrJ-fVrPputC05LmwleB6LKUyShCgFbGlosKY0jZa2RImWsnGNJpY4JxyCxNWMmI10EaB1MCG6O7su4vhs-u715vQRd9H1pRPhKgYp2XPuj-zdAwpRWPrXXRbGQ81kPo0ZP03JPsGdxBnMA</recordid><startdate>20210212</startdate><enddate>20210212</enddate><creator>Campos, Fco. Alberto</creator><creator>Villar, José</creator><creator>Centeno, Efraim</creator><general>MDPI AG</general><scope>AAYXX</scope><scope>CITATION</scope><scope>4U-</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope><orcidid>https://orcid.org/0000-0001-6954-9833</orcidid><orcidid>https://orcid.org/0000-0002-0578-1067</orcidid><orcidid>https://orcid.org/0000-0003-0095-0543</orcidid></search><sort><creationdate>20210212</creationdate><title>Annualization of Renewable Investment Costs for Finite Horizon Electricity Pricing and Cost Recovery</title><author>Campos, Fco. Alberto ; Villar, José ; Centeno, Efraim</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c254t-f694c7aabeb901260f5b29ee5fdcbf518cbadedc0f14424f183530fc12db1ac13</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2021</creationdate><topic>Alternative energy sources</topic><topic>Cost recovery</topic><topic>Costs</topic><topic>Electricity</topic><topic>Electricity consumption</topic><topic>Electricity pricing</topic><topic>Energy resources</topic><topic>Guarantees</topic><topic>Horizon</topic><topic>Investments</topic><topic>Life span</topic><topic>Mathematical models</topic><topic>Mathematical programming</topic><topic>Prices</topic><topic>Renewable resources</topic><topic>Sustainability</topic><topic>Variables</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Campos, Fco. Alberto</creatorcontrib><creatorcontrib>Villar, José</creatorcontrib><creatorcontrib>Centeno, Efraim</creatorcontrib><collection>CrossRef</collection><collection>University Readers</collection><collection>ProQuest Central (Alumni)</collection><collection>ProQuest Central UK/Ireland</collection><collection>ProQuest Central Essentials</collection><collection>AUTh Library subscriptions: ProQuest Central</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central</collection><collection>Publicly Available Content Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><jtitle>Sustainability</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Campos, Fco. Alberto</au><au>Villar, José</au><au>Centeno, Efraim</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Annualization of Renewable Investment Costs for Finite Horizon Electricity Pricing and Cost Recovery</atitle><jtitle>Sustainability</jtitle><date>2021-02-12</date><risdate>2021</risdate><volume>13</volume><issue>4</issue><spage>1993</spage><pages>1993-</pages><issn>2071-1050</issn><eissn>2071-1050</eissn><abstract>The increasing penetration of renewable electricity generation is complicating the bidding and estimating processes of electricity prices, partly due to the shift of the overall cost sensitivity from operation (fuel) costs to investment costs. However, cost minimization models for capacity expansion are frequently based on the principle that, for a perfectly adapted system allowing non-served energy, marginal remuneration allows overall operation and investments costs recovery. In addition, these models are usually formulated as finite-horizon problems when they should be theoretically solved for infinite horizons under the assumption of companies’ infinite lifespan, but infinite horizon cannot be dealt with mathematical programming since it requires finite sets. Previous approaches have tried to overcome this drawback with finite horizon models that tend asymptotically to the original infinite ones and, in many cases, the investment costs are annualized based on the plants’ lifespan, sometimes including a cost residual value. This paper proposes a novel approach with a finite horizon that guarantees the investment costs’ recovery. It is also able to obtain the marginal electricity costs of the original infinite horizon model, without the need for residual values or non-served energy. This new approach is especially suited for long-term electricity pricing with investments in renewable assets when non-served demand is banned or when no explicit capacity remuneration mechanisms are considered.</abstract><cop>Basel</cop><pub>MDPI AG</pub><doi>10.3390/su13041993</doi><orcidid>https://orcid.org/0000-0001-6954-9833</orcidid><orcidid>https://orcid.org/0000-0002-0578-1067</orcidid><orcidid>https://orcid.org/0000-0003-0095-0543</orcidid><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2071-1050 |
ispartof | Sustainability, 2021-02, Vol.13 (4), p.1993 |
issn | 2071-1050 2071-1050 |
language | eng |
recordid | cdi_proquest_journals_2489963425 |
source | Publicly Available Content Database |
subjects | Alternative energy sources Cost recovery Costs Electricity Electricity consumption Electricity pricing Energy resources Guarantees Horizon Investments Life span Mathematical models Mathematical programming Prices Renewable resources Sustainability Variables |
title | Annualization of Renewable Investment Costs for Finite Horizon Electricity Pricing and Cost Recovery |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T12%3A18%3A20IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Annualization%20of%20Renewable%20Investment%20Costs%20for%20Finite%20Horizon%20Electricity%20Pricing%20and%20Cost%20Recovery&rft.jtitle=Sustainability&rft.au=Campos,%20Fco.%20Alberto&rft.date=2021-02-12&rft.volume=13&rft.issue=4&rft.spage=1993&rft.pages=1993-&rft.issn=2071-1050&rft.eissn=2071-1050&rft_id=info:doi/10.3390/su13041993&rft_dat=%3Cproquest_cross%3E2489963425%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c254t-f694c7aabeb901260f5b29ee5fdcbf518cbadedc0f14424f183530fc12db1ac13%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2489963425&rft_id=info:pmid/&rfr_iscdi=true |