Loading…

Annualization of Renewable Investment Costs for Finite Horizon Electricity Pricing and Cost Recovery

The increasing penetration of renewable electricity generation is complicating the bidding and estimating processes of electricity prices, partly due to the shift of the overall cost sensitivity from operation (fuel) costs to investment costs. However, cost minimization models for capacity expansion...

Full description

Saved in:
Bibliographic Details
Published in:Sustainability 2021-02, Vol.13 (4), p.1993
Main Authors: Campos, Fco. Alberto, Villar, José, Centeno, Efraim
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites cdi_FETCH-LOGICAL-c254t-f694c7aabeb901260f5b29ee5fdcbf518cbadedc0f14424f183530fc12db1ac13
container_end_page
container_issue 4
container_start_page 1993
container_title Sustainability
container_volume 13
creator Campos, Fco. Alberto
Villar, José
Centeno, Efraim
description The increasing penetration of renewable electricity generation is complicating the bidding and estimating processes of electricity prices, partly due to the shift of the overall cost sensitivity from operation (fuel) costs to investment costs. However, cost minimization models for capacity expansion are frequently based on the principle that, for a perfectly adapted system allowing non-served energy, marginal remuneration allows overall operation and investments costs recovery. In addition, these models are usually formulated as finite-horizon problems when they should be theoretically solved for infinite horizons under the assumption of companies’ infinite lifespan, but infinite horizon cannot be dealt with mathematical programming since it requires finite sets. Previous approaches have tried to overcome this drawback with finite horizon models that tend asymptotically to the original infinite ones and, in many cases, the investment costs are annualized based on the plants’ lifespan, sometimes including a cost residual value. This paper proposes a novel approach with a finite horizon that guarantees the investment costs’ recovery. It is also able to obtain the marginal electricity costs of the original infinite horizon model, without the need for residual values or non-served energy. This new approach is especially suited for long-term electricity pricing with investments in renewable assets when non-served demand is banned or when no explicit capacity remuneration mechanisms are considered.
doi_str_mv 10.3390/su13041993
format article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2489963425</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2489963425</sourcerecordid><originalsourceid>FETCH-LOGICAL-c254t-f694c7aabeb901260f5b29ee5fdcbf518cbadedc0f14424f183530fc12db1ac13</originalsourceid><addsrcrecordid>eNpNUMtKAzEUDaJgqd34BQF3wmhukpk2y1JaWygooushySSSMk1qkqm0X-_UCno35y7Oi4PQLZAHxgR5TB0wwkEIdoEGlIyhAFKSy3__NRqltCH9MQYCqgFqpt53snVHmV3wOFj8arz5kqo1eOX3JuWt8RnPQsoJ2xDxwnmXDV6G6I69YN4anaPTLh_wywn9B5a--RH0VjrsTTzcoCsr22RGvzhE74v522xZrJ-fVrPputC05LmwleB6LKUyShCgFbGlosKY0jZa2RImWsnGNJpY4JxyCxNWMmI10EaB1MCG6O7su4vhs-u715vQRd9H1pRPhKgYp2XPuj-zdAwpRWPrXXRbGQ81kPo0ZP03JPsGdxBnMA</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2489963425</pqid></control><display><type>article</type><title>Annualization of Renewable Investment Costs for Finite Horizon Electricity Pricing and Cost Recovery</title><source>Publicly Available Content Database</source><creator>Campos, Fco. Alberto ; Villar, José ; Centeno, Efraim</creator><creatorcontrib>Campos, Fco. Alberto ; Villar, José ; Centeno, Efraim</creatorcontrib><description>The increasing penetration of renewable electricity generation is complicating the bidding and estimating processes of electricity prices, partly due to the shift of the overall cost sensitivity from operation (fuel) costs to investment costs. However, cost minimization models for capacity expansion are frequently based on the principle that, for a perfectly adapted system allowing non-served energy, marginal remuneration allows overall operation and investments costs recovery. In addition, these models are usually formulated as finite-horizon problems when they should be theoretically solved for infinite horizons under the assumption of companies’ infinite lifespan, but infinite horizon cannot be dealt with mathematical programming since it requires finite sets. Previous approaches have tried to overcome this drawback with finite horizon models that tend asymptotically to the original infinite ones and, in many cases, the investment costs are annualized based on the plants’ lifespan, sometimes including a cost residual value. This paper proposes a novel approach with a finite horizon that guarantees the investment costs’ recovery. It is also able to obtain the marginal electricity costs of the original infinite horizon model, without the need for residual values or non-served energy. This new approach is especially suited for long-term electricity pricing with investments in renewable assets when non-served demand is banned or when no explicit capacity remuneration mechanisms are considered.</description><identifier>ISSN: 2071-1050</identifier><identifier>EISSN: 2071-1050</identifier><identifier>DOI: 10.3390/su13041993</identifier><language>eng</language><publisher>Basel: MDPI AG</publisher><subject>Alternative energy sources ; Cost recovery ; Costs ; Electricity ; Electricity consumption ; Electricity pricing ; Energy resources ; Guarantees ; Horizon ; Investments ; Life span ; Mathematical models ; Mathematical programming ; Prices ; Renewable resources ; Sustainability ; Variables</subject><ispartof>Sustainability, 2021-02, Vol.13 (4), p.1993</ispartof><rights>2021. This work is licensed under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c254t-f694c7aabeb901260f5b29ee5fdcbf518cbadedc0f14424f183530fc12db1ac13</cites><orcidid>0000-0001-6954-9833 ; 0000-0002-0578-1067 ; 0000-0003-0095-0543</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://www.proquest.com/docview/2489963425/fulltextPDF?pq-origsite=primo$$EPDF$$P50$$Gproquest$$Hfree_for_read</linktopdf><linktohtml>$$Uhttps://www.proquest.com/docview/2489963425?pq-origsite=primo$$EHTML$$P50$$Gproquest$$Hfree_for_read</linktohtml><link.rule.ids>314,780,784,25753,27924,27925,37012,44590,75126</link.rule.ids></links><search><creatorcontrib>Campos, Fco. Alberto</creatorcontrib><creatorcontrib>Villar, José</creatorcontrib><creatorcontrib>Centeno, Efraim</creatorcontrib><title>Annualization of Renewable Investment Costs for Finite Horizon Electricity Pricing and Cost Recovery</title><title>Sustainability</title><description>The increasing penetration of renewable electricity generation is complicating the bidding and estimating processes of electricity prices, partly due to the shift of the overall cost sensitivity from operation (fuel) costs to investment costs. However, cost minimization models for capacity expansion are frequently based on the principle that, for a perfectly adapted system allowing non-served energy, marginal remuneration allows overall operation and investments costs recovery. In addition, these models are usually formulated as finite-horizon problems when they should be theoretically solved for infinite horizons under the assumption of companies’ infinite lifespan, but infinite horizon cannot be dealt with mathematical programming since it requires finite sets. Previous approaches have tried to overcome this drawback with finite horizon models that tend asymptotically to the original infinite ones and, in many cases, the investment costs are annualized based on the plants’ lifespan, sometimes including a cost residual value. This paper proposes a novel approach with a finite horizon that guarantees the investment costs’ recovery. It is also able to obtain the marginal electricity costs of the original infinite horizon model, without the need for residual values or non-served energy. This new approach is especially suited for long-term electricity pricing with investments in renewable assets when non-served demand is banned or when no explicit capacity remuneration mechanisms are considered.</description><subject>Alternative energy sources</subject><subject>Cost recovery</subject><subject>Costs</subject><subject>Electricity</subject><subject>Electricity consumption</subject><subject>Electricity pricing</subject><subject>Energy resources</subject><subject>Guarantees</subject><subject>Horizon</subject><subject>Investments</subject><subject>Life span</subject><subject>Mathematical models</subject><subject>Mathematical programming</subject><subject>Prices</subject><subject>Renewable resources</subject><subject>Sustainability</subject><subject>Variables</subject><issn>2071-1050</issn><issn>2071-1050</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><sourceid>PIMPY</sourceid><recordid>eNpNUMtKAzEUDaJgqd34BQF3wmhukpk2y1JaWygooushySSSMk1qkqm0X-_UCno35y7Oi4PQLZAHxgR5TB0wwkEIdoEGlIyhAFKSy3__NRqltCH9MQYCqgFqpt53snVHmV3wOFj8arz5kqo1eOX3JuWt8RnPQsoJ2xDxwnmXDV6G6I69YN4anaPTLh_wywn9B5a--RH0VjrsTTzcoCsr22RGvzhE74v522xZrJ-fVrPputC05LmwleB6LKUyShCgFbGlosKY0jZa2RImWsnGNJpY4JxyCxNWMmI10EaB1MCG6O7su4vhs-u715vQRd9H1pRPhKgYp2XPuj-zdAwpRWPrXXRbGQ81kPo0ZP03JPsGdxBnMA</recordid><startdate>20210212</startdate><enddate>20210212</enddate><creator>Campos, Fco. Alberto</creator><creator>Villar, José</creator><creator>Centeno, Efraim</creator><general>MDPI AG</general><scope>AAYXX</scope><scope>CITATION</scope><scope>4U-</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope><orcidid>https://orcid.org/0000-0001-6954-9833</orcidid><orcidid>https://orcid.org/0000-0002-0578-1067</orcidid><orcidid>https://orcid.org/0000-0003-0095-0543</orcidid></search><sort><creationdate>20210212</creationdate><title>Annualization of Renewable Investment Costs for Finite Horizon Electricity Pricing and Cost Recovery</title><author>Campos, Fco. Alberto ; Villar, José ; Centeno, Efraim</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c254t-f694c7aabeb901260f5b29ee5fdcbf518cbadedc0f14424f183530fc12db1ac13</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2021</creationdate><topic>Alternative energy sources</topic><topic>Cost recovery</topic><topic>Costs</topic><topic>Electricity</topic><topic>Electricity consumption</topic><topic>Electricity pricing</topic><topic>Energy resources</topic><topic>Guarantees</topic><topic>Horizon</topic><topic>Investments</topic><topic>Life span</topic><topic>Mathematical models</topic><topic>Mathematical programming</topic><topic>Prices</topic><topic>Renewable resources</topic><topic>Sustainability</topic><topic>Variables</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Campos, Fco. Alberto</creatorcontrib><creatorcontrib>Villar, José</creatorcontrib><creatorcontrib>Centeno, Efraim</creatorcontrib><collection>CrossRef</collection><collection>University Readers</collection><collection>ProQuest Central (Alumni)</collection><collection>ProQuest Central UK/Ireland</collection><collection>ProQuest Central Essentials</collection><collection>AUTh Library subscriptions: ProQuest Central</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central</collection><collection>Publicly Available Content Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><jtitle>Sustainability</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Campos, Fco. Alberto</au><au>Villar, José</au><au>Centeno, Efraim</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Annualization of Renewable Investment Costs for Finite Horizon Electricity Pricing and Cost Recovery</atitle><jtitle>Sustainability</jtitle><date>2021-02-12</date><risdate>2021</risdate><volume>13</volume><issue>4</issue><spage>1993</spage><pages>1993-</pages><issn>2071-1050</issn><eissn>2071-1050</eissn><abstract>The increasing penetration of renewable electricity generation is complicating the bidding and estimating processes of electricity prices, partly due to the shift of the overall cost sensitivity from operation (fuel) costs to investment costs. However, cost minimization models for capacity expansion are frequently based on the principle that, for a perfectly adapted system allowing non-served energy, marginal remuneration allows overall operation and investments costs recovery. In addition, these models are usually formulated as finite-horizon problems when they should be theoretically solved for infinite horizons under the assumption of companies’ infinite lifespan, but infinite horizon cannot be dealt with mathematical programming since it requires finite sets. Previous approaches have tried to overcome this drawback with finite horizon models that tend asymptotically to the original infinite ones and, in many cases, the investment costs are annualized based on the plants’ lifespan, sometimes including a cost residual value. This paper proposes a novel approach with a finite horizon that guarantees the investment costs’ recovery. It is also able to obtain the marginal electricity costs of the original infinite horizon model, without the need for residual values or non-served energy. This new approach is especially suited for long-term electricity pricing with investments in renewable assets when non-served demand is banned or when no explicit capacity remuneration mechanisms are considered.</abstract><cop>Basel</cop><pub>MDPI AG</pub><doi>10.3390/su13041993</doi><orcidid>https://orcid.org/0000-0001-6954-9833</orcidid><orcidid>https://orcid.org/0000-0002-0578-1067</orcidid><orcidid>https://orcid.org/0000-0003-0095-0543</orcidid><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 2071-1050
ispartof Sustainability, 2021-02, Vol.13 (4), p.1993
issn 2071-1050
2071-1050
language eng
recordid cdi_proquest_journals_2489963425
source Publicly Available Content Database
subjects Alternative energy sources
Cost recovery
Costs
Electricity
Electricity consumption
Electricity pricing
Energy resources
Guarantees
Horizon
Investments
Life span
Mathematical models
Mathematical programming
Prices
Renewable resources
Sustainability
Variables
title Annualization of Renewable Investment Costs for Finite Horizon Electricity Pricing and Cost Recovery
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T12%3A18%3A20IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Annualization%20of%20Renewable%20Investment%20Costs%20for%20Finite%20Horizon%20Electricity%20Pricing%20and%20Cost%20Recovery&rft.jtitle=Sustainability&rft.au=Campos,%20Fco.%20Alberto&rft.date=2021-02-12&rft.volume=13&rft.issue=4&rft.spage=1993&rft.pages=1993-&rft.issn=2071-1050&rft.eissn=2071-1050&rft_id=info:doi/10.3390/su13041993&rft_dat=%3Cproquest_cross%3E2489963425%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c254t-f694c7aabeb901260f5b29ee5fdcbf518cbadedc0f14424f183530fc12db1ac13%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2489963425&rft_id=info:pmid/&rfr_iscdi=true