Loading…
A parallel machine batch scheduling problem in a brewing company
This work introduces a scheduling problem which is motivated from a real situation faced by one of the largest brewing companies in Mexico. Several products must follow a brewing process which is composed by three main stages: coction, fermentation, and conditioning. In the coction stage, there are...
Saved in:
Published in: | International journal of advanced manufacturing technology 2016-10, Vol.87 (1-4), p.65-75 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c372t-5b07ce6c5744b887c7b73e175dad9ffbb8ef67398337dbe1aa162e99aa84272b3 |
---|---|
cites | cdi_FETCH-LOGICAL-c372t-5b07ce6c5744b887c7b73e175dad9ffbb8ef67398337dbe1aa162e99aa84272b3 |
container_end_page | 75 |
container_issue | 1-4 |
container_start_page | 65 |
container_title | International journal of advanced manufacturing technology |
container_volume | 87 |
creator | Sáenz-Alanís, César A. V.D., Jobish Salazar-Aguilar, M. Angélica Boyer, Vincent |
description | This work introduces a scheduling problem which is motivated from a real situation faced by one of the largest brewing companies in Mexico. Several products must follow a brewing process which is composed by three main stages: coction, fermentation, and conditioning. In the coction stage, there are multiple unrelated parallel machines, and in the fermentation and conditioning stages, there are several heterogeneous tanks. Additionally, during the production process, some maintenance operations must be scheduled. The problem can be seen as a parallel machine batch scheduling problem with sequence-dependent setup times. Due to the complex structure of the problem, we propose a Greedy Randomized Adaptive Search Procedure to generate good quality solutions in a short computation time. Computational experiments are conducted with real and artificial instances. The solutions obtained for the real instances show that the proposed algorithm reaches better solutions than the current solutions generated by the decision maker at the brewery, and the computation time required by our algorithm is dramatically shorter than the one required by the company. |
doi_str_mv | 10.1007/s00170-016-8477-8 |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2490839742</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>1880854601</sourcerecordid><originalsourceid>FETCH-LOGICAL-c372t-5b07ce6c5744b887c7b73e175dad9ffbb8ef67398337dbe1aa162e99aa84272b3</originalsourceid><addsrcrecordid>eNp9kE1LAzEQhoMoWKs_wFvAczRfm8neLMUvKHjRc0iy2XbLfpm0SP-9KevBi4WBgeF5Z4YHoVtG7xml8JAoZUAJZYpoCUD0GZoxKQQRlBXnaEa50kSA0pfoKqVtphVTeoYeF3i00bZtaHFn_abpA3Z25zc4-U2o9m3Tr_EYB9eGDjc9ttjF8H0c-qEbbX-4Rhe1bVO4-e1z9Pn89LF8Jav3l7flYkW8AL4jhaPgg_IFSOm0Bg8ORGBQVLYq69o5HWoFotRCQOUCs5YpHsrSWi05cCfm6G7am5_52oe0M9thH_t80nBZUi1KkPwkxVUuzQBOUUxrqgupKMsUmygfh5RiqM0Ym87Gg2HUHKWbSbrJLs1RutE5w6dMymy_DvHP5n9DPzPwgfM</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2262268177</pqid></control><display><type>article</type><title>A parallel machine batch scheduling problem in a brewing company</title><source>Springer Link</source><creator>Sáenz-Alanís, César A. ; V.D., Jobish ; Salazar-Aguilar, M. Angélica ; Boyer, Vincent</creator><creatorcontrib>Sáenz-Alanís, César A. ; V.D., Jobish ; Salazar-Aguilar, M. Angélica ; Boyer, Vincent</creatorcontrib><description>This work introduces a scheduling problem which is motivated from a real situation faced by one of the largest brewing companies in Mexico. Several products must follow a brewing process which is composed by three main stages: coction, fermentation, and conditioning. In the coction stage, there are multiple unrelated parallel machines, and in the fermentation and conditioning stages, there are several heterogeneous tanks. Additionally, during the production process, some maintenance operations must be scheduled. The problem can be seen as a parallel machine batch scheduling problem with sequence-dependent setup times. Due to the complex structure of the problem, we propose a Greedy Randomized Adaptive Search Procedure to generate good quality solutions in a short computation time. Computational experiments are conducted with real and artificial instances. The solutions obtained for the real instances show that the proposed algorithm reaches better solutions than the current solutions generated by the decision maker at the brewery, and the computation time required by our algorithm is dramatically shorter than the one required by the company.</description><identifier>ISSN: 0268-3768</identifier><identifier>EISSN: 1433-3015</identifier><identifier>DOI: 10.1007/s00170-016-8477-8</identifier><language>eng</language><publisher>London: Springer London</publisher><subject>Above ground tanks ; Adaptive search techniques ; Algorithms ; Brewing ; CAE) and Design ; Computation ; Computer-Aided Engineering (CAD ; Computing time ; Conditioning ; Decision making ; Engineering ; Fermentation ; Industrial and Production Engineering ; Job shops ; Mechanical Engineering ; Media Management ; Original Article ; Production scheduling ; Scheduling ; Sequential scheduling ; Setup times ; Tanks</subject><ispartof>International journal of advanced manufacturing technology, 2016-10, Vol.87 (1-4), p.65-75</ispartof><rights>Springer-Verlag London 2016</rights><rights>Copyright Springer Science & Business Media 2016</rights><rights>The International Journal of Advanced Manufacturing Technology is a copyright of Springer, (2016). All Rights Reserved.</rights><rights>Springer-Verlag London 2016.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c372t-5b07ce6c5744b887c7b73e175dad9ffbb8ef67398337dbe1aa162e99aa84272b3</citedby><cites>FETCH-LOGICAL-c372t-5b07ce6c5744b887c7b73e175dad9ffbb8ef67398337dbe1aa162e99aa84272b3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27923,27924</link.rule.ids></links><search><creatorcontrib>Sáenz-Alanís, César A.</creatorcontrib><creatorcontrib>V.D., Jobish</creatorcontrib><creatorcontrib>Salazar-Aguilar, M. Angélica</creatorcontrib><creatorcontrib>Boyer, Vincent</creatorcontrib><title>A parallel machine batch scheduling problem in a brewing company</title><title>International journal of advanced manufacturing technology</title><addtitle>Int J Adv Manuf Technol</addtitle><description>This work introduces a scheduling problem which is motivated from a real situation faced by one of the largest brewing companies in Mexico. Several products must follow a brewing process which is composed by three main stages: coction, fermentation, and conditioning. In the coction stage, there are multiple unrelated parallel machines, and in the fermentation and conditioning stages, there are several heterogeneous tanks. Additionally, during the production process, some maintenance operations must be scheduled. The problem can be seen as a parallel machine batch scheduling problem with sequence-dependent setup times. Due to the complex structure of the problem, we propose a Greedy Randomized Adaptive Search Procedure to generate good quality solutions in a short computation time. Computational experiments are conducted with real and artificial instances. The solutions obtained for the real instances show that the proposed algorithm reaches better solutions than the current solutions generated by the decision maker at the brewery, and the computation time required by our algorithm is dramatically shorter than the one required by the company.</description><subject>Above ground tanks</subject><subject>Adaptive search techniques</subject><subject>Algorithms</subject><subject>Brewing</subject><subject>CAE) and Design</subject><subject>Computation</subject><subject>Computer-Aided Engineering (CAD</subject><subject>Computing time</subject><subject>Conditioning</subject><subject>Decision making</subject><subject>Engineering</subject><subject>Fermentation</subject><subject>Industrial and Production Engineering</subject><subject>Job shops</subject><subject>Mechanical Engineering</subject><subject>Media Management</subject><subject>Original Article</subject><subject>Production scheduling</subject><subject>Scheduling</subject><subject>Sequential scheduling</subject><subject>Setup times</subject><subject>Tanks</subject><issn>0268-3768</issn><issn>1433-3015</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2016</creationdate><recordtype>article</recordtype><recordid>eNp9kE1LAzEQhoMoWKs_wFvAczRfm8neLMUvKHjRc0iy2XbLfpm0SP-9KevBi4WBgeF5Z4YHoVtG7xml8JAoZUAJZYpoCUD0GZoxKQQRlBXnaEa50kSA0pfoKqVtphVTeoYeF3i00bZtaHFn_abpA3Z25zc4-U2o9m3Tr_EYB9eGDjc9ttjF8H0c-qEbbX-4Rhe1bVO4-e1z9Pn89LF8Jav3l7flYkW8AL4jhaPgg_IFSOm0Bg8ORGBQVLYq69o5HWoFotRCQOUCs5YpHsrSWi05cCfm6G7am5_52oe0M9thH_t80nBZUi1KkPwkxVUuzQBOUUxrqgupKMsUmygfh5RiqM0Ym87Gg2HUHKWbSbrJLs1RutE5w6dMymy_DvHP5n9DPzPwgfM</recordid><startdate>20161001</startdate><enddate>20161001</enddate><creator>Sáenz-Alanís, César A.</creator><creator>V.D., Jobish</creator><creator>Salazar-Aguilar, M. Angélica</creator><creator>Boyer, Vincent</creator><general>Springer London</general><general>Springer Nature B.V</general><scope>AAYXX</scope><scope>CITATION</scope><scope>8FE</scope><scope>8FG</scope><scope>ABJCF</scope><scope>AFKRA</scope><scope>BENPR</scope><scope>BGLVJ</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>HCIFZ</scope><scope>L6V</scope><scope>M7S</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope><scope>PTHSS</scope></search><sort><creationdate>20161001</creationdate><title>A parallel machine batch scheduling problem in a brewing company</title><author>Sáenz-Alanís, César A. ; V.D., Jobish ; Salazar-Aguilar, M. Angélica ; Boyer, Vincent</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c372t-5b07ce6c5744b887c7b73e175dad9ffbb8ef67398337dbe1aa162e99aa84272b3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2016</creationdate><topic>Above ground tanks</topic><topic>Adaptive search techniques</topic><topic>Algorithms</topic><topic>Brewing</topic><topic>CAE) and Design</topic><topic>Computation</topic><topic>Computer-Aided Engineering (CAD</topic><topic>Computing time</topic><topic>Conditioning</topic><topic>Decision making</topic><topic>Engineering</topic><topic>Fermentation</topic><topic>Industrial and Production Engineering</topic><topic>Job shops</topic><topic>Mechanical Engineering</topic><topic>Media Management</topic><topic>Original Article</topic><topic>Production scheduling</topic><topic>Scheduling</topic><topic>Sequential scheduling</topic><topic>Setup times</topic><topic>Tanks</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Sáenz-Alanís, César A.</creatorcontrib><creatorcontrib>V.D., Jobish</creatorcontrib><creatorcontrib>Salazar-Aguilar, M. Angélica</creatorcontrib><creatorcontrib>Boyer, Vincent</creatorcontrib><collection>CrossRef</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>Materials Science & Engineering Collection</collection><collection>ProQuest Central</collection><collection>ProQuest Central</collection><collection>Technology Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central Korea</collection><collection>SciTech Premium Collection</collection><collection>ProQuest Engineering Collection</collection><collection>Engineering Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><collection>Engineering Collection</collection><jtitle>International journal of advanced manufacturing technology</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Sáenz-Alanís, César A.</au><au>V.D., Jobish</au><au>Salazar-Aguilar, M. Angélica</au><au>Boyer, Vincent</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A parallel machine batch scheduling problem in a brewing company</atitle><jtitle>International journal of advanced manufacturing technology</jtitle><stitle>Int J Adv Manuf Technol</stitle><date>2016-10-01</date><risdate>2016</risdate><volume>87</volume><issue>1-4</issue><spage>65</spage><epage>75</epage><pages>65-75</pages><issn>0268-3768</issn><eissn>1433-3015</eissn><abstract>This work introduces a scheduling problem which is motivated from a real situation faced by one of the largest brewing companies in Mexico. Several products must follow a brewing process which is composed by three main stages: coction, fermentation, and conditioning. In the coction stage, there are multiple unrelated parallel machines, and in the fermentation and conditioning stages, there are several heterogeneous tanks. Additionally, during the production process, some maintenance operations must be scheduled. The problem can be seen as a parallel machine batch scheduling problem with sequence-dependent setup times. Due to the complex structure of the problem, we propose a Greedy Randomized Adaptive Search Procedure to generate good quality solutions in a short computation time. Computational experiments are conducted with real and artificial instances. The solutions obtained for the real instances show that the proposed algorithm reaches better solutions than the current solutions generated by the decision maker at the brewery, and the computation time required by our algorithm is dramatically shorter than the one required by the company.</abstract><cop>London</cop><pub>Springer London</pub><doi>10.1007/s00170-016-8477-8</doi><tpages>11</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0268-3768 |
ispartof | International journal of advanced manufacturing technology, 2016-10, Vol.87 (1-4), p.65-75 |
issn | 0268-3768 1433-3015 |
language | eng |
recordid | cdi_proquest_journals_2490839742 |
source | Springer Link |
subjects | Above ground tanks Adaptive search techniques Algorithms Brewing CAE) and Design Computation Computer-Aided Engineering (CAD Computing time Conditioning Decision making Engineering Fermentation Industrial and Production Engineering Job shops Mechanical Engineering Media Management Original Article Production scheduling Scheduling Sequential scheduling Setup times Tanks |
title | A parallel machine batch scheduling problem in a brewing company |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-11T08%3A40%3A43IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20parallel%20machine%20batch%20scheduling%20problem%20in%20a%20brewing%20company&rft.jtitle=International%20journal%20of%20advanced%20manufacturing%20technology&rft.au=S%C3%A1enz-Alan%C3%ADs,%20C%C3%A9sar%20A.&rft.date=2016-10-01&rft.volume=87&rft.issue=1-4&rft.spage=65&rft.epage=75&rft.pages=65-75&rft.issn=0268-3768&rft.eissn=1433-3015&rft_id=info:doi/10.1007/s00170-016-8477-8&rft_dat=%3Cproquest_cross%3E1880854601%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c372t-5b07ce6c5744b887c7b73e175dad9ffbb8ef67398337dbe1aa162e99aa84272b3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2262268177&rft_id=info:pmid/&rfr_iscdi=true |