Evaluation of “X2” delination well drilling project block on oil service company
Project is an activity or business that is temporary and has a certain period of time, unique and produces a product, service or both. Achieving project activity right on the schedule was an important thing for project owners or contractors. However, the schedule of the "X2" Well Drilling...
Saved in:
Published in: | Journal of physics. Conference series 2021-03, Vol.1839 (1), p.12003 |
---|---|
Main Authors: | , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | cdi_FETCH-LOGICAL-c2433-f3c7e1fd7ccefe250bdf0a40e9301dcbb623bd89d5f0457ae7bf7f58959ef5553 |
container_end_page | |
container_issue | 1 |
container_start_page | 12003 |
container_title | Journal of physics. Conference series |
container_volume | 1839 |
creator | Sardjono, W Lahlianti, RC Hobri Tohir, M Mukhlis, M |
description | Project is an activity or business that is temporary and has a certain period of time, unique and produces a product, service or both. Achieving project activity right on the schedule was an important thing for project owners or contractors. However, the schedule of the "X2" Well Drilling Project has delayed from the original plan due to several inhibiting factors. Therefore, the cost’s project increased during project implementation. The factor analysis method is used to reduce the number of independent variables until new variables are found which are then examined for their relationship and a mathematical model is built using the regression analysis method. The location of this research was one company with 100 valid respondents. The results of this study indicate that there are 3 (three) new factors that have a positive effect and 1 (one) new factors that have a negative effect on the condition of the differences that occur. If a project can be completed before the work period ends, at other times if the owner wants to build a construction project again, there is no doubt that the owner will re-choose Oil Service Company to work on another Drilling Project. |
doi_str_mv | 10.1088/1742-6596/1839/1/012003 |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2512916272</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2512916272</sourcerecordid><originalsourceid>FETCH-LOGICAL-c2433-f3c7e1fd7ccefe250bdf0a40e9301dcbb623bd89d5f0457ae7bf7f58959ef5553</originalsourceid><addsrcrecordid>eNo9kMlOwzAQhi0EEqXwDFjiHOIljp0jqsoiVeJSJG6W4wUluHGx26Le-iDwcn0SEgV1LjP6559FHwC3GN1jJESOeUGyklVljgWtcpwjTBCiZ2By6pyfaiEuwVVKbW_og0_Acr5Tfqs2TehgcPB4-Hknx8MvNNY33Sh_W--hiY3vlQ-4jqG1egNrH_QnHKYaD5ONu0ZbqMNqrbr9Nbhwyid785-n4O1xvpw9Z4vXp5fZwyLTpKA0c1Rzi53hWltnCUO1cUgVyFYUYaPruiS0NqIyzKGCcWV57bhjomKVdYwxOgV3497-qa-tTRvZhm3s-pOSMEwqXBJOehcfXTqGlKJ1ch2blYp7iZEcEMoBjhxAyQGhxHJESP8A7shm7w</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2512916272</pqid></control><display><type>article</type><title>Evaluation of “X2” delination well drilling project block on oil service company</title><source>ProQuest - Publicly Available Content Database</source><source>Free Full-Text Journals in Chemistry</source><creator>Sardjono, W ; Lahlianti, RC ; Hobri ; Tohir, M ; Mukhlis, M</creator><creatorcontrib>Sardjono, W ; Lahlianti, RC ; Hobri ; Tohir, M ; Mukhlis, M</creatorcontrib><description>Project is an activity or business that is temporary and has a certain period of time, unique and produces a product, service or both. Achieving project activity right on the schedule was an important thing for project owners or contractors. However, the schedule of the "X2" Well Drilling Project has delayed from the original plan due to several inhibiting factors. Therefore, the cost’s project increased during project implementation. The factor analysis method is used to reduce the number of independent variables until new variables are found which are then examined for their relationship and a mathematical model is built using the regression analysis method. The location of this research was one company with 100 valid respondents. The results of this study indicate that there are 3 (three) new factors that have a positive effect and 1 (one) new factors that have a negative effect on the condition of the differences that occur. If a project can be completed before the work period ends, at other times if the owner wants to build a construction project again, there is no doubt that the owner will re-choose Oil Service Company to work on another Drilling Project.</description><identifier>ISSN: 1742-6588</identifier><identifier>EISSN: 1742-6596</identifier><identifier>DOI: 10.1088/1742-6596/1839/1/012003</identifier><language>eng</language><publisher>Bristol: IOP Publishing</publisher><subject>Contractors ; Cost analysis ; Factor analysis ; Independent variables ; Physics ; Regression analysis ; Schedules ; Well drilling</subject><ispartof>Journal of physics. Conference series, 2021-03, Vol.1839 (1), p.12003</ispartof><rights>2021. This work is published under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c2433-f3c7e1fd7ccefe250bdf0a40e9301dcbb623bd89d5f0457ae7bf7f58959ef5553</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.proquest.com/docview/2512916272?pq-origsite=primo$$EHTML$$P50$$Gproquest$$Hfree_for_read</linktohtml><link.rule.ids>314,780,784,25753,27924,27925,37012,44590</link.rule.ids></links><search><creatorcontrib>Sardjono, W</creatorcontrib><creatorcontrib>Lahlianti, RC</creatorcontrib><creatorcontrib>Hobri</creatorcontrib><creatorcontrib>Tohir, M</creatorcontrib><creatorcontrib>Mukhlis, M</creatorcontrib><title>Evaluation of “X2” delination well drilling project block on oil service company</title><title>Journal of physics. Conference series</title><description>Project is an activity or business that is temporary and has a certain period of time, unique and produces a product, service or both. Achieving project activity right on the schedule was an important thing for project owners or contractors. However, the schedule of the "X2" Well Drilling Project has delayed from the original plan due to several inhibiting factors. Therefore, the cost’s project increased during project implementation. The factor analysis method is used to reduce the number of independent variables until new variables are found which are then examined for their relationship and a mathematical model is built using the regression analysis method. The location of this research was one company with 100 valid respondents. The results of this study indicate that there are 3 (three) new factors that have a positive effect and 1 (one) new factors that have a negative effect on the condition of the differences that occur. If a project can be completed before the work period ends, at other times if the owner wants to build a construction project again, there is no doubt that the owner will re-choose Oil Service Company to work on another Drilling Project.</description><subject>Contractors</subject><subject>Cost analysis</subject><subject>Factor analysis</subject><subject>Independent variables</subject><subject>Physics</subject><subject>Regression analysis</subject><subject>Schedules</subject><subject>Well drilling</subject><issn>1742-6588</issn><issn>1742-6596</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><sourceid>PIMPY</sourceid><recordid>eNo9kMlOwzAQhi0EEqXwDFjiHOIljp0jqsoiVeJSJG6W4wUluHGx26Le-iDwcn0SEgV1LjP6559FHwC3GN1jJESOeUGyklVljgWtcpwjTBCiZ2By6pyfaiEuwVVKbW_og0_Acr5Tfqs2TehgcPB4-Hknx8MvNNY33Sh_W--hiY3vlQ-4jqG1egNrH_QnHKYaD5ONu0ZbqMNqrbr9Nbhwyid785-n4O1xvpw9Z4vXp5fZwyLTpKA0c1Rzi53hWltnCUO1cUgVyFYUYaPruiS0NqIyzKGCcWV57bhjomKVdYwxOgV3497-qa-tTRvZhm3s-pOSMEwqXBJOehcfXTqGlKJ1ch2blYp7iZEcEMoBjhxAyQGhxHJESP8A7shm7w</recordid><startdate>20210301</startdate><enddate>20210301</enddate><creator>Sardjono, W</creator><creator>Lahlianti, RC</creator><creator>Hobri</creator><creator>Tohir, M</creator><creator>Mukhlis, M</creator><general>IOP Publishing</general><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>8FE</scope><scope>8FG</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>ARAPS</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BGLVJ</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>H8D</scope><scope>HCIFZ</scope><scope>L7M</scope><scope>P5Z</scope><scope>P62</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope></search><sort><creationdate>20210301</creationdate><title>Evaluation of “X2” delination well drilling project block on oil service company</title><author>Sardjono, W ; Lahlianti, RC ; Hobri ; Tohir, M ; Mukhlis, M</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c2433-f3c7e1fd7ccefe250bdf0a40e9301dcbb623bd89d5f0457ae7bf7f58959ef5553</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2021</creationdate><topic>Contractors</topic><topic>Cost analysis</topic><topic>Factor analysis</topic><topic>Independent variables</topic><topic>Physics</topic><topic>Regression analysis</topic><topic>Schedules</topic><topic>Well drilling</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Sardjono, W</creatorcontrib><creatorcontrib>Lahlianti, RC</creatorcontrib><creatorcontrib>Hobri</creatorcontrib><creatorcontrib>Tohir, M</creatorcontrib><creatorcontrib>Mukhlis, M</creatorcontrib><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>ProQuest Central (Alumni)</collection><collection>ProQuest Central</collection><collection>Advanced Technologies & Aerospace Collection</collection><collection>ProQuest Central Essentials</collection><collection>AUTh Library subscriptions: ProQuest Central</collection><collection>Technology Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central</collection><collection>Aerospace Database</collection><collection>SciTech Premium Collection</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>ProQuest advanced technologies & aerospace journals</collection><collection>ProQuest Advanced Technologies & Aerospace Collection</collection><collection>ProQuest - Publicly Available Content Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><jtitle>Journal of physics. Conference series</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Sardjono, W</au><au>Lahlianti, RC</au><au>Hobri</au><au>Tohir, M</au><au>Mukhlis, M</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Evaluation of “X2” delination well drilling project block on oil service company</atitle><jtitle>Journal of physics. Conference series</jtitle><date>2021-03-01</date><risdate>2021</risdate><volume>1839</volume><issue>1</issue><spage>12003</spage><pages>12003-</pages><issn>1742-6588</issn><eissn>1742-6596</eissn><abstract>Project is an activity or business that is temporary and has a certain period of time, unique and produces a product, service or both. Achieving project activity right on the schedule was an important thing for project owners or contractors. However, the schedule of the "X2" Well Drilling Project has delayed from the original plan due to several inhibiting factors. Therefore, the cost’s project increased during project implementation. The factor analysis method is used to reduce the number of independent variables until new variables are found which are then examined for their relationship and a mathematical model is built using the regression analysis method. The location of this research was one company with 100 valid respondents. The results of this study indicate that there are 3 (three) new factors that have a positive effect and 1 (one) new factors that have a negative effect on the condition of the differences that occur. If a project can be completed before the work period ends, at other times if the owner wants to build a construction project again, there is no doubt that the owner will re-choose Oil Service Company to work on another Drilling Project.</abstract><cop>Bristol</cop><pub>IOP Publishing</pub><doi>10.1088/1742-6596/1839/1/012003</doi><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1742-6588 |
ispartof | Journal of physics. Conference series, 2021-03, Vol.1839 (1), p.12003 |
issn | 1742-6588 1742-6596 |
language | eng |
recordid | cdi_proquest_journals_2512916272 |
source | ProQuest - Publicly Available Content Database; Free Full-Text Journals in Chemistry |
subjects | Contractors Cost analysis Factor analysis Independent variables Physics Regression analysis Schedules Well drilling |
title | Evaluation of “X2” delination well drilling project block on oil service company |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T08%3A00%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Evaluation%20of%20%E2%80%9CX2%E2%80%9D%20delination%20well%20drilling%20project%20block%20on%20oil%20service%20company&rft.jtitle=Journal%20of%20physics.%20Conference%20series&rft.au=Sardjono,%20W&rft.date=2021-03-01&rft.volume=1839&rft.issue=1&rft.spage=12003&rft.pages=12003-&rft.issn=1742-6588&rft.eissn=1742-6596&rft_id=info:doi/10.1088/1742-6596/1839/1/012003&rft_dat=%3Cproquest_cross%3E2512916272%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c2433-f3c7e1fd7ccefe250bdf0a40e9301dcbb623bd89d5f0457ae7bf7f58959ef5553%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2512916272&rft_id=info:pmid/&rfr_iscdi=true |