Loading…
Identifying and prioritizing delay factors in Iran’s oil construction projects
Purpose Successful implementation of construction projects is one of the crucial factors for the economic development of every country. The main part of the countries’ capital is allocated to civil and infrastructure projects annually, most of which are accomplished with delay. Construction projects...
Saved in:
Published in: | International journal of energy sector management 2021-05, Vol.15 (3), p.476-495 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c410t-2a179b3afe212ffe659052ca8c304e8cbad1d16512dd9a7c3b10bd6c8fc925793 |
---|---|
cites | cdi_FETCH-LOGICAL-c410t-2a179b3afe212ffe659052ca8c304e8cbad1d16512dd9a7c3b10bd6c8fc925793 |
container_end_page | 495 |
container_issue | 3 |
container_start_page | 476 |
container_title | International journal of energy sector management |
container_volume | 15 |
creator | Kazemi, Aliyeh Kim, Eun-Seok Kazemi, Mohammad-Hossein |
description | Purpose
Successful implementation of construction projects is one of the crucial factors for the economic development of every country. The main part of the countries’ capital is allocated to civil and infrastructure projects annually, most of which are accomplished with delay. Construction projects are often criticized for overrunning time and budgets. Analyzing the factors causing delay is essential for omitting them and timely implementation of these projects. Due to the importance of oil projects, this study aims to investigate and analyze the factors causing a delay in Iran’s oil construction projects.
Design/methodology/approach
In this research, after a broad literature review, using the fuzzy Delphi method, a total of 75 delay factors were identified under 11 major categories of owner, contractor, consultant, equipment, labor, materials, design, contract and contractual relations, laws and regulations, environmental factors, and managerial factors. Then, by using the best-worst method, the factors were prioritized.
Findings
The results showed that sanction, governmental management systems, weak project management by the contractor, technical and managerial weaknesses of the consultant, financial problems and delay in payment by the owner, low efficiency of the equipment, low productivity of the workforce, changes in laws and regulations, inappropriate organizational structure linking to the project, changes in the design, and changes in the price of materials are the most crucial factors causing a delay in Iran’s oil construction projects.
Research limitations/implications
These findings are expected to have significant contributions to Iran’s oil construction industry in controlling the time overruns in construction contracts.
Originality/value
The main contribution of this study is to develop a comprehensive framework in which, causes of delay in Iran’s oil construction projects are addressed and prioritized. |
doi_str_mv | 10.1108/IJESM-04-2020-0006 |
format | article |
fullrecord | <record><control><sourceid>proquest_emera</sourceid><recordid>TN_cdi_proquest_journals_2526827128</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2526827128</sourcerecordid><originalsourceid>FETCH-LOGICAL-c410t-2a179b3afe212ffe659052ca8c304e8cbad1d16512dd9a7c3b10bd6c8fc925793</originalsourceid><addsrcrecordid>eNptkEtKBDEQhoMoOI5ewFWD69ZK9Su9lMFHy4iCug7pPCRDT6JJZjGuvIbX8yT2OCIIrqoo_q-K-gg5pnBKKbCz7ubi4TaHMkdAyAGg3iET2lSQ11i0u789wj45iHExBljZsAm575R2yZq1dc-ZcCp7CdYHm-zbZqD0INaZETL5EDPrsi4I9_n-ETNvh0x6F1NYyWS9Gzm_0DLFQ7JnxBD10U-dkqfLi8fZdT6_u-pm5_NclhRSjoI2bV8Io5GiMbquWqhQCiYLKDWTvVBU0bqiqFQrGln0FHpVS2Zki1XTFlNyst07Hn5d6Zj4wq-CG09yrLBm2FBkYwq3KRl8jEEbPv63FGHNKfCNOf5tjkPJN-b4xtwI0S2klzqIQf3P_LFdfAGJ2nH5</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2526827128</pqid></control><display><type>article</type><title>Identifying and prioritizing delay factors in Iran’s oil construction projects</title><source>ABI/INFORM Global (ProQuest)</source><source>Emerald:Jisc Collections:Emerald Subject Collections HE and FE 2024-2026:Emerald Premier (reading list)</source><creator>Kazemi, Aliyeh ; Kim, Eun-Seok ; Kazemi, Mohammad-Hossein</creator><creatorcontrib>Kazemi, Aliyeh ; Kim, Eun-Seok ; Kazemi, Mohammad-Hossein</creatorcontrib><description>Purpose
Successful implementation of construction projects is one of the crucial factors for the economic development of every country. The main part of the countries’ capital is allocated to civil and infrastructure projects annually, most of which are accomplished with delay. Construction projects are often criticized for overrunning time and budgets. Analyzing the factors causing delay is essential for omitting them and timely implementation of these projects. Due to the importance of oil projects, this study aims to investigate and analyze the factors causing a delay in Iran’s oil construction projects.
Design/methodology/approach
In this research, after a broad literature review, using the fuzzy Delphi method, a total of 75 delay factors were identified under 11 major categories of owner, contractor, consultant, equipment, labor, materials, design, contract and contractual relations, laws and regulations, environmental factors, and managerial factors. Then, by using the best-worst method, the factors were prioritized.
Findings
The results showed that sanction, governmental management systems, weak project management by the contractor, technical and managerial weaknesses of the consultant, financial problems and delay in payment by the owner, low efficiency of the equipment, low productivity of the workforce, changes in laws and regulations, inappropriate organizational structure linking to the project, changes in the design, and changes in the price of materials are the most crucial factors causing a delay in Iran’s oil construction projects.
Research limitations/implications
These findings are expected to have significant contributions to Iran’s oil construction industry in controlling the time overruns in construction contracts.
Originality/value
The main contribution of this study is to develop a comprehensive framework in which, causes of delay in Iran’s oil construction projects are addressed and prioritized.</description><identifier>ISSN: 1750-6220</identifier><identifier>EISSN: 1750-6239</identifier><identifier>DOI: 10.1108/IJESM-04-2020-0006</identifier><language>eng</language><publisher>Bradford: Emerald Publishing Limited</publisher><subject>Civil engineering ; Construction contracts ; Construction industry ; Contractors ; Delay ; Delphi method ; Design ; Economic development ; Environmental factors ; Highway construction ; Literature reviews ; Management systems ; Oil ; Organizational structure ; Planning ; Project engineering ; Project management ; Questionnaires ; Regulations</subject><ispartof>International journal of energy sector management, 2021-05, Vol.15 (3), p.476-495</ispartof><rights>Emerald Publishing Limited</rights><rights>Emerald Publishing Limited 2020</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c410t-2a179b3afe212ffe659052ca8c304e8cbad1d16512dd9a7c3b10bd6c8fc925793</citedby><cites>FETCH-LOGICAL-c410t-2a179b3afe212ffe659052ca8c304e8cbad1d16512dd9a7c3b10bd6c8fc925793</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://www.proquest.com/docview/2526827128/fulltextPDF?pq-origsite=primo$$EPDF$$P50$$Gproquest$$H</linktopdf><linktohtml>$$Uhttps://www.proquest.com/docview/2526827128?pq-origsite=primo$$EHTML$$P50$$Gproquest$$H</linktohtml><link.rule.ids>314,780,784,11688,27924,27925,36060,44363,74895</link.rule.ids></links><search><creatorcontrib>Kazemi, Aliyeh</creatorcontrib><creatorcontrib>Kim, Eun-Seok</creatorcontrib><creatorcontrib>Kazemi, Mohammad-Hossein</creatorcontrib><title>Identifying and prioritizing delay factors in Iran’s oil construction projects</title><title>International journal of energy sector management</title><description>Purpose
Successful implementation of construction projects is one of the crucial factors for the economic development of every country. The main part of the countries’ capital is allocated to civil and infrastructure projects annually, most of which are accomplished with delay. Construction projects are often criticized for overrunning time and budgets. Analyzing the factors causing delay is essential for omitting them and timely implementation of these projects. Due to the importance of oil projects, this study aims to investigate and analyze the factors causing a delay in Iran’s oil construction projects.
Design/methodology/approach
In this research, after a broad literature review, using the fuzzy Delphi method, a total of 75 delay factors were identified under 11 major categories of owner, contractor, consultant, equipment, labor, materials, design, contract and contractual relations, laws and regulations, environmental factors, and managerial factors. Then, by using the best-worst method, the factors were prioritized.
Findings
The results showed that sanction, governmental management systems, weak project management by the contractor, technical and managerial weaknesses of the consultant, financial problems and delay in payment by the owner, low efficiency of the equipment, low productivity of the workforce, changes in laws and regulations, inappropriate organizational structure linking to the project, changes in the design, and changes in the price of materials are the most crucial factors causing a delay in Iran’s oil construction projects.
Research limitations/implications
These findings are expected to have significant contributions to Iran’s oil construction industry in controlling the time overruns in construction contracts.
Originality/value
The main contribution of this study is to develop a comprehensive framework in which, causes of delay in Iran’s oil construction projects are addressed and prioritized.</description><subject>Civil engineering</subject><subject>Construction contracts</subject><subject>Construction industry</subject><subject>Contractors</subject><subject>Delay</subject><subject>Delphi method</subject><subject>Design</subject><subject>Economic development</subject><subject>Environmental factors</subject><subject>Highway construction</subject><subject>Literature reviews</subject><subject>Management systems</subject><subject>Oil</subject><subject>Organizational structure</subject><subject>Planning</subject><subject>Project engineering</subject><subject>Project management</subject><subject>Questionnaires</subject><subject>Regulations</subject><issn>1750-6220</issn><issn>1750-6239</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><sourceid>M0C</sourceid><recordid>eNptkEtKBDEQhoMoOI5ewFWD69ZK9Su9lMFHy4iCug7pPCRDT6JJZjGuvIbX8yT2OCIIrqoo_q-K-gg5pnBKKbCz7ubi4TaHMkdAyAGg3iET2lSQ11i0u789wj45iHExBljZsAm575R2yZq1dc-ZcCp7CdYHm-zbZqD0INaZETL5EDPrsi4I9_n-ETNvh0x6F1NYyWS9Gzm_0DLFQ7JnxBD10U-dkqfLi8fZdT6_u-pm5_NclhRSjoI2bV8Io5GiMbquWqhQCiYLKDWTvVBU0bqiqFQrGln0FHpVS2Zki1XTFlNyst07Hn5d6Zj4wq-CG09yrLBm2FBkYwq3KRl8jEEbPv63FGHNKfCNOf5tjkPJN-b4xtwI0S2klzqIQf3P_LFdfAGJ2nH5</recordid><startdate>20210512</startdate><enddate>20210512</enddate><creator>Kazemi, Aliyeh</creator><creator>Kim, Eun-Seok</creator><creator>Kazemi, Mohammad-Hossein</creator><general>Emerald Publishing Limited</general><general>Emerald Group Publishing Limited</general><scope>AAYXX</scope><scope>CITATION</scope><scope>0U~</scope><scope>1-H</scope><scope>7WY</scope><scope>7WZ</scope><scope>7XB</scope><scope>8AF</scope><scope>8FE</scope><scope>8FG</scope><scope>ABJCF</scope><scope>AFKRA</scope><scope>ATCPS</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BEZIV</scope><scope>BGLVJ</scope><scope>BHPHI</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>F~G</scope><scope>GNUQQ</scope><scope>GUQSH</scope><scope>HCIFZ</scope><scope>K6~</scope><scope>L.-</scope><scope>L.0</scope><scope>L6V</scope><scope>M0C</scope><scope>M1Q</scope><scope>M2O</scope><scope>M2P</scope><scope>M7S</scope><scope>MBDVC</scope><scope>PATMY</scope><scope>PQBIZ</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PTHSS</scope><scope>PYCSY</scope><scope>Q9U</scope></search><sort><creationdate>20210512</creationdate><title>Identifying and prioritizing delay factors in Iran’s oil construction projects</title><author>Kazemi, Aliyeh ; Kim, Eun-Seok ; Kazemi, Mohammad-Hossein</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c410t-2a179b3afe212ffe659052ca8c304e8cbad1d16512dd9a7c3b10bd6c8fc925793</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2021</creationdate><topic>Civil engineering</topic><topic>Construction contracts</topic><topic>Construction industry</topic><topic>Contractors</topic><topic>Delay</topic><topic>Delphi method</topic><topic>Design</topic><topic>Economic development</topic><topic>Environmental factors</topic><topic>Highway construction</topic><topic>Literature reviews</topic><topic>Management systems</topic><topic>Oil</topic><topic>Organizational structure</topic><topic>Planning</topic><topic>Project engineering</topic><topic>Project management</topic><topic>Questionnaires</topic><topic>Regulations</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Kazemi, Aliyeh</creatorcontrib><creatorcontrib>Kim, Eun-Seok</creatorcontrib><creatorcontrib>Kazemi, Mohammad-Hossein</creatorcontrib><collection>CrossRef</collection><collection>Global News & ABI/Inform Professional</collection><collection>Trade PRO</collection><collection>ProQuest_ABI/INFORM Collection</collection><collection>ABI/INFORM Global (PDF only)</collection><collection>ProQuest Central (purchase pre-March 2016)</collection><collection>STEM Database</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>Materials Science & Engineering Collection</collection><collection>ProQuest Central</collection><collection>Agricultural & Environmental Science Collection</collection><collection>ProQuest Central Essentials</collection><collection>AUTh Library subscriptions: ProQuest Central</collection><collection>ProQuest Business Premium Collection</collection><collection>Technology Collection</collection><collection>ProQuest Natural Science Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central</collection><collection>ABI/INFORM Global (Corporate)</collection><collection>ProQuest Central Student</collection><collection>Research Library Prep</collection><collection>SciTech Premium Collection</collection><collection>ProQuest Business Collection</collection><collection>ABI/INFORM Professional Advanced</collection><collection>ABI/INFORM Professional Standard</collection><collection>ProQuest Engineering Collection</collection><collection>ABI/INFORM Global (ProQuest)</collection><collection>ProQuest Military Collection</collection><collection>ProQuest_Research Library</collection><collection>ProQuest Science Journals</collection><collection>Engineering Database</collection><collection>Research Library (Corporate)</collection><collection>Environmental Science Database</collection><collection>ProQuest One Business</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>Engineering collection</collection><collection>Environmental Science Collection</collection><collection>ProQuest Central Basic</collection><jtitle>International journal of energy sector management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Kazemi, Aliyeh</au><au>Kim, Eun-Seok</au><au>Kazemi, Mohammad-Hossein</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Identifying and prioritizing delay factors in Iran’s oil construction projects</atitle><jtitle>International journal of energy sector management</jtitle><date>2021-05-12</date><risdate>2021</risdate><volume>15</volume><issue>3</issue><spage>476</spage><epage>495</epage><pages>476-495</pages><issn>1750-6220</issn><eissn>1750-6239</eissn><abstract>Purpose
Successful implementation of construction projects is one of the crucial factors for the economic development of every country. The main part of the countries’ capital is allocated to civil and infrastructure projects annually, most of which are accomplished with delay. Construction projects are often criticized for overrunning time and budgets. Analyzing the factors causing delay is essential for omitting them and timely implementation of these projects. Due to the importance of oil projects, this study aims to investigate and analyze the factors causing a delay in Iran’s oil construction projects.
Design/methodology/approach
In this research, after a broad literature review, using the fuzzy Delphi method, a total of 75 delay factors were identified under 11 major categories of owner, contractor, consultant, equipment, labor, materials, design, contract and contractual relations, laws and regulations, environmental factors, and managerial factors. Then, by using the best-worst method, the factors were prioritized.
Findings
The results showed that sanction, governmental management systems, weak project management by the contractor, technical and managerial weaknesses of the consultant, financial problems and delay in payment by the owner, low efficiency of the equipment, low productivity of the workforce, changes in laws and regulations, inappropriate organizational structure linking to the project, changes in the design, and changes in the price of materials are the most crucial factors causing a delay in Iran’s oil construction projects.
Research limitations/implications
These findings are expected to have significant contributions to Iran’s oil construction industry in controlling the time overruns in construction contracts.
Originality/value
The main contribution of this study is to develop a comprehensive framework in which, causes of delay in Iran’s oil construction projects are addressed and prioritized.</abstract><cop>Bradford</cop><pub>Emerald Publishing Limited</pub><doi>10.1108/IJESM-04-2020-0006</doi><tpages>20</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1750-6220 |
ispartof | International journal of energy sector management, 2021-05, Vol.15 (3), p.476-495 |
issn | 1750-6220 1750-6239 |
language | eng |
recordid | cdi_proquest_journals_2526827128 |
source | ABI/INFORM Global (ProQuest); Emerald:Jisc Collections:Emerald Subject Collections HE and FE 2024-2026:Emerald Premier (reading list) |
subjects | Civil engineering Construction contracts Construction industry Contractors Delay Delphi method Design Economic development Environmental factors Highway construction Literature reviews Management systems Oil Organizational structure Planning Project engineering Project management Questionnaires Regulations |
title | Identifying and prioritizing delay factors in Iran’s oil construction projects |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-02T10%3A15%3A03IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_emera&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Identifying%20and%20prioritizing%20delay%20factors%20in%20Iran%E2%80%99s%20oil%20construction%20projects&rft.jtitle=International%20journal%20of%20energy%20sector%20management&rft.au=Kazemi,%20Aliyeh&rft.date=2021-05-12&rft.volume=15&rft.issue=3&rft.spage=476&rft.epage=495&rft.pages=476-495&rft.issn=1750-6220&rft.eissn=1750-6239&rft_id=info:doi/10.1108/IJESM-04-2020-0006&rft_dat=%3Cproquest_emera%3E2526827128%3C/proquest_emera%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c410t-2a179b3afe212ffe659052ca8c304e8cbad1d16512dd9a7c3b10bd6c8fc925793%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2526827128&rft_id=info:pmid/&rfr_iscdi=true |