Reengineering of organizational and technological processes of NPP construction

Nuclear power construction is characterized by high capital costs, a significant number of participants in the design and construction processes. One of the most significant factors of the efficiency of NPP projects implementation is the adopted technology for the construction. An analysis of the So...

Full description

Saved in:
Bibliographic Details
Published in:Journal of physics. Conference series 2021-04, Vol.1889 (2), p.22104
Main Authors: Voronkov, I E, Usmanov, T A
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites cdi_FETCH-LOGICAL-c2484-f21f3910fff3b71d3f3d47c0d9ac7a65dd3519e45ab33ddf00d7bd94953d509a3
container_end_page
container_issue 2
container_start_page 22104
container_title Journal of physics. Conference series
container_volume 1889
creator Voronkov, I E
Usmanov, T A
description Nuclear power construction is characterized by high capital costs, a significant number of participants in the design and construction processes. One of the most significant factors of the efficiency of NPP projects implementation is the adopted technology for the construction. An analysis of the Soviet and modern experience in the NPPs construction allows to assert that the piece reinforcing application leads to an increase in the project implementation time. The technology of large-block assembling of NPP structures and equipment have been widely used by the world leaders in NPPs construction, but the implementation of this technology required significant costs for the organization of the necessary infrastructure. In the context of the rapid development of computing systems, instrumentation and mechanical engineering, it is proposed to fundamentally rethink the processes of NPP construction. It is proposed to return to the technologies of large-block installation of NPP structures by switching from rail lifting mechanisms to pneumatic wheels, by robotizing the processes of enlargement and installation of structures and equipment. The functions of managing and making organizational and technological decisions can be partially transferred to a specially developed neural network that has access to an array of data on previously implemented projects. This approach allows us to consider the NPP construction project as a cyber-physical system and opens the way to a whole range of areas of fundamental and applied research in the field of technology, organization and management of the construction of NPP.
doi_str_mv 10.1088/1742-6596/1889/2/022104
format article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2528497349</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2528497349</sourcerecordid><originalsourceid>FETCH-LOGICAL-c2484-f21f3910fff3b71d3f3d47c0d9ac7a65dd3519e45ab33ddf00d7bd94953d509a3</originalsourceid><addsrcrecordid>eNo9kFtLxDAQhYMouK7-Bgs-1-baJI-yqCss7iL6HNJcapearEn3QX-9LZWdlxlmzhwOHwC3CN4jKESFOMVlzWRdISFkhSuIMYL0DCxOl_PTLMQluMp5DyEZiy_A9s250HbBudSFtoi-iKnVofvVQxeD7gsdbDE48xliH9vOjJtDisbl7PKkft3tChNDHtLRTB_X4MLrPrub_74EH0-P76t1udk-v6weNqXBVNDSY-SJRNB7TxqOLPHEUm6gldpwXTNrCUPSUaYbQqz1EFreWEklI5ZBqckS3M2-Y5rvo8uD2sdjGgNnhRkWVHJC5ajis8qkmHNyXh1S96XTj0JQTfTUxEVNjNRET2E10yN_UlpjrA</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2528497349</pqid></control><display><type>article</type><title>Reengineering of organizational and technological processes of NPP construction</title><source>Publicly Available Content Database</source><source>Free Full-Text Journals in Chemistry</source><creator>Voronkov, I E ; Usmanov, T A</creator><creatorcontrib>Voronkov, I E ; Usmanov, T A</creatorcontrib><description>Nuclear power construction is characterized by high capital costs, a significant number of participants in the design and construction processes. One of the most significant factors of the efficiency of NPP projects implementation is the adopted technology for the construction. An analysis of the Soviet and modern experience in the NPPs construction allows to assert that the piece reinforcing application leads to an increase in the project implementation time. The technology of large-block assembling of NPP structures and equipment have been widely used by the world leaders in NPPs construction, but the implementation of this technology required significant costs for the organization of the necessary infrastructure. In the context of the rapid development of computing systems, instrumentation and mechanical engineering, it is proposed to fundamentally rethink the processes of NPP construction. It is proposed to return to the technologies of large-block installation of NPP structures by switching from rail lifting mechanisms to pneumatic wheels, by robotizing the processes of enlargement and installation of structures and equipment. The functions of managing and making organizational and technological decisions can be partially transferred to a specially developed neural network that has access to an array of data on previously implemented projects. This approach allows us to consider the NPP construction project as a cyber-physical system and opens the way to a whole range of areas of fundamental and applied research in the field of technology, organization and management of the construction of NPP.</description><identifier>ISSN: 1742-6588</identifier><identifier>EISSN: 1742-6596</identifier><identifier>DOI: 10.1088/1742-6596/1889/2/022104</identifier><language>eng</language><publisher>Bristol: IOP Publishing</publisher><subject>Capital costs ; Construction ; Cyber-physical systems ; Enlargement ; Manufacturing engineering ; Mechanical engineering ; Neural networks ; Physics ; Reengineering</subject><ispartof>Journal of physics. Conference series, 2021-04, Vol.1889 (2), p.22104</ispartof><rights>2021. This work is published under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c2484-f21f3910fff3b71d3f3d47c0d9ac7a65dd3519e45ab33ddf00d7bd94953d509a3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.proquest.com/docview/2528497349?pq-origsite=primo$$EHTML$$P50$$Gproquest$$Hfree_for_read</linktohtml><link.rule.ids>314,780,784,25753,27924,27925,37012,44590</link.rule.ids></links><search><creatorcontrib>Voronkov, I E</creatorcontrib><creatorcontrib>Usmanov, T A</creatorcontrib><title>Reengineering of organizational and technological processes of NPP construction</title><title>Journal of physics. Conference series</title><description>Nuclear power construction is characterized by high capital costs, a significant number of participants in the design and construction processes. One of the most significant factors of the efficiency of NPP projects implementation is the adopted technology for the construction. An analysis of the Soviet and modern experience in the NPPs construction allows to assert that the piece reinforcing application leads to an increase in the project implementation time. The technology of large-block assembling of NPP structures and equipment have been widely used by the world leaders in NPPs construction, but the implementation of this technology required significant costs for the organization of the necessary infrastructure. In the context of the rapid development of computing systems, instrumentation and mechanical engineering, it is proposed to fundamentally rethink the processes of NPP construction. It is proposed to return to the technologies of large-block installation of NPP structures by switching from rail lifting mechanisms to pneumatic wheels, by robotizing the processes of enlargement and installation of structures and equipment. The functions of managing and making organizational and technological decisions can be partially transferred to a specially developed neural network that has access to an array of data on previously implemented projects. This approach allows us to consider the NPP construction project as a cyber-physical system and opens the way to a whole range of areas of fundamental and applied research in the field of technology, organization and management of the construction of NPP.</description><subject>Capital costs</subject><subject>Construction</subject><subject>Cyber-physical systems</subject><subject>Enlargement</subject><subject>Manufacturing engineering</subject><subject>Mechanical engineering</subject><subject>Neural networks</subject><subject>Physics</subject><subject>Reengineering</subject><issn>1742-6588</issn><issn>1742-6596</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><sourceid>PIMPY</sourceid><recordid>eNo9kFtLxDAQhYMouK7-Bgs-1-baJI-yqCss7iL6HNJcapearEn3QX-9LZWdlxlmzhwOHwC3CN4jKESFOMVlzWRdISFkhSuIMYL0DCxOl_PTLMQluMp5DyEZiy_A9s250HbBudSFtoi-iKnVofvVQxeD7gsdbDE48xliH9vOjJtDisbl7PKkft3tChNDHtLRTB_X4MLrPrub_74EH0-P76t1udk-v6weNqXBVNDSY-SJRNB7TxqOLPHEUm6gldpwXTNrCUPSUaYbQqz1EFreWEklI5ZBqckS3M2-Y5rvo8uD2sdjGgNnhRkWVHJC5ajis8qkmHNyXh1S96XTj0JQTfTUxEVNjNRET2E10yN_UlpjrA</recordid><startdate>20210401</startdate><enddate>20210401</enddate><creator>Voronkov, I E</creator><creator>Usmanov, T A</creator><general>IOP Publishing</general><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>8FE</scope><scope>8FG</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>ARAPS</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BGLVJ</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>H8D</scope><scope>HCIFZ</scope><scope>L7M</scope><scope>P5Z</scope><scope>P62</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope></search><sort><creationdate>20210401</creationdate><title>Reengineering of organizational and technological processes of NPP construction</title><author>Voronkov, I E ; Usmanov, T A</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c2484-f21f3910fff3b71d3f3d47c0d9ac7a65dd3519e45ab33ddf00d7bd94953d509a3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2021</creationdate><topic>Capital costs</topic><topic>Construction</topic><topic>Cyber-physical systems</topic><topic>Enlargement</topic><topic>Manufacturing engineering</topic><topic>Mechanical engineering</topic><topic>Neural networks</topic><topic>Physics</topic><topic>Reengineering</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Voronkov, I E</creatorcontrib><creatorcontrib>Usmanov, T A</creatorcontrib><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>ProQuest Central (Alumni)</collection><collection>ProQuest Central</collection><collection>Advanced Technologies &amp; Aerospace Collection</collection><collection>ProQuest Central Essentials</collection><collection>AUTh Library subscriptions: ProQuest Central</collection><collection>Technology Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central</collection><collection>Aerospace Database</collection><collection>SciTech Premium Collection</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>ProQuest advanced technologies &amp; aerospace journals</collection><collection>ProQuest Advanced Technologies &amp; Aerospace Collection</collection><collection>Publicly Available Content Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><jtitle>Journal of physics. Conference series</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Voronkov, I E</au><au>Usmanov, T A</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Reengineering of organizational and technological processes of NPP construction</atitle><jtitle>Journal of physics. Conference series</jtitle><date>2021-04-01</date><risdate>2021</risdate><volume>1889</volume><issue>2</issue><spage>22104</spage><pages>22104-</pages><issn>1742-6588</issn><eissn>1742-6596</eissn><abstract>Nuclear power construction is characterized by high capital costs, a significant number of participants in the design and construction processes. One of the most significant factors of the efficiency of NPP projects implementation is the adopted technology for the construction. An analysis of the Soviet and modern experience in the NPPs construction allows to assert that the piece reinforcing application leads to an increase in the project implementation time. The technology of large-block assembling of NPP structures and equipment have been widely used by the world leaders in NPPs construction, but the implementation of this technology required significant costs for the organization of the necessary infrastructure. In the context of the rapid development of computing systems, instrumentation and mechanical engineering, it is proposed to fundamentally rethink the processes of NPP construction. It is proposed to return to the technologies of large-block installation of NPP structures by switching from rail lifting mechanisms to pneumatic wheels, by robotizing the processes of enlargement and installation of structures and equipment. The functions of managing and making organizational and technological decisions can be partially transferred to a specially developed neural network that has access to an array of data on previously implemented projects. This approach allows us to consider the NPP construction project as a cyber-physical system and opens the way to a whole range of areas of fundamental and applied research in the field of technology, organization and management of the construction of NPP.</abstract><cop>Bristol</cop><pub>IOP Publishing</pub><doi>10.1088/1742-6596/1889/2/022104</doi><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 1742-6588
ispartof Journal of physics. Conference series, 2021-04, Vol.1889 (2), p.22104
issn 1742-6588
1742-6596
language eng
recordid cdi_proquest_journals_2528497349
source Publicly Available Content Database; Free Full-Text Journals in Chemistry
subjects Capital costs
Construction
Cyber-physical systems
Enlargement
Manufacturing engineering
Mechanical engineering
Neural networks
Physics
Reengineering
title Reengineering of organizational and technological processes of NPP construction
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-24T03%3A08%3A39IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Reengineering%20of%20organizational%20and%20technological%20processes%20of%20NPP%20construction&rft.jtitle=Journal%20of%20physics.%20Conference%20series&rft.au=Voronkov,%20I%20E&rft.date=2021-04-01&rft.volume=1889&rft.issue=2&rft.spage=22104&rft.pages=22104-&rft.issn=1742-6588&rft.eissn=1742-6596&rft_id=info:doi/10.1088/1742-6596/1889/2/022104&rft_dat=%3Cproquest_cross%3E2528497349%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c2484-f21f3910fff3b71d3f3d47c0d9ac7a65dd3519e45ab33ddf00d7bd94953d509a3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2528497349&rft_id=info:pmid/&rfr_iscdi=true