Being aware of the construction machinery work efficiency is one of the key conditions of dynamic planning of machine work at the construction site and it can be considered as one of the earthworks sustainability factors. The main topic of this paper is the time study analysis of one standard techno...
Saved in:
Published in: | IOP conference series. Earth and environmental science 2019-01, Vol.222 (1), p.12009 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Being aware of the construction machinery work efficiency is one of the key conditions of dynamic planning of machine work at the construction site and it can be considered as one of the earthworks sustainability factors. The main topic of this paper is the time study analysis of one standard technological cyclic construction machine process (the excavators' loading the transportation vehicle), which was observed on-and-off site and analysed. On-site data was obtained by snapback chronometry method with the purpose of determining actual work efficiency; while the (off-site) planned work efficiency was determined using the standardized tables. The aim was to determine the existence of a deviation and examine the differences between planned and actual work efficiency of particular technological process in earthworks as well as to identify its cost-effective area as a prerequisite for identifying the earthworks sustainability. As the earthworks sustainability is the synthesis and concordance of beneficial activities for technological, economic, environmental and social performance context, the balance of excavators' work efficiency is needed. It was concluded that in order to achieve sustainability, i.e. to be in cost-effective area, the maximum value of excavators' cycle time extends up to 50 seconds. |
---|---|
ISSN: | 1755-1307 1755-1315 1755-1315 |