Loading…
A Coordinate Method between the System and Bus Load Forecasting in Electricity Market Environment
In view of the problems such as excessive tensile load factor of nodal bus and overload of load flow section that often occur during the trial operation of Guangdong Electric Power Spot Market, the coordination mechanism between the system and bus load forecasting results is studied in this paper. F...
Saved in:
Published in: | IOP conference series. Materials Science and Engineering 2019-06, Vol.486 (1), p.12150 |
---|---|
Main Authors: | , , , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | |
container_end_page | |
container_issue | 1 |
container_start_page | 12150 |
container_title | IOP conference series. Materials Science and Engineering |
container_volume | 486 |
creator | Cai, Qiuna Zhang, Qiaoyu Liu, Sijie Yan, Binjie Su, Binghong Yi, Jiangwen Li, Bing |
description | In view of the problems such as excessive tensile load factor of nodal bus and overload of load flow section that often occur during the trial operation of Guangdong Electric Power Spot Market, the coordination mechanism between the system and bus load forecasting results is studied in this paper. Firstly, the time-sharing credibility coordination model of the system-bus is established based on the least square method, so as to achieve the goal of load balance between upper and lower grades and the minimum overall error. Secondly, the different classification of the time-sharing credibility model is studied to adapt to different kinds of situation. Finally, a province is taken as an example to verify the effectiveness of the proposed method, and the results show that it has certain engineering application value. |
doi_str_mv | 10.1088/1757-899X/486/1/012150 |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2560881610</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2560881610</sourcerecordid><originalsourceid>FETCH-LOGICAL-c3270-88a06f4c3f9ebf5af58ed12c83df3fa99b551923a96b07462fbe7c757abca1903</originalsourceid><addsrcrecordid>eNqFkF9LwzAUxYMoOKdfQQK--FKb9G_6OEenwoYPU_AtpOmN69ySmmTKvr0tlYkg-HQv3HPO5fwQuqTkhhLGQpqnecCK4iVMWBbSkNCIpuQIjQ6H48PO6Ck6c25NSJYnCRkhMcFTY2zdaOEBL8CvTI0r8J8AGvsV4OXeedhioWt8u3N4bkSNZ8aCFM43-hU3GpcbkN42svF7vBD2DTwu9Udjjd6C9ufoRImNg4vvOUbPs_Jpeh_MH-8eppN5IOMoJwFjgmQqkbEqoFKpUCmDmkaSxbWKlSiKKk1pEcWiyCqSJ1mkKshl10pUUtCCxGN0NeS21rzvwHm-Njuru5c8SrMOFM1or8oGlbTGOQuKt7bZCrvnlPAeJ-9J8Z4a73ByygecnTEajI1pf5L_NV3_YVosy18y3nYVvwDiAoTr</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2560881610</pqid></control><display><type>article</type><title>A Coordinate Method between the System and Bus Load Forecasting in Electricity Market Environment</title><source>Publicly Available Content (ProQuest)</source><source>Free Full-Text Journals in Chemistry</source><creator>Cai, Qiuna ; Zhang, Qiaoyu ; Liu, Sijie ; Yan, Binjie ; Su, Binghong ; Yi, Jiangwen ; Li, Bing</creator><creatorcontrib>Cai, Qiuna ; Zhang, Qiaoyu ; Liu, Sijie ; Yan, Binjie ; Su, Binghong ; Yi, Jiangwen ; Li, Bing</creatorcontrib><description>In view of the problems such as excessive tensile load factor of nodal bus and overload of load flow section that often occur during the trial operation of Guangdong Electric Power Spot Market, the coordination mechanism between the system and bus load forecasting results is studied in this paper. Firstly, the time-sharing credibility coordination model of the system-bus is established based on the least square method, so as to achieve the goal of load balance between upper and lower grades and the minimum overall error. Secondly, the different classification of the time-sharing credibility model is studied to adapt to different kinds of situation. Finally, a province is taken as an example to verify the effectiveness of the proposed method, and the results show that it has certain engineering application value.</description><identifier>ISSN: 1757-8981</identifier><identifier>EISSN: 1757-899X</identifier><identifier>DOI: 10.1088/1757-899X/486/1/012150</identifier><language>eng</language><publisher>Bristol: IOP Publishing</publisher><subject>Coordination models ; Economic forecasting ; Electrical loads ; Electricity distribution ; Mathematical models ; Tensile stress ; Time sharing</subject><ispartof>IOP conference series. Materials Science and Engineering, 2019-06, Vol.486 (1), p.12150</ispartof><rights>Published under licence by IOP Publishing Ltd</rights><rights>2019. This work is published under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.proquest.com/docview/2560881610?pq-origsite=primo$$EHTML$$P50$$Gproquest$$Hfree_for_read</linktohtml><link.rule.ids>314,780,784,25753,27924,27925,37012,44590</link.rule.ids></links><search><creatorcontrib>Cai, Qiuna</creatorcontrib><creatorcontrib>Zhang, Qiaoyu</creatorcontrib><creatorcontrib>Liu, Sijie</creatorcontrib><creatorcontrib>Yan, Binjie</creatorcontrib><creatorcontrib>Su, Binghong</creatorcontrib><creatorcontrib>Yi, Jiangwen</creatorcontrib><creatorcontrib>Li, Bing</creatorcontrib><title>A Coordinate Method between the System and Bus Load Forecasting in Electricity Market Environment</title><title>IOP conference series. Materials Science and Engineering</title><addtitle>IOP Conf. Ser.: Mater. Sci. Eng</addtitle><description>In view of the problems such as excessive tensile load factor of nodal bus and overload of load flow section that often occur during the trial operation of Guangdong Electric Power Spot Market, the coordination mechanism between the system and bus load forecasting results is studied in this paper. Firstly, the time-sharing credibility coordination model of the system-bus is established based on the least square method, so as to achieve the goal of load balance between upper and lower grades and the minimum overall error. Secondly, the different classification of the time-sharing credibility model is studied to adapt to different kinds of situation. Finally, a province is taken as an example to verify the effectiveness of the proposed method, and the results show that it has certain engineering application value.</description><subject>Coordination models</subject><subject>Economic forecasting</subject><subject>Electrical loads</subject><subject>Electricity distribution</subject><subject>Mathematical models</subject><subject>Tensile stress</subject><subject>Time sharing</subject><issn>1757-8981</issn><issn>1757-899X</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2019</creationdate><recordtype>article</recordtype><sourceid>PIMPY</sourceid><recordid>eNqFkF9LwzAUxYMoOKdfQQK--FKb9G_6OEenwoYPU_AtpOmN69ySmmTKvr0tlYkg-HQv3HPO5fwQuqTkhhLGQpqnecCK4iVMWBbSkNCIpuQIjQ6H48PO6Ck6c25NSJYnCRkhMcFTY2zdaOEBL8CvTI0r8J8AGvsV4OXeedhioWt8u3N4bkSNZ8aCFM43-hU3GpcbkN42svF7vBD2DTwu9Udjjd6C9ufoRImNg4vvOUbPs_Jpeh_MH-8eppN5IOMoJwFjgmQqkbEqoFKpUCmDmkaSxbWKlSiKKk1pEcWiyCqSJ1mkKshl10pUUtCCxGN0NeS21rzvwHm-Njuru5c8SrMOFM1or8oGlbTGOQuKt7bZCrvnlPAeJ-9J8Z4a73ByygecnTEajI1pf5L_NV3_YVosy18y3nYVvwDiAoTr</recordid><startdate>20190601</startdate><enddate>20190601</enddate><creator>Cai, Qiuna</creator><creator>Zhang, Qiaoyu</creator><creator>Liu, Sijie</creator><creator>Yan, Binjie</creator><creator>Su, Binghong</creator><creator>Yi, Jiangwen</creator><creator>Li, Bing</creator><general>IOP Publishing</general><scope>O3W</scope><scope>TSCCA</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>8FE</scope><scope>8FG</scope><scope>ABJCF</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BGLVJ</scope><scope>CCPQU</scope><scope>D1I</scope><scope>DWQXO</scope><scope>HCIFZ</scope><scope>KB.</scope><scope>L6V</scope><scope>M7S</scope><scope>PDBOC</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope><scope>PTHSS</scope></search><sort><creationdate>20190601</creationdate><title>A Coordinate Method between the System and Bus Load Forecasting in Electricity Market Environment</title><author>Cai, Qiuna ; Zhang, Qiaoyu ; Liu, Sijie ; Yan, Binjie ; Su, Binghong ; Yi, Jiangwen ; Li, Bing</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c3270-88a06f4c3f9ebf5af58ed12c83df3fa99b551923a96b07462fbe7c757abca1903</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2019</creationdate><topic>Coordination models</topic><topic>Economic forecasting</topic><topic>Electrical loads</topic><topic>Electricity distribution</topic><topic>Mathematical models</topic><topic>Tensile stress</topic><topic>Time sharing</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Cai, Qiuna</creatorcontrib><creatorcontrib>Zhang, Qiaoyu</creatorcontrib><creatorcontrib>Liu, Sijie</creatorcontrib><creatorcontrib>Yan, Binjie</creatorcontrib><creatorcontrib>Su, Binghong</creatorcontrib><creatorcontrib>Yi, Jiangwen</creatorcontrib><creatorcontrib>Li, Bing</creatorcontrib><collection>Open Access: IOP Publishing Free Content</collection><collection>IOPscience (Open Access)</collection><collection>CrossRef</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>Materials Science & Engineering Collection</collection><collection>ProQuest Central (Alumni)</collection><collection>ProQuest Central</collection><collection>ProQuest Central Essentials</collection><collection>ProQuest Central</collection><collection>Technology Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Materials Science Collection</collection><collection>ProQuest Central Korea</collection><collection>SciTech Premium Collection</collection><collection>Materials Science Database</collection><collection>ProQuest Engineering Collection</collection><collection>Engineering Database</collection><collection>Materials science collection</collection><collection>Publicly Available Content (ProQuest)</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><collection>Engineering collection</collection><jtitle>IOP conference series. Materials Science and Engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Cai, Qiuna</au><au>Zhang, Qiaoyu</au><au>Liu, Sijie</au><au>Yan, Binjie</au><au>Su, Binghong</au><au>Yi, Jiangwen</au><au>Li, Bing</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A Coordinate Method between the System and Bus Load Forecasting in Electricity Market Environment</atitle><jtitle>IOP conference series. Materials Science and Engineering</jtitle><addtitle>IOP Conf. Ser.: Mater. Sci. Eng</addtitle><date>2019-06-01</date><risdate>2019</risdate><volume>486</volume><issue>1</issue><spage>12150</spage><pages>12150-</pages><issn>1757-8981</issn><eissn>1757-899X</eissn><abstract>In view of the problems such as excessive tensile load factor of nodal bus and overload of load flow section that often occur during the trial operation of Guangdong Electric Power Spot Market, the coordination mechanism between the system and bus load forecasting results is studied in this paper. Firstly, the time-sharing credibility coordination model of the system-bus is established based on the least square method, so as to achieve the goal of load balance between upper and lower grades and the minimum overall error. Secondly, the different classification of the time-sharing credibility model is studied to adapt to different kinds of situation. Finally, a province is taken as an example to verify the effectiveness of the proposed method, and the results show that it has certain engineering application value.</abstract><cop>Bristol</cop><pub>IOP Publishing</pub><doi>10.1088/1757-899X/486/1/012150</doi><tpages>6</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1757-8981 |
ispartof | IOP conference series. Materials Science and Engineering, 2019-06, Vol.486 (1), p.12150 |
issn | 1757-8981 1757-899X |
language | eng |
recordid | cdi_proquest_journals_2560881610 |
source | Publicly Available Content (ProQuest); Free Full-Text Journals in Chemistry |
subjects | Coordination models Economic forecasting Electrical loads Electricity distribution Mathematical models Tensile stress Time sharing |
title | A Coordinate Method between the System and Bus Load Forecasting in Electricity Market Environment |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-29T02%3A49%3A27IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20Coordinate%20Method%20between%20the%20System%20and%20Bus%20Load%20Forecasting%20in%20Electricity%20Market%20Environment&rft.jtitle=IOP%20conference%20series.%20Materials%20Science%20and%20Engineering&rft.au=Cai,%20Qiuna&rft.date=2019-06-01&rft.volume=486&rft.issue=1&rft.spage=12150&rft.pages=12150-&rft.issn=1757-8981&rft.eissn=1757-899X&rft_id=info:doi/10.1088/1757-899X/486/1/012150&rft_dat=%3Cproquest_cross%3E2560881610%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c3270-88a06f4c3f9ebf5af58ed12c83df3fa99b551923a96b07462fbe7c757abca1903%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2560881610&rft_id=info:pmid/&rfr_iscdi=true |