Loading…

Study on Energy Productivity Ratio (EPR) on Pre-Factory Design of Glucose Syrup at Riau Indonesia

The aim of this investigation is to determine the performance of productivity and feasibility of the operation of glucose syrup plant based on Energy Productivity Ratio (EPR). EPR is expressed as the ratio of output to input energy and by-product. Glucose syrup plant is to process dregs of sago to b...

Full description

Saved in:
Bibliographic Details
Published in:IOP conference series. Materials Science and Engineering 2019-05, Vol.505 (1), p.12073
Main Authors: Haryanto, B, Harahap, H, Tambun, R, Hasibuan, R, Suherman, P, Kelvin, Haryanto, D, Wijaya, J
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The aim of this investigation is to determine the performance of productivity and feasibility of the operation of glucose syrup plant based on Energy Productivity Ratio (EPR). EPR is expressed as the ratio of output to input energy and by-product. Glucose syrup plant is to process dregs of sago to become glucose product. The procedure starts from collecting data needed as input energy such as: dregs of sago prices, energy demand and the depreciation of the factory. The output energy and its by-product comprise the whole production process such as: glucose syrup price and the remaining product calcium chloride. Calculation the equal energy of glucose syrup is to analyze the value of Energy Productivity Ratio (R) based on processing capacity per year, the value of EPR was 2,19 and 4,47 (EPR > 1), which indicated that the processing dregs of sago to glucose syrup is reasonable to be operated based on the energy productivity.
ISSN:1757-8981
1757-899X
DOI:10.1088/1757-899X/505/1/012073