Loading…
Method for Designing Log Holding Grounds in HPP Reservoirs Constructed on Forest Lands
A combined method for designing log holding grounds in reservoirs is described. It meets regulatory requirements and allows for the loads exerted by the log jam, thus allowing well-grounded account of loads when designing elements of a holding ground.
Saved in:
Published in: | Power technology and engineering 2022-07, Vol.56 (2), p.190-195 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | A combined method for designing log holding grounds in reservoirs is described. It meets regulatory requirements and allows for the loads exerted by the log jam, thus allowing well-grounded account of loads when designing elements of a holding ground. |
---|---|
ISSN: | 1570-145X 1570-1468 |
DOI: | 10.1007/s10749-023-01493-0 |