Loading…

System engineering approach on assessment of future development for computerized simulator

The need to familiarize of reactor system especially for first of a kind (FOAK) type reactor is a must for nuclear regulatory body. Facing the upcoming new type of reactor that will be submitted for licensing in Indonesia requires a certain level of competency and knowledge for evaluators. A new typ...

Full description

Saved in:
Bibliographic Details
Main Authors: Susanto, Arifin Muhammad, Alamsyah, Reno, Siwhan, Nur, Haifani, Akhmad Muktaf
Format: Conference Proceeding
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The need to familiarize of reactor system especially for first of a kind (FOAK) type reactor is a must for nuclear regulatory body. Facing the upcoming new type of reactor that will be submitted for licensing in Indonesia requires a certain level of competency and knowledge for evaluators. A new type of reactor consists of a Molten Salt Reactor (MSR), a High Temperature Gas Cooled Reactor (HTGR), and others. One of the various ways to speed up the level of those requirements is by directly connecting to the system itself via a system that mimics the actual reactor simulator. Mostly, our human resources familiar with existing reactor instead of those mentioned above. Hence, the development of reactor simulators is practically beneficial to increasing and somehow polishing the personnel skills especially on certain type of reactor. Methodology on system engineering approach is applied to identify the needs, constraint, and control. In the early development of this project, a system engineering approach was applied to gather, collect, and grab information from the stakeholders as well as the opportunity from new advanced technology in information and nuclear systems. The concept development stage in system engineering was generally followed using System Modeling Languange (SysML). This paper described only on conceptual design phase in early project due to technical boundary yet to be decided. Ultimately, a user requirement document for the early phasewas developed. This document is as a based to be continued further.
ISSN:0094-243X
1551-7616
DOI:10.1063/5.0173263