Experience in Implementing the Telemechanics Subsystem of a Digital Substation

This article discusses the issues of the optimization of digital exchange and the structure of a local computer network during the implementation of the telemechanics subsystem of a 110/10 kV substation using the equipment of the company DEP. Additionally, the automation system is implemented using...

Full description

Saved in:
Bibliographic Details
Published in:Power technology and engineering 2023-09, Vol.57 (3), p.470-473
Main Authors: Bochenkov, I. N., Dobrokhotov, D. S., Negodin, I. S., Trofimov, A. V.
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This article discusses the issues of the optimization of digital exchange and the structure of a local computer network during the implementation of the telemechanics subsystem of a 110/10 kV substation using the equipment of the company DEP. Additionally, the automation system is implemented using digital substation technologies. As the main part of the bay is connected to a 10 kV integrated switchgear containing 42 cells, herein, the emphasis is given to the implementation of the connection controller and distributed signal input/output modules of this switchgear.
ISSN:1570-145X
1570-1468
DOI:10.1007/s10749-023-01688-5