Experience in Implementing the Telemechanics Subsystem of a Digital Substation
This article discusses the issues of the optimization of digital exchange and the structure of a local computer network during the implementation of the telemechanics subsystem of a 110/10 kV substation using the equipment of the company DEP. Additionally, the automation system is implemented using...
Saved in:
Published in: | Power technology and engineering 2023-09, Vol.57 (3), p.470-473 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This article discusses the issues of the optimization of digital exchange and the structure of a local computer network during the implementation of the telemechanics subsystem of a 110/10 kV substation using the equipment of the company DEP. Additionally, the automation system is implemented using digital substation technologies. As the main part of the bay is connected to a 10 kV integrated switchgear containing 42 cells, herein, the emphasis is given to the implementation of the connection controller and distributed signal input/output modules of this switchgear. |
---|---|
ISSN: | 1570-145X 1570-1468 |
DOI: | 10.1007/s10749-023-01688-5 |