Quantitative Analysis of the Factors Influencing Field Installation Time for Precast Concrete Building Components: An Empirical Study

Installation time for precast concrete (PC) components varies due to component-, location-, and weather-related factors. Because such variability affects the cost, time, and sustainability performance of PC projects, it is important to identify and classify the factors influencing installation time...

Full description

Saved in:
Bibliographic Details
Published in:Journal of management in engineering 2024-05, Vol.40 (3)
Main Authors: Jeong, Eunbeen, Jang, Junyoung, Lee, Seulbi, Ahn, Seungjun, Kim, Tae Wan
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites cdi_FETCH-LOGICAL-c279t-e9b06587c4b894a3376b87568af358f7875ddcf684ca9c0feb7ce224c778eb1d3
container_end_page
container_issue 3
container_start_page
container_title Journal of management in engineering
container_volume 40
creator Jeong, Eunbeen
Jang, Junyoung
Lee, Seulbi
Ahn, Seungjun
Kim, Tae Wan
description Installation time for precast concrete (PC) components varies due to component-, location-, and weather-related factors. Because such variability affects the cost, time, and sustainability performance of PC projects, it is important to identify and classify the factors influencing installation time for different types of PC components. Against this background, this study aims to empirically investigate variability in installation time for PC components and different work steps and then identify the factors that affect particular work steps most significantly. To achieve the goal, this study gathered installation time and other influencing factors data from an actual project for 25 days and analyzed the data using a descriptive approach and the recursive feature elimination with cross-validation (RFECV) analysis. The analysis result provides empirical evidence that different PC types and work steps are involved with different levels of variability in installation time. The highest level of variability was shown in PC beams and assembly work. Regarding the factors influencing installation time, it is shown that different work steps are affected by different sets of influencing factors, with temperature and wind speed as the most common influencing factors across different PC types and work steps. This study contributes to the body of knowledge of off-site construction management by offering empirical evidence on the variability in PC installation time and the specific factors affecting PC installation time.
doi_str_mv 10.1061/JMENEA.MEENG-5816
format article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2930425664</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2930425664</sourcerecordid><originalsourceid>FETCH-LOGICAL-c279t-e9b06587c4b894a3376b87568af358f7875ddcf684ca9c0feb7ce224c778eb1d3</originalsourceid><addsrcrecordid>eNotkN1KwzAUx4MoOKcP4F3A686kTZPWu1m6Odmm4gTvSpommtEmM0mFPYDvbee8OofD_4PzA-AaowlGFN8-rsp1OZ2synI9j9IM0xMwwjlJopSw_BSMECNxlObs_RxceL9FCMUM4RH4eem5CTrwoL8lnBre7r320CoYPiWccRGs83BhVNtLI7T5gDMt22a4-MDbdrBZAze6k1BZB5-dFNwHWFgjnAwS3ve6bQ6uwnY7a6QJ_m5ogWW3004L3sLX0Df7S3CmeOvl1f8cg7dZuSkeouXTfFFMl5GIWR4imdeIphkTpM5ywpOE0TpjKc24StJMsWFvGqFoRgTPBVKyZkLGMRGMZbLGTTIGN8fcnbNfvfSh2treDU_7Ks4TROKUUjKo8FElnPXeSVXtnO6421cYVQfa1ZF29Ue7OtBOfgEjPnXe</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2930425664</pqid></control><display><type>article</type><title>Quantitative Analysis of the Factors Influencing Field Installation Time for Precast Concrete Building Components: An Empirical Study</title><source>ASCE Library (civil engineering)</source><creator>Jeong, Eunbeen ; Jang, Junyoung ; Lee, Seulbi ; Ahn, Seungjun ; Kim, Tae Wan</creator><creatorcontrib>Jeong, Eunbeen ; Jang, Junyoung ; Lee, Seulbi ; Ahn, Seungjun ; Kim, Tae Wan</creatorcontrib><description>Installation time for precast concrete (PC) components varies due to component-, location-, and weather-related factors. Because such variability affects the cost, time, and sustainability performance of PC projects, it is important to identify and classify the factors influencing installation time for different types of PC components. Against this background, this study aims to empirically investigate variability in installation time for PC components and different work steps and then identify the factors that affect particular work steps most significantly. To achieve the goal, this study gathered installation time and other influencing factors data from an actual project for 25 days and analyzed the data using a descriptive approach and the recursive feature elimination with cross-validation (RFECV) analysis. The analysis result provides empirical evidence that different PC types and work steps are involved with different levels of variability in installation time. The highest level of variability was shown in PC beams and assembly work. Regarding the factors influencing installation time, it is shown that different work steps are affected by different sets of influencing factors, with temperature and wind speed as the most common influencing factors across different PC types and work steps. This study contributes to the body of knowledge of off-site construction management by offering empirical evidence on the variability in PC installation time and the specific factors affecting PC installation time.</description><identifier>ISSN: 0742-597X</identifier><identifier>EISSN: 1943-5479</identifier><identifier>DOI: 10.1061/JMENEA.MEENG-5816</identifier><language>eng</language><publisher>New York: American Society of Civil Engineers</publisher><subject>Building components ; Construction management ; Empirical analysis ; Precast concrete ; Reinforced concrete ; Wind speed</subject><ispartof>Journal of management in engineering, 2024-05, Vol.40 (3)</ispartof><rights>2024 American Society of Civil Engineers</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c279t-e9b06587c4b894a3376b87568af358f7875ddcf684ca9c0feb7ce224c778eb1d3</cites><orcidid>0000-0002-7137-1832 ; 0000-0001-7427-8986 ; 0009-0003-1285-1494 ; 0000-0002-7887-1055</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,3252,27924,27925</link.rule.ids></links><search><creatorcontrib>Jeong, Eunbeen</creatorcontrib><creatorcontrib>Jang, Junyoung</creatorcontrib><creatorcontrib>Lee, Seulbi</creatorcontrib><creatorcontrib>Ahn, Seungjun</creatorcontrib><creatorcontrib>Kim, Tae Wan</creatorcontrib><title>Quantitative Analysis of the Factors Influencing Field Installation Time for Precast Concrete Building Components: An Empirical Study</title><title>Journal of management in engineering</title><description>Installation time for precast concrete (PC) components varies due to component-, location-, and weather-related factors. Because such variability affects the cost, time, and sustainability performance of PC projects, it is important to identify and classify the factors influencing installation time for different types of PC components. Against this background, this study aims to empirically investigate variability in installation time for PC components and different work steps and then identify the factors that affect particular work steps most significantly. To achieve the goal, this study gathered installation time and other influencing factors data from an actual project for 25 days and analyzed the data using a descriptive approach and the recursive feature elimination with cross-validation (RFECV) analysis. The analysis result provides empirical evidence that different PC types and work steps are involved with different levels of variability in installation time. The highest level of variability was shown in PC beams and assembly work. Regarding the factors influencing installation time, it is shown that different work steps are affected by different sets of influencing factors, with temperature and wind speed as the most common influencing factors across different PC types and work steps. This study contributes to the body of knowledge of off-site construction management by offering empirical evidence on the variability in PC installation time and the specific factors affecting PC installation time.</description><subject>Building components</subject><subject>Construction management</subject><subject>Empirical analysis</subject><subject>Precast concrete</subject><subject>Reinforced concrete</subject><subject>Wind speed</subject><issn>0742-597X</issn><issn>1943-5479</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2024</creationdate><recordtype>article</recordtype><recordid>eNotkN1KwzAUx4MoOKcP4F3A686kTZPWu1m6Odmm4gTvSpommtEmM0mFPYDvbee8OofD_4PzA-AaowlGFN8-rsp1OZ2synI9j9IM0xMwwjlJopSw_BSMECNxlObs_RxceL9FCMUM4RH4eem5CTrwoL8lnBre7r320CoYPiWccRGs83BhVNtLI7T5gDMt22a4-MDbdrBZAze6k1BZB5-dFNwHWFgjnAwS3ve6bQ6uwnY7a6QJ_m5ogWW3004L3sLX0Df7S3CmeOvl1f8cg7dZuSkeouXTfFFMl5GIWR4imdeIphkTpM5ywpOE0TpjKc24StJMsWFvGqFoRgTPBVKyZkLGMRGMZbLGTTIGN8fcnbNfvfSh2treDU_7Ks4TROKUUjKo8FElnPXeSVXtnO6421cYVQfa1ZF29Ue7OtBOfgEjPnXe</recordid><startdate>20240501</startdate><enddate>20240501</enddate><creator>Jeong, Eunbeen</creator><creator>Jang, Junyoung</creator><creator>Lee, Seulbi</creator><creator>Ahn, Seungjun</creator><creator>Kim, Tae Wan</creator><general>American Society of Civil Engineers</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7TA</scope><scope>7TB</scope><scope>8FD</scope><scope>FR3</scope><scope>JG9</scope><scope>KR7</scope><orcidid>https://orcid.org/0000-0002-7137-1832</orcidid><orcidid>https://orcid.org/0000-0001-7427-8986</orcidid><orcidid>https://orcid.org/0009-0003-1285-1494</orcidid><orcidid>https://orcid.org/0000-0002-7887-1055</orcidid></search><sort><creationdate>20240501</creationdate><title>Quantitative Analysis of the Factors Influencing Field Installation Time for Precast Concrete Building Components: An Empirical Study</title><author>Jeong, Eunbeen ; Jang, Junyoung ; Lee, Seulbi ; Ahn, Seungjun ; Kim, Tae Wan</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c279t-e9b06587c4b894a3376b87568af358f7875ddcf684ca9c0feb7ce224c778eb1d3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2024</creationdate><topic>Building components</topic><topic>Construction management</topic><topic>Empirical analysis</topic><topic>Precast concrete</topic><topic>Reinforced concrete</topic><topic>Wind speed</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Jeong, Eunbeen</creatorcontrib><creatorcontrib>Jang, Junyoung</creatorcontrib><creatorcontrib>Lee, Seulbi</creatorcontrib><creatorcontrib>Ahn, Seungjun</creatorcontrib><creatorcontrib>Kim, Tae Wan</creatorcontrib><collection>CrossRef</collection><collection>Materials Business File</collection><collection>Mechanical &amp; Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Materials Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Journal of management in engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Jeong, Eunbeen</au><au>Jang, Junyoung</au><au>Lee, Seulbi</au><au>Ahn, Seungjun</au><au>Kim, Tae Wan</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Quantitative Analysis of the Factors Influencing Field Installation Time for Precast Concrete Building Components: An Empirical Study</atitle><jtitle>Journal of management in engineering</jtitle><date>2024-05-01</date><risdate>2024</risdate><volume>40</volume><issue>3</issue><issn>0742-597X</issn><eissn>1943-5479</eissn><abstract>Installation time for precast concrete (PC) components varies due to component-, location-, and weather-related factors. Because such variability affects the cost, time, and sustainability performance of PC projects, it is important to identify and classify the factors influencing installation time for different types of PC components. Against this background, this study aims to empirically investigate variability in installation time for PC components and different work steps and then identify the factors that affect particular work steps most significantly. To achieve the goal, this study gathered installation time and other influencing factors data from an actual project for 25 days and analyzed the data using a descriptive approach and the recursive feature elimination with cross-validation (RFECV) analysis. The analysis result provides empirical evidence that different PC types and work steps are involved with different levels of variability in installation time. The highest level of variability was shown in PC beams and assembly work. Regarding the factors influencing installation time, it is shown that different work steps are affected by different sets of influencing factors, with temperature and wind speed as the most common influencing factors across different PC types and work steps. This study contributes to the body of knowledge of off-site construction management by offering empirical evidence on the variability in PC installation time and the specific factors affecting PC installation time.</abstract><cop>New York</cop><pub>American Society of Civil Engineers</pub><doi>10.1061/JMENEA.MEENG-5816</doi><orcidid>https://orcid.org/0000-0002-7137-1832</orcidid><orcidid>https://orcid.org/0000-0001-7427-8986</orcidid><orcidid>https://orcid.org/0009-0003-1285-1494</orcidid><orcidid>https://orcid.org/0000-0002-7887-1055</orcidid></addata></record>
fulltext fulltext
identifier ISSN: 0742-597X
ispartof Journal of management in engineering, 2024-05, Vol.40 (3)
issn 0742-597X
1943-5479
language eng
recordid cdi_proquest_journals_2930425664
source ASCE Library (civil engineering)
subjects Building components
Construction management
Empirical analysis
Precast concrete
Reinforced concrete
Wind speed
title Quantitative Analysis of the Factors Influencing Field Installation Time for Precast Concrete Building Components: An Empirical Study
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-27T19%3A03%3A35IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Quantitative%20Analysis%20of%20the%20Factors%20Influencing%20Field%20Installation%20Time%20for%20Precast%20Concrete%20Building%20Components:%20An%20Empirical%20Study&rft.jtitle=Journal%20of%20management%20in%20engineering&rft.au=Jeong,%20Eunbeen&rft.date=2024-05-01&rft.volume=40&rft.issue=3&rft.issn=0742-597X&rft.eissn=1943-5479&rft_id=info:doi/10.1061/JMENEA.MEENG-5816&rft_dat=%3Cproquest_cross%3E2930425664%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c279t-e9b06587c4b894a3376b87568af358f7875ddcf684ca9c0feb7ce224c778eb1d3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2930425664&rft_id=info:pmid/&rfr_iscdi=true