Loading…

A new fuzzy model for multi-criteria project portfolio selection based on modified Kerre’s inequality

Recently, a model for project portfolio selection have been proposed. Here, to modify the proposed model, we consider the parameters of model as fuzzy numbers and we call it fuzzy project portfolio selection problem (FPPSP). Since our proposed model is NP-hard problem, then an efficient fuzzy variab...

Full description

Saved in:
Bibliographic Details
Published in:Opsearch 2024-03, Vol.61 (1), p.33-50
Main Authors: Sohrabi, Ali Akbar, Ghanbari, Reza, Ghorbani-Moghadam, Khatere, Sadeghi, Sedigheh
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Recently, a model for project portfolio selection have been proposed. Here, to modify the proposed model, we consider the parameters of model as fuzzy numbers and we call it fuzzy project portfolio selection problem (FPPSP). Since our proposed model is NP-hard problem, then an efficient fuzzy variable neighborhood search (FVNS) algorithm for solving this model is proposed. In several methods, a FPPS is converted to a crisp problem, but in our proposed algorithm, using modified Kerre’s inequality, the fuzzy optimization problem is solved directly, without changing it to a crisp problem. Finally, in order to demonstrate the efficiency of proposed algorithm, the numerical results of FVNS algorithm are compared with the numerical results of recently proposed method.
ISSN:0030-3887
0975-0320
DOI:10.1007/s12597-023-00685-6