Loading…
Models and Methods for Checking the Attainability of Goals and Feasibility of Plans in Large-Scale Systems Using the Example of Goals and Plans for Elimination of the Consequences of Flood
Models and methods have been developed to verify the achievability of goals and the feasibility of plans implemented when managing large-scale systems in their development. An algorithm for analyzing the achievability of a set of goals and plans implemented when managing these systems is proposed an...
Saved in:
Published in: | Automation and remote control 2023-12, Vol.84 (12), p.1283-1293 |
---|---|
Main Authors: | , , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | cdi_FETCH-LOGICAL-c311t-efd393aea9efb57edf02063e561f7e1220566704ab2097a1470f130fa8f3e9c03 |
container_end_page | 1293 |
container_issue | 12 |
container_start_page | 1283 |
container_title | Automation and remote control |
container_volume | 84 |
creator | Tsvirkun, A. D. Rezchikov, A. F. Kushnikov, V. A. Dranko, O. I. Bogomolov, A. S. Selyutin, A. D. |
description | Models and methods have been developed to verify the achievability of goals and the feasibility of plans implemented when managing large-scale systems in their development. An algorithm for analyzing the achievability of a set of goals and plans implemented when managing these systems is proposed and justified. Statements and hypotheses that make it possible to machine-check the feasibility of plans have been generated. A model example is given that confirms the possibility of checking the feasibility of plans for eliminating the consequences of a flood using the developed models and methods. In managing large-scale systems development, it is advisable to use control loops that check the achievability of set goals and the feasibility of plans over a selected time interval. In the absence of this verification, the chosen trajectory of development of a large-scale system at specific points in time may turn out to be unrealizable, which will lead to disruption of the work being carried out, as well as to significant costs of the human, financial, technical and other types of resources for the implementation of obviously impracticable plans. |
doi_str_mv | 10.1134/S000511792312007X |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2973144739</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2973144739</sourcerecordid><originalsourceid>FETCH-LOGICAL-c311t-efd393aea9efb57edf02063e561f7e1220566704ab2097a1470f130fa8f3e9c03</originalsourceid><addsrcrecordid>eNp1kUFrGzEQhUVJoY7bH9CbIOdtZ6T1ynsMxnYKNgm4ht4WeXdkK11LriRD_N_647qLXUwIOQ3Me997A8PYV4RviDL_vgKAEaIqhUQBoH59YAMsYJxJkOKGDXo56_VP7DbGZwBEEHLA_i59Q23k2jV8SWnnm8iND3yyo_q3dVuedsTvU9LW6Y1tbTpxb_jc6wszIx3tVXhqtYvcOr7QYUvZqtYt8dUpJtpHvo7_A6cven_olFdRZ7Yvn7Z23_Ul611v6YmJd5H-HMnVFPvdrPW--cw-mo6mL5c5ZOvZ9OfkIVs8zn9M7hdZLRFTRqaRpdSkSzKbkaLGgIBC0qhAowiFgFFRKMj1RkCpNOYKDEowemwklTXIIbs75x6C726IqXr2x-C6ykqUSmKeq65gyPDsqoOPMZCpDsHudThVCFX_pOrNkzpGnJnYed2WwjX5fegfCBWVQQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2973144739</pqid></control><display><type>article</type><title>Models and Methods for Checking the Attainability of Goals and Feasibility of Plans in Large-Scale Systems Using the Example of Goals and Plans for Elimination of the Consequences of Flood</title><source>Springer Link</source><creator>Tsvirkun, A. D. ; Rezchikov, A. F. ; Kushnikov, V. A. ; Dranko, O. I. ; Bogomolov, A. S. ; Selyutin, A. D.</creator><creatorcontrib>Tsvirkun, A. D. ; Rezchikov, A. F. ; Kushnikov, V. A. ; Dranko, O. I. ; Bogomolov, A. S. ; Selyutin, A. D.</creatorcontrib><description>Models and methods have been developed to verify the achievability of goals and the feasibility of plans implemented when managing large-scale systems in their development. An algorithm for analyzing the achievability of a set of goals and plans implemented when managing these systems is proposed and justified. Statements and hypotheses that make it possible to machine-check the feasibility of plans have been generated. A model example is given that confirms the possibility of checking the feasibility of plans for eliminating the consequences of a flood using the developed models and methods. In managing large-scale systems development, it is advisable to use control loops that check the achievability of set goals and the feasibility of plans over a selected time interval. In the absence of this verification, the chosen trajectory of development of a large-scale system at specific points in time may turn out to be unrealizable, which will lead to disruption of the work being carried out, as well as to significant costs of the human, financial, technical and other types of resources for the implementation of obviously impracticable plans.</description><identifier>ISSN: 0005-1179</identifier><identifier>EISSN: 1608-3032</identifier><identifier>DOI: 10.1134/S000511792312007X</identifier><language>eng</language><publisher>Moscow: Pleiades Publishing</publisher><subject>Algorithms ; CAE) and Design ; Calculus of Variations and Optimal Control; Optimization ; Computer-Aided Engineering (CAD ; Control ; Feasibility ; Flood management ; Mathematics ; Mathematics and Statistics ; Mechanical Engineering ; Mechatronics ; Robotics ; Systems Theory ; Thematic Issue</subject><ispartof>Automation and remote control, 2023-12, Vol.84 (12), p.1283-1293</ispartof><rights>Pleiades Publishing, Ltd. 2023. ISSN 0005-1179, Automation and Remote Control, 2023, Vol. 84, No. 12, pp. 1283–1293. © Pleiades Publishing, Ltd., 2023. Russian Text © The Author(s), 2023, published in Avtomatika i Telemekhanika, 2023, No. 12, pp. 49–63.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c311t-efd393aea9efb57edf02063e561f7e1220566704ab2097a1470f130fa8f3e9c03</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>Tsvirkun, A. D.</creatorcontrib><creatorcontrib>Rezchikov, A. F.</creatorcontrib><creatorcontrib>Kushnikov, V. A.</creatorcontrib><creatorcontrib>Dranko, O. I.</creatorcontrib><creatorcontrib>Bogomolov, A. S.</creatorcontrib><creatorcontrib>Selyutin, A. D.</creatorcontrib><title>Models and Methods for Checking the Attainability of Goals and Feasibility of Plans in Large-Scale Systems Using the Example of Goals and Plans for Elimination of the Consequences of Flood</title><title>Automation and remote control</title><addtitle>Autom Remote Control</addtitle><description>Models and methods have been developed to verify the achievability of goals and the feasibility of plans implemented when managing large-scale systems in their development. An algorithm for analyzing the achievability of a set of goals and plans implemented when managing these systems is proposed and justified. Statements and hypotheses that make it possible to machine-check the feasibility of plans have been generated. A model example is given that confirms the possibility of checking the feasibility of plans for eliminating the consequences of a flood using the developed models and methods. In managing large-scale systems development, it is advisable to use control loops that check the achievability of set goals and the feasibility of plans over a selected time interval. In the absence of this verification, the chosen trajectory of development of a large-scale system at specific points in time may turn out to be unrealizable, which will lead to disruption of the work being carried out, as well as to significant costs of the human, financial, technical and other types of resources for the implementation of obviously impracticable plans.</description><subject>Algorithms</subject><subject>CAE) and Design</subject><subject>Calculus of Variations and Optimal Control; Optimization</subject><subject>Computer-Aided Engineering (CAD</subject><subject>Control</subject><subject>Feasibility</subject><subject>Flood management</subject><subject>Mathematics</subject><subject>Mathematics and Statistics</subject><subject>Mechanical Engineering</subject><subject>Mechatronics</subject><subject>Robotics</subject><subject>Systems Theory</subject><subject>Thematic Issue</subject><issn>0005-1179</issn><issn>1608-3032</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2023</creationdate><recordtype>article</recordtype><recordid>eNp1kUFrGzEQhUVJoY7bH9CbIOdtZ6T1ynsMxnYKNgm4ht4WeXdkK11LriRD_N_647qLXUwIOQ3Me997A8PYV4RviDL_vgKAEaIqhUQBoH59YAMsYJxJkOKGDXo56_VP7DbGZwBEEHLA_i59Q23k2jV8SWnnm8iND3yyo_q3dVuedsTvU9LW6Y1tbTpxb_jc6wszIx3tVXhqtYvcOr7QYUvZqtYt8dUpJtpHvo7_A6cven_olFdRZ7Yvn7Z23_Ul611v6YmJd5H-HMnVFPvdrPW--cw-mo6mL5c5ZOvZ9OfkIVs8zn9M7hdZLRFTRqaRpdSkSzKbkaLGgIBC0qhAowiFgFFRKMj1RkCpNOYKDEowemwklTXIIbs75x6C726IqXr2x-C6ykqUSmKeq65gyPDsqoOPMZCpDsHudThVCFX_pOrNkzpGnJnYed2WwjX5fegfCBWVQQ</recordid><startdate>20231201</startdate><enddate>20231201</enddate><creator>Tsvirkun, A. D.</creator><creator>Rezchikov, A. F.</creator><creator>Kushnikov, V. A.</creator><creator>Dranko, O. I.</creator><creator>Bogomolov, A. S.</creator><creator>Selyutin, A. D.</creator><general>Pleiades Publishing</general><general>Springer Nature B.V</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20231201</creationdate><title>Models and Methods for Checking the Attainability of Goals and Feasibility of Plans in Large-Scale Systems Using the Example of Goals and Plans for Elimination of the Consequences of Flood</title><author>Tsvirkun, A. D. ; Rezchikov, A. F. ; Kushnikov, V. A. ; Dranko, O. I. ; Bogomolov, A. S. ; Selyutin, A. D.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c311t-efd393aea9efb57edf02063e561f7e1220566704ab2097a1470f130fa8f3e9c03</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2023</creationdate><topic>Algorithms</topic><topic>CAE) and Design</topic><topic>Calculus of Variations and Optimal Control; Optimization</topic><topic>Computer-Aided Engineering (CAD</topic><topic>Control</topic><topic>Feasibility</topic><topic>Flood management</topic><topic>Mathematics</topic><topic>Mathematics and Statistics</topic><topic>Mechanical Engineering</topic><topic>Mechatronics</topic><topic>Robotics</topic><topic>Systems Theory</topic><topic>Thematic Issue</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Tsvirkun, A. D.</creatorcontrib><creatorcontrib>Rezchikov, A. F.</creatorcontrib><creatorcontrib>Kushnikov, V. A.</creatorcontrib><creatorcontrib>Dranko, O. I.</creatorcontrib><creatorcontrib>Bogomolov, A. S.</creatorcontrib><creatorcontrib>Selyutin, A. D.</creatorcontrib><collection>CrossRef</collection><jtitle>Automation and remote control</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Tsvirkun, A. D.</au><au>Rezchikov, A. F.</au><au>Kushnikov, V. A.</au><au>Dranko, O. I.</au><au>Bogomolov, A. S.</au><au>Selyutin, A. D.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Models and Methods for Checking the Attainability of Goals and Feasibility of Plans in Large-Scale Systems Using the Example of Goals and Plans for Elimination of the Consequences of Flood</atitle><jtitle>Automation and remote control</jtitle><stitle>Autom Remote Control</stitle><date>2023-12-01</date><risdate>2023</risdate><volume>84</volume><issue>12</issue><spage>1283</spage><epage>1293</epage><pages>1283-1293</pages><issn>0005-1179</issn><eissn>1608-3032</eissn><abstract>Models and methods have been developed to verify the achievability of goals and the feasibility of plans implemented when managing large-scale systems in their development. An algorithm for analyzing the achievability of a set of goals and plans implemented when managing these systems is proposed and justified. Statements and hypotheses that make it possible to machine-check the feasibility of plans have been generated. A model example is given that confirms the possibility of checking the feasibility of plans for eliminating the consequences of a flood using the developed models and methods. In managing large-scale systems development, it is advisable to use control loops that check the achievability of set goals and the feasibility of plans over a selected time interval. In the absence of this verification, the chosen trajectory of development of a large-scale system at specific points in time may turn out to be unrealizable, which will lead to disruption of the work being carried out, as well as to significant costs of the human, financial, technical and other types of resources for the implementation of obviously impracticable plans.</abstract><cop>Moscow</cop><pub>Pleiades Publishing</pub><doi>10.1134/S000511792312007X</doi><tpages>11</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0005-1179 |
ispartof | Automation and remote control, 2023-12, Vol.84 (12), p.1283-1293 |
issn | 0005-1179 1608-3032 |
language | eng |
recordid | cdi_proquest_journals_2973144739 |
source | Springer Link |
subjects | Algorithms CAE) and Design Calculus of Variations and Optimal Control Optimization Computer-Aided Engineering (CAD Control Feasibility Flood management Mathematics Mathematics and Statistics Mechanical Engineering Mechatronics Robotics Systems Theory Thematic Issue |
title | Models and Methods for Checking the Attainability of Goals and Feasibility of Plans in Large-Scale Systems Using the Example of Goals and Plans for Elimination of the Consequences of Flood |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T18%3A11%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Models%20and%20Methods%20for%20Checking%20the%20Attainability%20of%20Goals%20and%20Feasibility%20of%20Plans%20in%20Large-Scale%20Systems%20Using%20the%20Example%20of%20Goals%20and%20Plans%20for%20Elimination%20of%20the%20Consequences%20of%20Flood&rft.jtitle=Automation%20and%20remote%20control&rft.au=Tsvirkun,%20A.%20D.&rft.date=2023-12-01&rft.volume=84&rft.issue=12&rft.spage=1283&rft.epage=1293&rft.pages=1283-1293&rft.issn=0005-1179&rft.eissn=1608-3032&rft_id=info:doi/10.1134/S000511792312007X&rft_dat=%3Cproquest_cross%3E2973144739%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c311t-efd393aea9efb57edf02063e561f7e1220566704ab2097a1470f130fa8f3e9c03%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2973144739&rft_id=info:pmid/&rfr_iscdi=true |