Loading…

Development of SyntheticTest System for Thyristor Voltage Monitoring of Converter Valve

Thyristor voltage monitoring is one core equipment for a light-controlled converter valve, and its performance directly affects the reliability, stability, and efficiency of the whole power system. However, the field test equipment for thyristor voltage monitoring is limited by import, which is disa...

Full description

Saved in:
Bibliographic Details
Published in:Journal of physics. Conference series 2024-03, Vol.2717 (1), p.12045
Main Authors: Bi, Yanhe, Liu, Kun, Yang, Huilei, Qiu, Wenlong
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Thyristor voltage monitoring is one core equipment for a light-controlled converter valve, and its performance directly affects the reliability, stability, and efficiency of the whole power system. However, the field test equipment for thyristor voltage monitoring is limited by import, which is disadvantageous to the operation and maintenance of the converter valve. Thus, developing a synthetic test system for thyristor voltage monitoring is particularly urgent. The synthetic test system for thyristor voltage monitoring is developed based on the operational principle of thyristor voltage monitoring and the technical standard IEC 60700-1, which is subsequently applied to the thyristor valve test. The simulation and test demonstrate this synthetic test system’s reasonability, meeting the need for engineering applications.
ISSN:1742-6588
1742-6596
DOI:10.1088/1742-6596/2717/1/012045