Loading…

Determine the Profiles of Power Consumption in Commercial Buildings in a Very Hot Humid Climate Using a Temporary Series

With the growth of the nations, the commercial and public services sectors have recently seen an increase in their electricity usage. This demonstrates how crucial it is to understand a building’s behavior in order to lower its usage. This requires on-site data collection by qualified professionals...

Full description

Saved in:
Bibliographic Details
Published in:Sustainability 2024-11, Vol.16 (22), p.9770
Main Authors: Vallejo-Coral, E. Catalina, Garzón, Ricardo, Ortega López, Miguel Darío, Martínez-Gómez, Javier, Moya, Marcelo
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:With the growth of the nations, the commercial and public services sectors have recently seen an increase in their electricity usage. This demonstrates how crucial it is to understand a building’s behavior in order to lower its usage. This requires on-site data collection by qualified professionals and specialized equipment, which represents high costs. However, multiple studies have demonstrated that it is possible to find electricity-saving strategies from the study of electricity usage, recorded in an hourly period or less, captured by smart meters. In this context, the present study applies a methodology to determine useful information on the operation and characteristics of public buildings on the Ecuadorian coast based on the data gathered over a period of five consecutive months from smart meters. The methodology consists of four steps: (1) data cleaning and filling, (2) time-series decomposition, (3) the generation of consumption profile and (4) the identification of the temperature influence. According to the results, the pre-cooling of spaces accounts for 5% of all electricity used in the commercial buildings, while prolonged shutdown uses 10%. Approximately USD 1100 per month would be spent on the main building and USD 78 on the agency as a result.
ISSN:2071-1050
2071-1050
DOI:10.3390/su16229770